Text of the determination
Determination
|
Case number
|
12-00-1023147
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1023147 4 October 2024
Determination overview
Complaint
On 2 November 2021, the complainant lodged a claim for storm damage to her home. In the dispute before AFCA the complainant has attributed the damage to storms that had occurred in February/ March 2021.
The insurer declined the claim. The insurer says the damage has not been caused by a storm or any other insured event under the policy. The insurer says the damage has instead been caused by earth or soil movement and defects in design, workmanship or construction. The policy excludes cover for damage from those causes.
Issues and key findings
Is the insurer entitled to deny the claim?
No. The damage was caused by storm, which is an insured event under the policy. The insurer has not shown it is entitled to rely on a policy exclusion to exclude the claim.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer’s handling of the claim has involved avoidable delay and caused the complainant undue stress. The insurer should pay the complainant the sum of $2,000 in non-financial loss compensation
Why is the outcome fair?
The complainant has established, on balance, that the damage was caused by a storm, being an insured event under the policy. The insurer has not established that an exclusion applies. It is fair that the insurer covers the claim. It is also fair that the complainant be compensated for the undue stress caused by the unnecessary delay in the claim handling.
Determination
This determination is in favour of the complainant. Once notified of the complainant’s acceptance of this determination, the insurer must:
within 14 days, pay the complaint $2,000 for the non-financial loss;
within 21 days, engage a building consultant to inspect the property, prepare a scope of works (SOW) for claim related repairs, and a resulting actionable quote;
within 14 days of receiving the building consultants SOW/quote, indicate to the complainant whether it is willing to undertake the repairs or wants to cash settle the claim; and
if cash settling, pay the complainant the quoted amount plus a 20% uplift, less applicable excess within 7 days, if undertaking the work, have the work commenced without delay.
Reasons for determination
The parties provided numerous submissions to AFCA. While this determination does not refer to them all, I have taken each submission into account in reaching my decision.
Is the insurer entitled to deny the claim?
No. The damage was caused by storm, which is an insured event under the policy. The insurer has not shown it is entitled to rely on a policy exclusion to deny the claim.
The policy provides cover for storm damage, subject to exclusions
It is established insurance law that an insured must first establish, on the balance of probabilities (that is more likely than not), that the loss or damage claimed falls within the terms of the policy. If that is done, the burden then shifts to the insurer to establish, again on the balance of probabilities, the application of any exclusion in the policy should they want to deny the claim.
The policy provides cover for damage done in certain listed events. Those events include ‘Storm.’ Storm is described at page 20 of the Product Disclosure Statement (PDS) to include ‘cyclone, hail, wind, snow or rain.’
The policy also includes several general exclusions applicable to all cover provided by the policy. These include exclusions for damage caused by or arising from:
defects in design, structure, materials, workmanship or construction; and
earth or soil movement (other than earthquake) including landslide, subsidence, erosion or heave.
Insurer says the damage is not covered by the policy
The insurer says the complainant has not established the damage claimed was caused by a storm. Rather the damage was proximately caused by earth and soil movement and the absence of a dowel joint between the footings of the home and the footings of a more recently built extension to the home. The insurer says that the damage has occurred over time, due to seasonal variations in soil moisture, rather than arising from a single insured event.
In disputes over causation, the question is, what was the proximate cause?
The central issue in dispute between the parties is about what caused the damage to the home. The complainant argues that the cause is the storm which lead to soil movement resulting in the foundations shifting and subsequent cracking. The insurer says it is soil movement over time and the absence of the dowel joint.
There can be several contributing factors leading to an event occurring. In disputes of this nature, insurance law requires that the proximate cause for the loss or damage be determined.
The proximate cause of a loss or damage is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause.
The insurer’s initial denials of claim are based on reports from consultants
The insurer had a builder, MK, attend to inspect the property on 21 November 2021. It found significant damage to the property. MK reported that:
the damage observed not being consistent with storm or rain ingress, rather due to movement, atmospheric moisture, and poor workmanship; and
the damage is gradual in nature and not the result of a single or insurable event.
In December 2021, the insurer declined the claim for those reasons. Subsequently the complainant, unhappy with the outcome asked that the claim be reopened. The insurer eventually engaged an engineer AJ to provide a further assessment as to the damage and its cause. AJ inspected the property on 16 February 2023 and concluded:
the experienced movement and cracking in the insured property resulted from lack of dowel joint, long term subterranean water entry, movement and subsidence of the wall has caused movement of the roof framework and subsequent cracking;
damage not caused by a storm event in February 2022; and
damage not caused by a single event and likely ongoing for a long and extended period of time.
However, these conclusions were based on a mistaken belief that the storm occurred in February 2022 and relying on rainfall data for February 2022. The exchanged information shows the claim was lodged for weather events experienced in or around March 2021, when the rainfall was much higher.
Insurer’s engineer now says storm triggered movement in the house footing
AJ amended its original causation report following the receipt of further information from the complainant including clarification that the storm was in 2021. Its updated view was contained in a report dated 15 May 2024 which said:
previous assessment was based on Bureau of Meteorology (BOM) records indicating 42.4 mm in rainfall which was significantly less than the March 2021 events which accumulated a total of 286.8 mm of rain from 19 -22 March 2021;
based on BOM data this would have likely caused a small flood as per the insured’s claim and triggered subsidence to the soil material and caused settlement in the footings as experienced; and
given extent of cracking in the ceiling, the foundation settlement has also likely caused movement and issues within the roof framework.
AJ maintained its position that there was no evidence that the dowel joint had been adequately installed and certified, but then stated:
However, irrespective of this and based on the volume of water experienced on the date of loss occasioning the area on 19 – 22 March 2021 totalling 286.8 mm, this has likely triggered movement in the footing and movement to the roof framework.
The experienced movement in the foundation was likely triggered by the storm event in March 2021
Complainant’s engineer concludes storm is the cause
The complainant had an engineer, AC, attend and report on the damage and its cause. AC’s report, dated 8 April 2024, concludes that:
we can advise that the storm event on February/March 2021 is considered to be the fundamental cause of the damage sustained to the property and that damage is not due to any pre-existing defects and had not been ongoing for an extended period of time, otherwise property would have been in a much worse condition.
AC also said in their report that based on documents the complainant had obtained from the council they were satisfied that a dowel joint had been installed and that the building was compliant.
Proximate cause of the damage to the home was storm
Based on the engineer reports from both parties, I conclude that the proximate cause of the damage to the complainant’s home was storm. AC’s conclusion is strongly worded and speaks of storm being the “fundamental cause”. AJ who previously said the damage had occurred gradually over time, no longer takes that position and says the movement in the footings and the frame of the house was likely caused by the storm.
Both consultants identify the very heavy rain on 19-21 March 2021 as causal and site the BOM records of rain levels on those days. This was not normal seasonally driven earth movement but the impact of a very large volume of water from a storm flooding the foundations. The dominant and effective cause was the storm.
The insurer has questioned whether the damage resulted from the storm because AJ said that you would expect the damage to be visible within 48 hours. The earliest material showing damage is photos taken of ceiling cracks on 20 April 2021. This is some weeks after the storm. However, the damage was initially modest and has got worse over time, as shown by subsequent photos.
The complainant may have not noticed or focussed on the initial damage for a period, until it did get worse. They did not lodge their claim until some months later on 29 October 2021. Given the strength of the engineers’ conclusions on likely causation, I remain satisfied that the storm caused the damage.
This means that the complainant has established a claim within the terms of the policy.
Exclusions not established
The insurer has not established that either of the two exclusions apply. The proximate cause being storm, means that the exclusion for damage caused by earth movement does not apply. Whilst there is still some debate between the engineers about whether a dowel joint was in place, both conclude that the damage was caused by storm.
AJ says this is “notwithstanding” their view on the dowel joint. Even in their initial report, the strongest AJ put this point was that the damage that occurred was consistent with no dowel joint being in place. They acknowledged they could not observe whether it was or not because it would be under concrete.
Discrepancies in dates in initial claim not decisive
The insurer has sought to argue that the claim is put in doubt by the fact that the complainant, when lodging the claim on 2 November 2021 gave the date of the loss as 29 October 2021. The insurer says a similar account was givent to MK when it attended to inspect the property. There could be many reasons for this as it is clear that the damage got worse over time.
It may be that in claiming the complainant was focused on damage they had most recently become aware of or that triggered their decision to lodge the claim, or otherwise misunderstood the question being put. The complainant has provided photos of the ceiling cracks visible in April 2021. The engineers have been satisfied that the damage was caused by the storm and the impact it had on the footings and roof frame.
The insurer has also raised concerns that the complainant had just referred to storms in February/March rather than providing a specific date. The long period after the event and gradually increasing damage before the claim was lodged provide an explanation for this. Both engineers identified the intense rain between 19 and 21 March 2021 as the causal event.
Is non-financial loss compensation payable?
Yes. The insurer’s handling of the claim has involved avoidable delay and caused the complainant undue stress. The insurer should pay the complainant the sum of $2,000 in non-financial loss compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
However, AFCA adopts a conservative approach to the award of compensation for non-financial loss. AFCA expects complainants’ to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim.
Insurer’s handling of claim has caused unnecessary delay
In this matter, compensation for non-financial loss is warranted because the insurer’s handling has led to significant delays in getting the property rectified. The key report it relied upon from AJ, was based on the event occurring in the wrong year, 2022 rather than 2021. That was apparent on the face of the report and the insurer should have realised. When AJ subsequently reported based on the correct event date, its conclusions were effectively reversed.
Whilst this delay has continued, the complainant has been living in a house with very worrying cracking and movement damage. This caused undue stress and inconvenience to the complainant and the absence of repairs has interfered with the complainant’s expectation of enjoyment and peace of mind with regards to the property.
For these reasons and on receiving notice of the complainant’s acceptance of this determination, I am satisfied it is fair that the insurer be required to pay the complainant $2,000 in non-financial loss compensation.
Why is the outcome fair?
The complainant has shown the damage claimed was caused by a storm, being an insured event under the policy. The insurer has not shown the claimed damage is excluded under the policy terms. It is therefore fair that it covers the claim. It is also fair that the complainant be compensated for the undue stress the handling of the claim has caused.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.