Claim for new water damage from September 2023 declined as caused by delayed roof replacement
Text of the determination
Determination
|
Case number
|
12-00-1021916
|
Financial firm
|
Insurance Australia Limited
Case number: 12-00-1021916 11 October 2024
Determination overview
Complaint
The complainant holds a home and contents insurance policy with the financial firm (the insurer). In February 2022, she lodged a claim saying her roof had been damaged by storms, and water had entered the home through the roof. The insurer partially accepted the claim, but said it would not pay for damage to the roof. The complainant disputed this decision. In April 2023, the insurer agreed to pay for a full roof replacement.
In April 2023, the insurer paid the complainant $61,471 for building damage. The complainant said costs had increased because of the delay in settling the claim. In June 2023, the insurer paid another $37,938 for building damage. This brought the total payments for building damage to $99,409, including $54,206 for a full roof replacement.
In September 2023, more water entered the home through the roof, causing new damage. The complainant said the new damage should be covered under the existing claim. The insurer offered $39,000 in full and final settlement of the claim ($37,000 for the new damage, $2,000 for non-financial loss). The complainant says this is inadequate. She is claiming at least $177,528.60 for the new damage.
Issues and key findings
Is the insurer liable for the new damage?
No. The insurer paid the complainant enough for a full roof replacement in April 2023, but the complainant did not replace the roof until October 2023. The new damage occurred because the complainant delayed the roof replacement.
Is the insurer required to increase its offer?
No. The insurer is not required to increase its offer, because:
its offer, combined with its previous payments, is enough to cover all storm-related damage to September 2023
it is not liable for water damage that occurred in or after September 2023.
Why is the outcome fair?
The claim gave rise to several disputes and delays. However, the insurer did not cause any delays in repairing the home after April 2023. It would not be fair to require the insurer to pay for damage caused by delays in September 2023.
Determination
This determination is in favour of the insurer.
Within 14 days of being informed of the complainant’s acceptance of this determination, the insurer must pay the complainant $39,000 in full and final settlement of the claim, and any other claims relating to water damage to the home from 2022 to now.
Reasons for determination
Is the insurer liable for the new damage?
No. The insurer paid the complainant enough for a full roof replacement in April 2023, but the complainant did not replace the roof until October 2023. The new damage occurred because the complainant delayed the roof replacement.
Insurer paid complainant’s quotes to June 2023
On 22 February 2022, the complainant lodged a claim for storm damage to her home. She said her roof had been damaged by two storms in early 2022, and her home and contents had been damaged by water entering through the roof. The insurer partially accepted the claim, but said it would not pay for damage to the roof.
On 23 March 2023, the complainant lodged an AFCA complaint (964587) about the insurer’s handling of the claim. The insurer agreed to pay for damage to the roof. On 17 April 2023, the insurer paid the complainant $61,471 for building damage, including roof damage.
On 5 June 2023, the complainant lodged another AFCA complaint (987643) saying the settlement sum was not enough to repair the damage. She said costs had increased because of the delay in settling the claim, and provided updated repair quotes. The insurer questioned some of the quotes, but agreed to pay them in full ‘in an effort to resolve the matter amicably’. On 20 June 2023 and 30 June 2023, the insurer paid the complainant an additional $37,938 for building damage. This brought the total payments for building damage to $99,409.
The payments for building damage were based on the complainant’s updated repair quotes, which included the following work:
$29,550 for front entry, hallway, and laundry repairs, including:
> new flooring in the front entry and hallway
> electrical work in the laundry, living room, and office
> repair of walls and ceiling, and replacement of mouldy timbers, in the laundry
$15,653 for plastering and painting, including:
> replacement of ceiling in the upstairs lounge and downstairs laundry
> replacement of skirtings and architraves
> replacement of eave lining (including $2,200 for one week’s scaffold hire)
$43,371 for a full roof replacement (excluding ‘Fascia and Gutter / Carpentry’)
$10,835 for roof carpentry, including new fascia and gutter.
Complainant reported new damage in September 2023
On 2 August 2023, the complainant told the insurer repairs would be carried out between 27 August 2023 and 10 September 2023.
On 11 September 2023, the complainant told the insurer more damage had been caused by water entering her home on 10 September 2023. The repairs scheduled to be completed by 10 September 2023 had not occurred. The complainant said the builders she appointed were unable to do the work.
The insurer said the complainant should lodge a new claim for the new damage. The complainant said she did not want to lodge a new claim. She said the damage was related to the storms in 2022, so she wanted the damage covered under the previous claim.
On 26 September 2023, the complainant lodged this AFCA complaint (1021916).
Insurer offered $37,000 for new building damage
The insurer said it wanted to inspect the home for new damage.
The insurer appointed an engineer, who inspected the home on 10 January 2024. The engineer said:
the home had ‘original damage’ (which the insurer had paid for) and ‘new damage’
the new damage would not have occurred if the roof had been maintained
the complainant said the tile roof had been replaced with a metal roof in September 2023 or October 2023, and the new roof had not leaked.
The engineer prepared a scope of works for the repair of the new damage. The insurer’s builder provided a repair quote based on the engineer’s scope of works. The quote was dated 9 February 2024 and totalled $30,752.76.
The insurer offered to pay $39,000 ‘in full and final settlement of your claim and dispute’. This amount included $37,000 for building damage (the builder’s quote, plus 20% ‘loading’, plus rounding) and $2,000 for non-financial loss (stress and inconvenience).
Insurer not liable for new building damage
The policy says:
Rebuilding or repairing your buildings must commence within six months of the loss or damage occurring, otherwise we will not pay any additional costs caused by any delay caused by you or any builder or supplier you engage or appoint for the repair or rebuilding work.
The complainant’s home was damaged in February 2022. Repairs did not commence within six months. As a result, new damage was caused by water entering through the roof in September 2023.
The complainant said the new damage was caused by the insurer’s delay in settling the claim. She said she could not start repairs until the insurer paid for them.
The insurer paid the complainant $61,471 for building damage on 17 April 2023. This was not as much as the insurer ultimately agreed to pay. However, it was more than enough to pay for a full roof replacement. The complainant could have arranged the roof replacement immediately after 17 April 2023. If she had done this, the new roof would have been in place before the additional water entered the property on 10 September 2023.
The new damage occurred because of a delay caused by the complainant or her builders. Therefore, the insurer is not liable for the new damage.
Is the insurer required to increase its offer?
No. The insurer is not required to increase its offer, because:
its offer, combined with its previous payments, is enough to cover all storm-related damage to September 2023
it is not liable for water damage that occurred in or after September 2023.
Insurer’s payments and offer covers all damage to September 2023
By 30 June 2023, the insurer paid the complainant $99,409 for building damage. The complainant accepted the payments in June 2023, but did not say she accepted them in full and final settlement of her claim.
In an email on 29 June 2023, the complainant said removing the roof might reveal further damage to the ceilings and electrical items in the ceilings. She did not say there was any other building damage not covered by the insurer’s payments.
The insurer’s payments were based on the complainant’s quotes, which included:
electrical work in the laundry, living room, and office
replacement of ceilings in the upstairs lounge and downstairs laundry.
The insurer’s settlement offer is based on its builder’s quote, which includes:
electrical work (installation of downlights) in the bathroom and kitchen/dining room
replacement of ceilings in the living room and study, and painting of ceilings in the master bedroom and kitchen/dining room.
The complainant has not shown the ceilings, or electrical items in the ceilings, have any damage not covered by the insurer’s payments and the insurer’s new settlement offer.
The insurer’s payments to 30 June 2023 covered all the quotes the complainant had provided to that point. There may have been some hidden storm-related damage that had not yet been discovered, and was not included in the complainant’s quotes. However, the complainant has not provided information showing this is the case. If there was any hidden damage, the insurer’s offer to pay an additional $37,000 for building damage is likely sufficient to pay for it.
The panel is satisfied the insurer’s settlement offer, combined with its previous payments, is enough to cover all storm-related damage to September 2023.
Complainant has not established entitlement to additional amounts
The complainant has claimed the following amounts:
$131,750 for building works
$4,628 for replacing downlights
$6,600 for house cleaning
$7,670 for curtain and blind replacement
$3,300 for scaffolding
an unspecified amount for utility bills
$12,700 for contents
$10,880.60 for carpet replacement and cleaning.
These amounts total $177,528.60, excluding the utility bills.
For the following reasons, the panel is not satisfied the complainant is entitled to recover any of these amounts from the insurer.
Insurer not required to pay complainant’s builder’s quote
The complainant has provided a builder’s repair quote dated 8 February 2024 totalling $131,750.
The quote includes items the insurer has already paid for, including:
electrical work, including replacement of all downlights in the home (the insurer has paid for electrical work in the laundry, living room, and office)
replacement of ceiling in unspecified location (the insurer has paid for the replacement of ceiling in the upstairs lounge and downstairs laundry)
new flooring in unspecified location (the insurer has paid for new flooring in the front entry and hallway; the complainant says the quote also includes new flooring in the living room)
removal of roof tiles and battens
replacement of eaves.
The quote is not detailed enough to show how much of the cost relates to items the insurer has already paid for.
The quote includes work the insurer has not already paid for. However, the panel is not satisfied that any of this work is required to repair storm-related damage that occurred before September 2023.
Insurer not required to pay more for downlights
The complainant claims $4,628 for replacing downlights. Her builder’s quote of 8 February 2024 also included the replacement of all downlights in the home.
The insurer’s builder’s quote includes $4,412.27 ($3,315 plus 21% margin and 10% GST) for replacing downlights in the bathroom and kitchen/dining room. The complainant has not provided information showing downlights were damaged in other rooms.
Insurer not required to pay more for cleaning
The complainant claims $6,600 for house cleaning. She has provided a quote for $6,200 for house cleaning. The quote included cleaning water marks and stains from every wall in the house.
The insurer has paid to repair walls in the laundry, and has offered to pay to repair walls in the master bedroom and kitchen/dining room. The insurer’s engineer recorded water damage to walls in these rooms, but no others.
The insurer’s builder’s quote includes $1,304.38 ($980 plus 21% margin and 10% GST) to ‘remove all rubbish… and leave clean and tidy’.
Insurer not required to pay for curtain and blind replacement
The complainant claims $7,670 for curtain and blind replacement.
The complainant says the insurer’s engineer commented on damage to roller blinds. However, this is not mentioned in the engineer’s report.
The complainant’s builder’s quote of 8 February 2024 included an allowance of $8,100 for new roller blinds. However, this was not included in an earlier version of the quote dated 20 October 2023.
The panel is not satisfied the curtains or blinds were damaged before September 2023.
Insurer not required to pay more for scaffolding
The complainant claims $3,300 for scaffolding.
The complainant says she obtained a verbal quote for $3,300 for scaffolding, but was unable to obtain a written quote.
The insurer has already paid the complainant’s quote for plastering and painting, which included $2,200 for one week’s scaffold hire. The complainant has not provided information showing she will need to pay more than this for scaffolding.
Insurer not required to contribute to utility bills
The complainant says her water and electricity bills increased while her home was being repaired.
It is not clear when repairs to the complainant’s home took place. However, they appear to have started in October 2023 (when the roof was replaced).
The complainant’s water bills show her water use in the last quarter of 2023 was lower than in the last quarter of 2022.
The complainant’s electricity bills show her electricity use from 25 July 2023 to 23 October 2023 was lower than during the same time the previous year. The complainant has not provided bills showing her electricity use after 23 October 2023.
The complainant has not shown her utility bills increased because of the repairs. The insurer is not required to contribute to the complainant’s utility bills.
Insurer not required to pay more for contents
In 2022, the insurer paid the complainant $16,842.52 for damage to contents.
The complainant says more of her contents were damaged by water entering the home in September 2023. These contents included a guitar, PlayStation, and clothing. She is claiming $12,700 for these items.
The water entering the home in September 2023 was due to the complainant’s delay in replacing the roof. The insurer is not required to pay for damage to the contents.
Insurer not required to pay for carpet replacement and cleaning
The complainant claims $880 for carpet cleaning and $10,000.60 for carpet replacement.
The complainant reported water damage to carpets in 2022. The insurer’s payments for contents damage in 2022 included $9,086.52 for damage to carpets.
The complainant reported new water damage to carpets in September 2023. The insurer is not liable for the water damage that occurred in September 2023.
Insurer not required to pay more for non-financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim.
The insurer initially refused to pay for repairs to the roof. This delayed the resolution of the claim.
On 19 April 2024, the insurer said its builder’s quote was actionable (meaning the complainant could have the builder perform the quoted work for the quoted price). On 8 May 2024, the insurer said its builder would need to inspect the home before deciding if they could perform the quoted work. This error had little effect on the complaint, as she was not willing to allow the insurer’s builder to perform the work.
The insurer has paid the complainant $1,000 for non-financial loss. It has offered to pay an additional $2,000 for non-financial loss.
The insurer has offered to pay $37,000 for the new building damage, which it is not liable for. The insurer may have been liable for hidden damage that was not included in the quotes the complainant provided to June 2023. However, the existence of such damage is unproven, and it is unlikely to be worth more than $37,000.
The insurer has offered to pay $37,000 for the new building damage and $3,000 for non-financial loss. The policy does not require the insurer to offer these amounts. The panel considers this sufficient to compensate the complainant for any stress or inconvenience caused by the insurer’s errors.
The insurer is not required to pay more for non-financial loss.
Why is the outcome fair?
The claim gave rise to several disputes and delays. However, the insurer did not cause any delays in repairing the home after April 2023. It would not be fair to require the insurer to pay for damage caused by delays in September 2023.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with extensive experience in consumer and small business advocacy
a member with extensive experience in insurance.