Denial of storm damage claim for collapsed brick sub-floor foundation pier and claim handling errors
Text of the determination
Determination
|
Case number
|
12-00-1017740
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1017740 3 October 2024
Determination overview
Complaint
The complainant holds a home and contents insurance policy with the financial form (insurer) which provides cover for his home in the Blue Mountains, New South Wales. In July 2022 he lodged a claim for damage to his home. The complainant advised the insurer that, following a recent heavy rainfall event, a brick foundation pier located towards the front of his house collapsed. Subsequently, he noticed damage to his home, including movement of the front external stairs and their supporting slab.
The insurer denied the claim. It says the damage was caused by a combination of factors that are excluded from cover under the terms of the policy. These factors include inherent defects, and soil movement over time due to a lack of adequate drainage at the property.
The complainant also says the insurer mismanaged aspects of the claim and caused delay.
Should the insurer accept the claim?
Yes. The exchanged material demonstrates the proximate cause of the claimed damage is an insured event (’Storm, cyclone, rainwater or run-off’).
Should the insurer pay non-financial loss compensation?
Yes. It is reasonable and appropriate that the insurer pays the complainant the sum of $1,500 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
the complainant has established a valid claim for storm damage
the proximate cause of damage to the brick sub-floor foundation pier at the front part of the property was the July 2022 storms
the insurer is not entitled to exclude the claim based on the policy exclusions of earth movement and faulty design and workmanship
the insurer mishandled some aspects of the claim
the insurer’s conduct would have caused the complainant undue stress and inconvenience. In recognition of this, the insurer should pay the complainant $1,500 in non-financial loss compensation.
Determination
This determination is in favour of the complainant.
The insurer must resolve the complainant in accordance with Section 2.3, below.
Reasons for determination
Should the insurer accept the claim?
Yes. The exchanged material demonstrates the proximate cause of the claimed damage is an insured event (’Storm, cyclone, rainwater or run-off’).
Complainant says storm damaged his home
The complainant’s home is a two-storey masonry and timber weatherboard construction with a sheet metal roof, built in about 1928. It sits atop brick sub-floor foundation piers on land which, generally, slopes down from the rear to the front of the property.
The complainant purchased the property in about August 2020. He arranged for a pre-purchase inspection to be undertaken by KB, licensed building inspector, on 10 July 2020. Relevantly, KB did not find any defects with the brick sub-floor foundation piers supporting the front (northern) part of the building.
On 25 July 2022 the complainant lodged a claim for damage to his home. He advised the insurer:
Following the significant rainfall events of the preceding six months we have noted settlement of the house foundations due to unevenness of flooring and cracking in masonry walls for the front landing and supporting the northern end of the house. Following the most recent heavy rainfall event (2 and 3 July), on 4 July a brick pier located towards the front of the house collapsed. To provide temporary stabilisation for safety and to reduce loading on the adjacent piers, a prop was purchased and installed. During excavation for the footing groundwater was encountered at a shallow depth (approximately 0.15m) below existing surface levels [emphasis added].
The complainant is a practicing geotechnical engineer. He arranged for the purchase and installation of the temporary prop referred to above.
Subsequently, the complainant noticed the front staircase and its supporting slab had moved.
The insurer arranged for CR, loss adjusters, to inspect the complainant’s home on 31 July 2022. CR reported:
Met with the insured and was taken outside to go under the home. Once under the home noticed some of the pillars had fallen over due to the amount of water that rushed under the home. Then went over to the steps where they showed damage as well. The insured will be getting a builder out to look over everything as well as quote the repairs needed.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Policy Schedule [otherwise known as a Certificate of Insurance (COI)].
The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the contents of the documents.
Policy provides cover for damage and loss caused by ‘storm’
The policy covers loss or damage caused by various insured events, being the incidents listed in the policy documents, subject to policy exclusions. These incidents include ’Storm, cyclone, rainwater or run-off’. Page 17 of the PDS states:
Storm, cyclone, rainwater or run-off
What’s covered?
Buildings and/or contents:
✔ Loss or damage caused by:
• storm
• cyclone*
• rainwater
• run-off (provided run-off is not combined with flood waters).
[…]
✔ Loss or damage caused by or arising from:
• soil movement, including erosion
[…]
• subsidence:
if it is caused directly by and occurs within 72 hours of a storm.
The PDS also defines:
‘storm’ as violent wind (including cyclones and tornadoes), thunderstorms or hail which may be accompanied by rainwater or snow (see page 76)
‘rainwater’ as rain falling naturally from the sky onto the buildings and/or ground (see page 75)
‘run-off’ as rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas, provided such rainwater is not combined with flood waters (see page 75).
Complainant has established a valid claim
I am satisfied the complainant has established a valid claim. The foundation pillars supporting the front (northern) part of the dwelling were not defective when inspected by KB in July 2020. Moreover, the parties agree the storm which occurred on 2 and 3 July 2022 was severe. The complainant then discovered one of the pillars under the front part of his home had collapsed and caused damage to the building. Indeed, CR noted on page 2 of its report dated 31 July 2022:
POLICY LIABILITY
Accepted
The damages are the result of a covered peril. The reported scope of damages are for damages that appear to be sudden and accidental.
As mentioned, the onus now shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Insurer says damage excluded under terms of policy
The insurer says it is entitled to deny the claim because:
the dominant cause of the damage is gradual soil movement over time due to a lack of adequate drainage at the property
the policy excludes cover for loss or damage caused by soil movement, including erosion or subsidence, that occurs more than 72 hours before or after a storm
the policy also excludes cover for damage and loss caused by inherent defects, including faulty design or materials, structural defects or poor workmanship
the policy also excludes damage caused by wear and tear, gradual depreciation and lack of maintenance.
General policy exclusions are set out at pages 53 to 56 of the PDS, inclusive. The insurer points specifically to the following express exclusions.
Page 53 of the PDS states loss or damage is excluded from cover if it is caused by:
Wear and tear
Including depreciation, gradual deterioration, wear and tear or lack of maintenance.
Page 54 of the PDS states loss or damage is excluded from cover if it is caused by:
Soil movement:
Including erosion, landslide, mudslide or subsidence, unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood (where your policy schedule shows you have optional cover for flood).
Page 53 of the PDS states loss and damage is excluded from cover is it is caused by:
Inherent defects:
Including faulty design or materials, structural defects or poor workmanship.
Proximate cause of damage needs to be assessed
Damage can have more than one cause. For instance, in this matter the complainant says the damage was caused by the storm. In contrast, the insurer says the damage was caused by a combination of factors, all of which are excluded under the terms and conditions of the policy.
In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
Experts inspected the complainant’s home
In addition to CR, the insurer arranged for SW, engineer and building consultant, to inspect the complainant’s property on 6 December 2022. SW noted, amongst other things:
at the front of the dwelling about the entry, movement between the staircase and masonry wall at both sides of the stairs
cracking and delamination of the render from the staircase
significant cracking to the adjacent slab about the entry door
mould growth to the brickwork and render, indicative of long-term moisture exposure to the area
degradation of the foundation soil as well as rotation of the piers at various locations
initiation of reinstatement of the piers being conducted about the front section of the dwelling
foundation materials consist of clay soil
damp condition of the subfloor
no adequate subsoil drainage provision for the discharge of penetrated water from the subfloor.
SW concluded:
the clay foundation materials are highly susceptible to shrinkage upon drying and swelling upon wetting over multiple courses of rainfall, causing heaving and shifting within the footings gradually and progressively over an extended period of time
in the absence of adequate drainage installed within the dwelling, the subfloor is highly susceptible to stormwater penetration during heavy rainfalls, which has been causing subsoil saturation over a period of time
the dwelling is constructed on isolated brick piers with brick footings. Such an aged foundation system is particularly susceptible to movement due to non-homogeneous configuration, compared to tied systems such as concrete raft slab foundations
the observed movement and cracking on the stairs and slab at the front, as well as any movement damage within the dwelling, is not attributable to any single storm event or any other insurable event.
The insurer then arranged for CD, building consultants and engineers, to inspect the complainant’s property on 24 February 2023. Apart from observations very similar to those of SW, upon inspection CD noted:
steel framing in the subfloor, brickwork along the eastern façade and a brick wall along the eastern side of the subfloor space all appear to be newer than the bricks used along the other portions of the home, including the brick foundation piers. This suggests previous works to the property have been performed following its initial construction
the subfloor area was open along most of the southern, eastern, and western sides of the house. A brick wall extended along the full height of the subfloor at the northern side of the house, with topsoil sloped towards it.
Relevantly, CD concluded:
the observed damages are a result of predominately construction related issues pertaining to drainage and is not related to a single weather event
although soil movement would have occurred within 72 hours of the subject [insured] event, the collapse of the brick pier was likely the result of rotation over a long period of time
given the age of the home and the insured’s comments that the footings were not founded on the underlying sandstone, the house was likely constructed on shallow footings which are founded on the loose topsoil, permitting the rotation/movement of the brick piers/walls over time
the degree of rotation needed to cause a collapse to a brick pier is not expected to occur as a result of a single storm event
the overland flow into the subfloor space and around the property (due to a lack of drainage) over a prolonged period of time led to the subsidence of the underlying soil beneath the house, leading to the rotation of the brick piers/walls.
In summary, the insurer says:
the July 2022 storms were not the proximate cause of damage to the brick sub-floor pier at the front part of the property
the dominant cause of damage was gradual soil movement due to the lack of adequate drainage at the property
had adequate drainage been installed, the damage to the subfloor brick foundation pier would not have occurred.
Proximate cause of damage was an insured event
I am satisfied the exchanged material shows the proximate cause of damage to the brick sub-floor foundation pier at the front of the property was the claimed insured event (being the storms of early July 2022). This is because of the following considerations.
First, despite SW’s conclusion that the insured premises is built on clay soil, the parties now agree the complainant’s home sits upon sandy soils. This is because of evidence provided by the complainant, such as that set out in his email dated 16 December 2022:
The main premise of the [SW’s] report is that, as the building is constructed on clay soils… which are highly susceptible to shrink-swell movements… the observed damage should be anticipated for such a structure. This premise is incorrect in that the site soils are predominantly sandy in nature. [I am] a practicing geotechnical engineer… [I] drilled a number of boreholes around the building and encountered a profile generally comprising silty sand topsoil over residual sand with some sandy clay towards the horizon with sandstone bedrock. Sandstone bedrock generally appears to be present at depths ranging from 0.2m to 0.7m below the base of the existing footings. In this regard, the footings are not anticipated to experience significant (if any) shrink-swell movements and particularly not enough to result in the up to 21mm of cracking observed in the wall supporting the staircase landing, the toppling of a brick pier or rotation of other piers and the chimney. [Therefore], in this instance, the ground profile has been mischaracterised.
Given this evidence, SW’s conclusion that the dwelling ‘would be susceptible to differential settlement, subsidence and foundation movement due to long-term foundation reactivity’ (emphasis added), is questionable. As the complainant noted in an email dated 8 January 2024:
It should also be noted that the sandy soils that overlie the sandstone bedrock are anticipated to have a relatively high permeability and would thus be free-draining during less severe weather events.
Second, the visual pre-purchase building inspection report by KB dated 10 July 2020 shows the majority of brick sub-floor foundation piers were engaged and functioning. Whilst KB observed a slight lean to one of the brick piers under the rear portion of the property, the brick sub-floor foundation pier at the front part of the property was not leaning or damaged. This finding undermines the conclusions of CD that:
… although soil movement would have occurred within 72 hours of the subject [insured] event, the collapse of the brick pier was likely the result of rotation over a long period of time [emphasis added]
… the overland flow into the subfloor space and around the property (due to a lack of drainage) over a prolonged period of time led to the subsidence of the underlying soil beneath the house, leading to the rotation of the brick piers/walls.
Third, the parties agree the July 2022 storms were severe and the damage to the pier occurred during the storms or within 72 hours of them. This is consistent with the complainant’s version of events.
Fourth, based on analysis of rainfall in the years 2017 to 2022, SW concludes, amongst other things:
… if any movement to the soil have [sic] occurred as a result of a single rainfall event around July 2022, such movement would have been expected on earlier dates which experienced higher amounts of rainfalls in the previous dates.
However, the complainant’s analysis in this regard should be preferred. As the complainant notes in his email dated 16 December 2022:
Presumably, [the “higher amounts of rainfalls in the previous dates” referred to by SW is] the higher monthly rainfall in March 2022. From [my] experience in completing rainfall analyses for various projects, often soil movement is triggered not by the highest rainfall event (or period) but [by the] prolonged cumulation of moisture compounded by a second significant event. This was the case in 2022 when we had a significant long-term rainfall event in March/April (for… periods ranging from 15 to 90 days) which was then followed by a significant short-term event in July 2022, when the observed damage occurred. Indeed, in an analysis completed by [me] only one more significant series of events (in 1956) appears to have occurred since local records began in 1883. In this regard, [I do] not agree with the conclusion from the high-level rainfall analysis completed by SW that movement would have been expected on earlier dates. Rather, [I] consider that the significant rainfall event experienced in July was the proximate cause of the damage.
Fifth, the expert reports relied on by the insurer do not adequately acknowledge the fact that:
the brick subfloor foundation pier at the front of the property had performed satisfactorily for many years prior to the July 2022 storms
drainage under the property had coped satisfactorily with weather conditions for many years prior to the July 2022 storms
the pier under the front of the complaint’s home collapsed after unusually significant and severe storms that occurred in July 2022.
The complainant addresses this deficit in the evidence in his email dated 8 January 2024:
Even with this [sandy soil] drainage and the anticipated high permeability of the soils, failure of the brick pier did occur within 72 hours of the significant event and until this time the structure had performed adequately for approximately 90 years.
In conclusion, I am satisfied:
the complainant has established a valid claim for storm damage
the proximate cause of damage to the brick sub-floor pier at the front of the complainant’s home was the July 2022 storms
the damage arose from soil movement that was caused directly by, and occurred within 72 hours of, the storm event.
It follows the insurer must accept the claim.
Should the insurer pay non-financial loss compensation?
Yes. It is reasonable and appropriate that the insurer pays the complainant the sum of $1,500 in non-financial loss compensation.
Insurer made errors
Under the AFCA rules, non-financial loss compensation (capped at $5,400) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the part of the insurer.
I accept the complainant in this matter has suffered an unusual degree of physical inconvenience and interference with his expectation of enjoyment and peace of mind. This has arisen partly because of delays and errors made by the insurer during the claims process.
Indeed, in its ‘External Complaint Resolution’ letter dated 3 January 2024, the insurer stated:
However, the FF does acknowledge the errors in the claims process and has offered [the complainant] a good will gesture of $3,000 to resolve the dispute in its entirety.
The complainant did not accept the insurer’s offer.
The errors acknowledged by the insurer are clearly set out in the exchanged material. As such, there is no need to describe them in detail. In summary, however, I am satisfied the delay in the handling of the claim and errors acknowledged by the insurer caused the complainant undue stress and inconvenience.
Understandably, the complainant now feels aggrieved.
Given these considerations, the insurer should pay to the complainant the sum of $1,500 in non-financial loss compensation.
Complaint should be resolved in this way
Time is of the essence
Given my findings above, within 14 days’ notice that the complainant accepts this determination the insurer must pay to the complainant the sum of $1,500 in non-financial loss compensation.
If the complainant has completed repairs
If the complainant has completed repairs to the damaged brick sub-floor foundation pier at the front part of the property, within 21 days’ notice that the complainant accepts this determination, and upon production of suitable evidence of the cost of the repairs [such as tax invoices, etc.], the insurer must reimburse the complainant for the repair costs.
The insurer must also pay interest on this amount from the date of any invoice, to the date of settlement in accordance with section 57 of the Act. The insurer must also provide to the complainant an explanation, and breakdown, of how the interest has been calculated.
If the complainant has not yet completed repairs
If the complainant has not yet completed repairs to the damaged brick sub-floor foundation pier at the front part of the property, within 21 days’ notice that the complainant accepts this determination, the insurer must engage an engineer, qualified builder, or other suitably qualified expert.
This expert must then attend and inspect the property. It will need to draw up a SOW regarding the necessary repairs and associated works to the damaged brick sub-floor foundation pier at the front part of the property, as well as all damage to the property directly caused by the failure of that foundation pier.
Within a further 14-day period of receipt of the SOW, the insurer must obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. All repairs and remedial works included in the SOW and quotation(s) must also comply with all current and applicable Commonwealth and New South Wales building-related, safety-related and health-related laws, regulations and codes.
Within a further seven days of receipt of the associated quotation(s), the insurer must elect to either:
commence the necessary repairs and associated works as soon as possible, or
offer a cash settlement to the complainant comprising a sum equal to the total of the preferred actionable quotation, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required.
Finally, I note the delays that have already occurred, together with the nature of the storm-related damage. It follows that time is of the essence in relation to the satisfactory resolution of this complaint.
Why is the outcome fair?
Proximate cause of claimed damage is a ‘storm’
The outcome is fair in all the circumstances because:
the complainant has established a valid claim for the damage to the brick sub-floor foundation pier at the front part of the property, together with all damage to the property directly caused by the failure of that foundation pier
the proximate cause of the claimed damage is an insured event
the insurer is not entitled to rely upon a policy exclusion to deny the claim
the award of non-financial compensation is reasonable and appropriate.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.