Home / IAG / Determination 12-00-1019950
Determination 12-00-1019950
Storm damage building claim settlement and mould remediation
Summary
The complainant's storm-damaged home claim stalled over mould remediation and repair scope, and she sought $831,355.70. AFCA ordered payment of the $350,000 building sum insured, outstanding temporary accommodation for up to six months, and $5,400 for non-financial loss.
The insurer's claim mismanagement meant its remediation costs should not be deducted from the sum insured, and extending liability beyond the policy terms was fair.
Issues
- Claim amount dispute primary · upheld“It is fair the insurer pays the complainant the sum insured of $350,000 in settlement of the building claim. The insurer's offer of the remaining sum insured is unfair.”
- Poor claim handling secondary · upheld“The insurer's claims handling has caused considerable delay in the completion of the remediation and repairs... conduct was not reasonable or consistent with utmost good faith.”
- Inadequate claim investigation secondary · upheld“The insurer failed to thoroughly investigate the cause of the damage and then sought to avoid the agreed remediation expert.”
- Delay secondary · upheld“The need for ongoing temporary accommodation is due to the delays and poor case management of the insurer.”
Subjects and remedies
health or medicalhome or building damagenatural disasterpay claimpay compensationpay non financial loss
Related
Text of the determination
Determination
|
Case number
|
1019950
|
Financial firm
|
Insurance Australia Limited
Case number: 1019950 27 June 2024
Determination overview
Complaint
The complainant holds a home building and contents insurance policy with the financial firm (insurer) and lodged a claim for damage to her home following a storm on 4 March 2022.
The insurer accepted the claim for the storm related damages including mould remediation and temporary accommodation. Issues arose as to the mould remediation and resultant damage.
The insurer has paid $120,702.48 for repairs and mould remediation plus temporary accommodation costs of $70,000. It has offered to pay the complainant $229,279.48 being the balance of the sum insured of $350,000 in settlement of the claim.
The complainant says the insurer negligent claim handling has resulted in the extensive damage to her home and now seeks $831,355.70 to cover ongoing temporary accommodation, mould remediation and building repairs.
Issues and key findings
Is the insurer’s liability to settle the building claim limited to the sum insured?
No. The cost of remediation works were largely due to the mismanagement of the claim. This should not be deducted from any settlement. It is fair the insurer pays the complainant the sum insured of $350,000 in settlement of the building claim.
Is the complainant entitled to ongoing temporary accommodation?
Yes. It is fair the insurer pays the outstanding temporary accommodation costs and for up to six months after the date of this determination as set out in section 2.2.
Is the insurer liable to pay compensation for non-financial loss?
Yes. The complainant has suffered an unusual amount of stress and inconvenience throughout the life of the claim. The insurer is to pay the complainant $5,400 in compensation.
Determination
This determination is in favour of the complainant. Within 14 days of receiving notice of the complainant accepting the determination the insurer is to pay the complainant:
$350,000 in settlement of the building claim plus temporary accommodation expenses outstanding at the date of this determination
$5,400 compensation for non-financial loss
The insurer is to otherwise settle the complainant’s ongoing temporary accommodation costs for a period of up to six months as set out in section 2.2 of this determination
Reasons for determination
Is the insurer’s liability to settle the building claim liability limited to the sum insured
No. The cost of remediation works were largely due to the mismanagement of the claim. This should not be deducted from any settlement. It is fair the insurer pays the complainant the sum insured of $350,000 in settlement of the building claim.
Complainants must establish claimable loss
A party making an insurance claim must establish they suffered a loss that is covered under the insurance policy. They must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer must accept the claim, unless it can establish the application of a relevant exclusion. The insurer must establish the exclusion on the balance of probabilities.
Circumstances of claim
The complainant held a home and contents insurance policy covering the complainants building for a sum insured of $350,000 and contents for $30,000. The policy is a listed events policy providing cover for a series of listed events including storm, subject to various conditions and exclusions.
On 4 March 2022, the complainant notified the insurer that a storm earlier that day had damaged her home with water ingress into her master bedroom. The complainant had a repairer fix the roof leak and denies the insurers allegation that there was mould in the bedroom and major parts of the home.
The insurer says it appointed CRS to attend the property, but CRS could not contact the complainant. The complainant denies knowledge of any attempt by CRS to contact her.
It was not until July 2022 that the complainant says she discovered visible mould in every room in the house. The complainant had her broker request the claim be reopened.
The insurer appointed ABC to inspect the extent and cause of damage. ABC attended the property on 19 August 2022. The insurer says ABC determined the damage was a structural defect to the ventilation pipe on the roof sheets, causing water ingress into the kitchen wall cavity and atmospheric mould through the home. The panel notes the report from ABC does not record the damage being caused by a structural defect but records the damage was not caused by a listed event and was consistent with atmospheric mould. The report does not appear to acknowledge the repairs completed by the complainant or the initial claim details.
RG a restoration company reported to ABC following attending the property on 20 August 2022 that there was mould in the carpets and underlay of the master bedroom with the carpet and underlay removed and antimicrobial treatment provided. RG noted the complainant had health concerns and recommended a clean of all contents and rooms throughout the property.
Dispute arose as to the extent of the event related damage. The panel does not propose reciting all the issues leading to the dispute. The panel notes that despite comments by ABC and RG, the insurer eventually agreed to the complainant’s preferred remediation company MP complete the necessary mould remediation. As part of the remediation process MP requested that the entire wall framing to be replaced, which was agreed to by the insurer. However, during the remediation the insurer appointed hygienist, RIC, to offer an opinion on the work required.
RIC considered the mould was atmospheric and considered over drying by MP was causing damage to the property. RIC reported that the framing and exposed surfaces required cleaning and were salvageable and did not require a full replacement. It said this is because the cause of water entry had now been resolved.
The complainant and MP did not agree with RIC. The insurer advised the complainant it would accept the complainant’s own independent report other than MP. The insurer advised cost of obtaining the report would be at the complainant’s own cost.
At the time of lodging AFCA compliant, in September 2023 the complainant wanted the insurer pay MP to complete the mould remediation work and testing and then for the insurer to authorise and manage the remaining repairs. On 31 October 2023, after further discussions with the insurer, the complainant advised AFCA that she no longer had faith in ABC and sought a cash settlement to organise the repairs herself. The panel accepts there is a breakdown in the relationship between the parties and it is fair that the claim now be cash settled.
Insurer says policy sum insured applies
The insurer has paid $120,702.48 for repairs and mould remediation plus temporary accommodation costs of $70,000. It has offered to pay the complainant $229,279.48 being the balance of the sum insured of $350,000 in settlement of the claim. The insurer has also paid the sum insured of $30,000 for the contents claim.
The insurer says its liability for the cost of repairs is capped at the $350,000 building sum insured because:
It arranged the strip out of all damaged items and the complainant delayed this
It arranged all necessary inspections to ensure the cause of damage had been resolved
RIC confirmed cleaning and remediation of the mould would be sufficient
It has not been negligent in its claim handling
It confirmed the current costs already paid towards the claim would be deducted from the sum insured, including building work and mould remediation incurred up to July 2023.
Complainant says insurer is liable to pay the full building sum insured
The complainant says the insurer negligent claim handling has resulted in the extensive damage to her home. In her latest email the complainant claimed $831,355.70 to cover ongoing temporary accommodation, mould remediation and building repairs.
The quote from MP of $618,955.70 is dated 29 October 2023. It includes over $430,000 in equipment hire and outstanding invoices for mould remediation. Given that the strip out is completed, the panel considers the mould remediation costs claimed in particular the equipment hire costs excessive.
Further the panel is not satisfied the quote clearly identifies the additional costs that can be attributed to the insurer’s claims management as against those costs likely to be related to the storm damage.
Fair for the Insurer to pay the full sum insured
The insurer’s claim mismanagement has left the complainant in a vulnerable situation. The settlement offered by the insurer, being the remaining sum insured, unfairly disadvantages the complainant as she did not have control over the insurer’s spending on the claim. Given the repairs to date have made insufficient progress, it would not be fair to require the complainant to arrange her own repairs within the building sum insured less the insurer’s expenses to date.
As the complainant has established a valid claim for the storm damage, the insurer should be required to restore her property to the pre incident condition. The insurer accepts that there is damage from the insured event (and agreed that it is now a total loss). On the evidence provided, the panel is not satisfied the insurer has proved that any of the current damage is excluded under the Product Disclosure Statement or that they should not be liable for this damage due to their mismanagement of the claim.
Given the available information, the panel considers it fair that the insurer pays the complainant, in addition to the costs of repairs and mould remediation paid to date, the sum insured of $350,000. Accordingly, the panel determines the insurer is required to pay the complainant the total building sum insured of $350,000.
Is the complainant entitled to ongoing temporary accommodation?
Yes. It is fair the insurer pays any outstanding temporary accommodation costs and for up to six months after the date of this determination as set out in section 2.2.
Complainant has been paid temporary accommodation costs as per the terms of the policy
The policy provides temporary accommodation costs of up to 20% of the sum insured are payable in the event temporary accommodation is required. There is no dispute that due to health issues the complainant requires temporary accommodation until mould remediation has been completed.
The complainant has been paid the maximum temporary accommodation costs ($70,000 being 20% of sum insured of $350,000)) payable as per the terms of the policy. The complainant remains in temporary accommodation and is incurring costs at the rate of $800 per week.
The panel is satisfied the need for ongoing temporary accommodation is due to the delays and poor case management of the insurer. While some delays may be attributed to the complainant’ conduct the panel is satisfied the remediation and repairs remain incomplete due to the claims handling.
In the circumstances and consistent with the principles of utmost good faith, the panel is satisfied the insurer should pay the complainant any outstanding temporary accommodation costs and continue to pay those costs for up to six months after the date of this determination to allow for the completion of the remediation and repairs.
Is the insurer liable to pay compensation for non-financial loss?
Yes. Based on the available information, the complainant has suffered an unusual amount of stress and inconvenience throughout the life of the claim. The insurer is to pay the complainant $5,400 in compensation for non-financial loss.
AFCA can award compensation for poor claim handling
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve a situation or interference with their expectation of enjoyment or peace of mind.
Compensation for non-financial loss payable to the complainant
The complainant has provided extensive submissions as to the effect of the insured claims handling on her and her mother that are supported by her medical reports.
The complainant has provided medical reports that confirm the complainant’s health has deteriorated during the claim process. Not only has the complainant suffered lung issues associated with mould exposure but she has also suffered an unusual degree of stress and physical inconvenience due to the insurer’s poor claim handling.
This has caused delays and compromised her and her mother’s physical and mental health. She says she has struggled to keep on top of rental and bill payments as she has been unable to work because of her health issues.
Having reviewed the available information, the panel considers that the complainant is entitled to $5,400 compensation in non-financial loss.
Why is the outcome fair?
While the panel accepts an insurer is generally entitled to rely on the terms of a policy to determine the extent of any liability exceptions should and do apply.
In this claim the insurers claims handling has, in the panels view, caused considerable delay in the completion of the remediation and repairs. The insurer failed to thoroughly investigate the cause of the damage and then having agreed to the complainant’s preferred remediation expert completing the remediation, sought to avoid this during the remediation process.
In the panels view the insurers conduct was not reasonable or consistent with utmost good faith. In those circumstances it is fair the insurers liability be extended beyond the terms of the policy.
Compensation for non-financial loss is fair given the significant stress and inconvenience suffered by the complainant and its impact on her health caused by the insurer’s claims handling.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience within the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.