Summary

The owner of an investment unit claimed water damage to the ceiling and walls below a balcony. AFCA found the insurer was entitled to rely on exclusions for faulty workmanship, lack of maintenance and gradual deterioration, and made no order.

The proximate cause of the damage was excluded faulty construction and long-term deterioration rather than a sudden and accidental insured event.

Issues

Subjects and remedies

home or building damageno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1022331 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-00-1022331 28 November 2024 Determination overview Complaint The complainant has the benefit of a residential strata insurance plan for her investment unit in the northern suburbs of Adelaide, South Australia (the unit). In June 2023, she lodged a claim for water damage to the unit. The insurer investigated the circumstances of the damage and loss. It then declined the claim. It says the damage is due to a lack of maintenance, wear and tear and gradual deterioration over time, together with faulty or defective workmanship, design or specification. Damage produced by these causes is excluded from cover under the terms and conditions of the policy. The complainant disagrees. She says she regularly maintained the unit and the damage was caused by an insured event. She says the insurer should therefore accept her claim. Issues and key findings Is the insurer entitled to deny the claim? Yes. The exchanged material shows the proximate cause of the damage was a combination of faulty or defective workmanship, design or specification and a lack of maintenance, together with wear and tear and gradual deterioration over a significant period of time. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim. Why is the outcome fair? The outcome is fair in all the circumstances because the damage was not caused by an insured loss event that is not otherwise excluded under the terms and conditions of the policy. Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this complaint. Reasons for determination Is the insurer entitled to deny the claim? Yes. The exchanged material shows the proximate cause of the damage was a combination of faulty or defective workmanship, design or specification and a lack of maintenance, together with wear and tear and gradual deterioration over a significant period of time. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim. Complainant says damage caused by an insured loss event The unit is a three-stories tall property in a complex of apartments, built in or about 2014. It was constructed in timber frame, over a reinforced concrete slab. The external walls are lined by ‘Hebel power panel’ and sheet cladding and rendered masonry. The internal ceiling and walls are lined in plasterboard. The roof is of a skillion construction covered in corrugated iron. The unit comprises two bedrooms and a living area with an upper balcony on the third floor (the balcony). The complainant lodged a claim for water damage to the unit on 19 June 2023. The date of loss was deemed to be 23 May 2022, however several reports obtained by the parties refer to stormwater entry to the building on 9 March 2023. In any event, the complainant says the cause of the water damage was a leak through the ceiling as a result of heavy rainfall. She says the insurer should cover the costs incurred to have the unit repaired. I note the balcony is situated directly above the claimed ceiling damage. Complainant has onus to establish a valid claim It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim. If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. The terms and conditions of the insurance plan and the policies within the plan are set out in the policy documents, including the Product Disclosure Statement (PDS), the Certificate of Currency and the Renewal Certificate. The parties agree the complainant has been provided with the policy documents. It follows the insurer is entitled to rely upon the contents of the documents. Plan covers damage caused by loss events, subject to exclusions and limitations The insurance plan was incepted on 4 December 2019. The relevant period of insurance is 4 December 2021 to 4 December 2022. The plan provides cover for, amongst other eventualities, damage to the building under Policy 1. Page 16 of the PDS states: Policy 1 - Insured Property What We insure If selected and shown in the Schedule, We will insure You up to the Sum Insured shown for Policy 1 in the Schedule against Damage to Your Insured Property which occurs during the Period of Insurance. Page 9 of the PDS includes the following definition of ‘damage’ and ‘damaged’: Damage, Damaged means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy Thus, to establish a valid claim in this matter, the complainant must demonstrate, on balance, the partial or total accidental physical loss of, or destruction of, the building from any sudden and accidental cause that is not otherwise excluded by the policy. The ‘sudden and accidental’ element of the definition means that damage caused by a process that occurs over time (such as gradual deterioration or wear and tear) is excluded from cover. Complainant has established a valid claim I am satisfied the complainant has established a valid claim for the damage to the unit. This is because of the following factors. First, there is no dispute there were severe periods of rainfall during the period of insurance. Second, the complainant says the unit was in good condition, and well maintained, prior to the loss event. Moreover, the insurer has provided no evidence to impugn or undermine the complainant’s credit. Finally, the policy definition of ‘damage’ is wide and expansive, and should be interpreted in a manner that accounts for damage of the type which is the subject of this claim. As mentioned, the onus now shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. Insurer relies upon various policy exclusions and limitations to deny the claim The cover provided pursuant to Policy 1 is subject to the general policy conditions and exclusions set out at pages 14 and 15 of the PDS. The conditions include the following: Claims Conditions 1. What You must do As soon as You discover that an Event likely to result in a claim has occurred, You must: a. take all reasonable steps to reduce the damage and to prevent any further damage; […]. The cover provided pursuant to Policy 1 is also subject to specific exclusions set out on pages 19 and 20 of the PDS. The specific policy exclusions relied upon by the insurer to deny the claim include: Exclusions We will not pay for Damage caused by or arising directly or indirectly from: […] b. lack of maintenance, rust, oxidation, corrosion, mould, wear and tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain Your Insured Property in a reasonably good state of repair. This includes when the damage to the Insured Property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time […] 3. We will not pay for: […] b. Damage caused by non-rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of; c. the cost of rectifying faulty or defective materials or faulty or defective workmanship, design or specification; […] (emphasis added). Experts inspected the unit AB, building consultants, inspected the unit (as well as five others in the building) on 6 October 2022. AB’s report written pursuant to that inspection is dated 28 October 2022. In regard to the unit, AB observed and noted, amongst other things: the balcony does not display moisture entry into the unit, however, some building movement and damage to the junction between the upper floor external column wall and the Hardie Plank junction has clear moisture damage the wall between the complainant’s unit and the one next door has had a new capping installed to the top of the wall, as a leak has previously been identified in this location. The flashing has not been installed in a proper manner or properly terminated in a tradesman-like finish. The repairs have not been sealed on the complainant’s side. The repairs were only completed on the other unit’s side. On the complainant’s side, the flashing has not been turned up at the back to provide the required capillary break. Moreover, the Hebel does not have the manufacturer’s starter strip installed to the bottom of the panel. In addition, there is no adequate sealant joint to prevent moisture from gaining entry to the underside of the cladding and running into the wall. KH, builder, attended the unit to repair a roof leak in March 2023. Relevantly, KH noted the following: a roof leak is occurring in master bedroom on the second storey. The unit has a balcony above the bedroom a leak is occurring through the cornice on the right side of the wall the side wall of the balcony has a large crack through a join in the cement sheeting paint was peeling from the cement sheeting on the balcony, indicating water damage to the cement sheeting small cracks were observed within the grout on the base of the balcony. BW, plumbers, then inspected the unit in June 2023. A tax invoice provided by the complainant indicates BW observed the following defects, before completing make-safe works: attended the unit for water leaking through the ceiling and down the walls of the bedroom under the balcony. Advised that a quote had previously been sent by another plumbing company, but was instructed by building management to attend and see if we could do a temporary solution found balcony above the bedroom to have defective grout and silicone work balcony waterproofing is either failed or non-existent. ML, loss adjuster, then provided a report dated 30 June 2023. The purpose of this report was to summarise the history of the unit and the building. This history is also set out below. Relevantly, ML’s report includes the following: there have been defective roof flashings identified within the unit dating back to 2017. The balcony waterproofing problems were identified in September 2022. However, there appears to have been little action taken to rectify this AB have (again) been asked to complete an inspection of the roof and balcony, specifically to the unit, to fully establish the cause of the damage. AB again inspected the unit on 3 July 2023. It observed and noted, amongst other things: it had again suffered recent water damage to the ceiling and walls of the bedroom below the balcony all units at the building were constructed in the same manner and design. The moisture ingress to all units is identified in the same location as that observed in the complainant’s unit, just outside the ensuite door and robe opening there are also water marks on the ceiling to the northern end of the bedroom that sits under the balcony sliding door water is not entering the building through the roof flashings which are compliant the junction between the top of the wall and the upper cladding on the finished opening to the alfresco balcony does not have a drainage slope installed. The bulkhead cladding is set back 15mm, causing a flat surface for water to pond this wall is composed of lightweight cement sheeting that is rendered water sitting on top of the ledge would be able to penetrate internally off the wall this does not meet performance requirements the balcony in the unit has been constructed in the same manner as the one next to it and the moisture ingress in the unit is caused by the same process testing of the waterproof membrane previously demonstrates it has not been properly installed in accordance with the building design. Reports of damage from 2017 onwards The insurer also submits the damage to the unit has been an ongoing issue for several years. For instance, in March 2017, KH inspected the unit after water damage was reported in the unit’s garage and internally. KH concluded the roof looked to be in good condition. However, because the owners of several units in the complex had reported similar damage, KH was of the opinion the roof may not be able to cope with a very large volume of water during severe downpours. Subsequently, in response to an email enquiry in April 2017 from the complainant about balcony damage during heavy storms, TX, sales manager for the complex, advised: The [garage damage]… was due to an extreme amount of water that could not exit the roof fast enough, and hence back-flowed over the roof flashing into the ceiling space… the other units in this development have not had this issue. In a separate email sent in April 2017, TX advised: It is evident that water has blown up and under the roof flashings ion the top floor. This is possible in an extreme storm with heavy wind and rain… additionally, the rear garage would have had too much water to cope with this storm. AB first inspected the unit on 15 December 2017 after reports the roof was leaking because of problems associated with the installation of the external air-conditioning unit. Under the heading, ‘History’, in its report dated 20 February 2018, AB states: The home is experiencing constant leaking through the roof, and it is related to the air conditioning penetrations through the roof and the flashing installed. On 28 April 2019 the complainant emailed photographs to TX which clearly depicted significant cracking damage and wall-surface delamination on the balcony of the unit. TX emailed the complainant on 29 November 2019 and advised: I have received confirmation back from our construction manager… The settlement crack that is running between the two different materials should be repaired as soon as possible… This is a very obvious area of water/moisture ingress into the wall and may have been occurring for some time unattended… The section where the flushing joint has swelled and had the paint fall away needs to be repaired. This is just general maintenance. Subsequently, an email from TX to the complainant dated 6 December 2019 includes the following: The gyprock sheet where there has been moisture get in [sic] from the bottom – this requires repair, but has occurred from moisture being applied and tracking up the sheet, which could have occurred from excessive wetting of the area, or if there was a chip, crack or scuff in this area which has allowed moisture to enter over time and slowly get larger… The house is now five and a half years old – the builder’s warranty has now concluded. The complainant provided an invoice from PP, painters and maintenance workers, who repaired the damaged northern balcony boundary wall at the unit. The invoice is dated 12 February 2020. Insurer says damage not covered under the plan The insurer says the policy does not respond to the claimed loss and damage. It says the cause of the damage is consistent with inherent and latent defects and a lack of maintenance. Further, the insurer says the policy does not respond to rectifying faulty or defective materials or defective workmanship. Finally, the insurer says the damage has been caused by defects in the balcony which predate the inception of the insurance plan. Proximate cause of damage needs to be assessed Damage can have more than one cause. For instance, in this matter the complainant says the damage was caused by sudden and accidental factors not otherwise excluded by the policy. In contrast, the insurer says the damage was caused by a combination of factors, including faulty or defective workmanship, design or specification, along with gradual deterioration, wear and tear, and a lack on maintenance, all of which are excluded under the terms and conditions of the policy. In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. Insurer is entitled to deny the claim I am satisfied the insurer is entitled to rely upon various policy exclusions to deny the claim. This is because of the following considerations. First, the evidence of AB, KH and TX shows, on balance, the balcony has been defective for a significant period, most likely since about 2019. Second, whilst the complainant attempted to maintain the unit (see, for example, the invoice of PP dated 12 February 2020), the defects and associated problems with the balcony were not successfully remedied. Indeed, the evidence of KH and BW show that the balcony was still defective in 2023. Third, AB’s evidence shows elements of the balcony, especially its waterproofing, were not constructed adequately or in accordance with Australian Standards. This indicates faulty or defective workmanship, design or specification. Finally, whilst the complainant provided copies of claim acceptance letters for neighbouring units in the same building, I have not had regard to that evidence. This is because each matter must be considered on a case-by-case basis, according to the merits and history applicable to that matter only. In summary, I am not satisfied the proximate cause of the damage was an insured event that is not otherwise excluded under the terms and conditions of the policy. In fact, I am of the opinion the proximate cause of the damage was a combination of faulty or defective workmanship, design or specification and a lack of maintenance, together with wear and tear and gradual deterioration over a significant period of time. Moreover, I am satisfied the exchanged material shows, on balance, a not insignificant portion of the damage occurred prior to the inception of the insurance plan. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim. Why is the outcome fair? Policy exclusions apply The outcome is fair in all the circumstances because the proximate cause of the damage was a variety of factors that are all excluded from cover under the terms and conditions of the policy. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.