Text of the determination
Determination
|
Case number
|
12-00-1014990
|
Financial firm
|
AIG Australia Limited
Case number: 12-00-1014990 18 December 2024
Determination overview
Complaint
The complainant held a home building and contents policy with the financial firm (insurer). On 29 November 2019, the complainant lodged a claim for damage she says was caused by a leaking pipe.
The insurer initially denied the claim. It later accepted the claim for building damage on 8 December 2022 and offered a cash settlement of $45,232.93 (offer). The complainant disputes the offer and seeks a cash settlement of $479,022 for the repairs. The complainant also wants the insurer to pay $57,360 for alternative accommodation and to contribute $5,000 towards legal costs.
The complainant is represented. Any reference to the complainant is a reference to the complainant and/or her representative.
Issues and key findings
Should the insurer increase its offer for building damage?
Yes. The insurer is required to pay the complainant $349,105 for the claim related damage in accordance with the quote prepared by T, less any payment already made for building damage.
Should the temporary accommodation sum be increased?
Yes. The insurer is required to pay the complainant $26,724 for temporary accommodation, less any payment already made for temporary accommodation.
Is the complainant entitled to professional fees?
Yes. Subject to the complainant providing evidence of the legal expenses she has incurred, the insurer is required to pay the complainant $5,000 for professional costs.
Did the insurer breach its duty of utmost good faith?
No. The panel does not consider the exchanged information shows the insurer breached its duty of utmost good faith.
Why is the outcome fair?
The outcome is fair because the policy covers the claimed damage and T’s report is the most persuasive expert report on the scope of works and associated costs. It is also fair the insurer increases its offer for temporary accommodation and contributes towards the complainant’s legal expenses given the complexity of the matter and the interactions between the parties.
Determination
This determination is in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of the determination:
the insurer is required to pay the complainant $349,105 for the building damage less any payment already made;
the insurer is required to pay the complainant section 57 interest on the settlement sum from 18 April 2024 to the date payment is made;
the complainant is required to provide the insurer with proof of the temporary accommodation costs and legal expenses incurred (supporting evidence); and
within 14 days of receiving the supporting evidence, the insurer is required to pay the complainant $26,724 for temporary accommodation and $5,000 for professional costs.
Reasons for determination
Should the insurer increase its offer for building damage?
Yes. The insurer is required to pay the complainant $349,105 for the claim related damage in accordance with the quote prepared by T, less any payment already made for building damage.
Onus on complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy.
Once the complainant has proved there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies.
Circumstances of claim
The complainant previously lodged a claim with AFCA in relation to the denial of the claim for damage caused by the leaking pipe. In that complaint, the parties agreed that a joint expert report as to the extent of damage and remedial measures required should be prepared by the insurer’s expert, FM, and the complainant’s expert, CE.
FM and CE provided a joint report dated 28 October 2022 (joint report). The joint report states, amongst other things, that:
assuming that all drainage and water main issues have been rectified, it would appear that the distress has slowed. The main cause of the distress was faulty underground drains and the water main leak. However, other issues are expected to be affecting the site and footings;
some continuing level changes may occur until the underlying soils return to their natural moisture content. The recorded floor levels appear to have reached their peak and have now stabilised. Any ongoing movement is expected to be attributable to typical seasonal movement, the big trees on the neighbouring property along the boundary and other landscaping issues;
since the footings are slightly under current day standards and the site is located in an area of moderately reactive clay soils, eradicating all movement is not practical;
they recommend the following remedial measures:
> the site be graded so water cannot pond directly against or adjacent to footings;
> trees and large shrubs close to the footings be removed or deep tree root barriers constructed to prevent encroachment of roots beneath footings if movement persists;
> all water supply pipes and service pipes be checked for efficiency and water tightness;
> the structure be monitored for any areas of continuing movement;
> final patching and repair works be commenced as the structure appears to have stabilised. Any further movement would be more likely the result of ongoing issues and not the escape of liquid event; and
> at this stage, there is no reason to underpin the existing structure. The footings have been affected by external water sources and do not appear to have any bearings issues with regards to the founding material. ‘Underpinning may be a solution to negate the tree influence on existing footings but would be considered a last resort and is separate from the distress caused by the leaking stormwater [drain] and water mains’.
Parties disagree on scope of works and associated costs
There is now a significant dispute between the parties regarding the scope of works required to repair the damage referred to in the joint report and the cost of those works.
On the one hand, the insurer instructed FM to obtain a scope of works from a building consultant, Q. Q’s report says the scope of works considered the joint report, a building dilapidation report from CE dated 18 August 2022 and the FM report dated 23 April 2020. Q states the scope of works is for ‘the repair of damage to the areas of the property outlined within the [joint] report’.
Based on Q’s scope of works, the insurer then obtained three repair quotes as follows:
from builder P dated 21 November 2022 for $45,559.75;
from builder E dated 1 December 2022 for $38,110.78; and
from builder A dated 25 September 2023 for $27,826.
The insurer made the offer on 8 December 2022 based on the quote from E plus a 20% contingency. The total offer was $45,232.93 net of the complainant’s $500 excess.
The insurer says both FM and CE found that the footings were not compromised by the leak. Therefore, the insurer says repairs to the footings or flooring should not be included in the scope of works. Further, it is fair that the offer is based on E’s quote, the majority of which relates to the repair and painting of damaged plaster. It also says a 20% contingency is fair in the circumstances.
The complaint has raised a number of specific issues with the quotes from P, E and A and says they are inadequate. She says all of the insurer’s quotes:
do not include repairs to the flooring which has been damaged as a consequence of the leak and resulting ground movement;
does not include ancillary work involving skirtings and cornices which is required to perform rectification works (such as the replacement of plaster); and
does not include repairs to the second floor of the property even though this was referred to in the joint report.
The complainant relies on the quote from her builder, S, for $459,000 inclusive of GST. She says the removal of the plaster walls revealed significant damage to the underlying brickwork which has not been quoted for. The possibility of such damage was previously identified, and the insurer agreed to cover the cost of brick stitching should damage be found. She has provided two invoices from C for brick stitching.
The complainant has asked the insurer to identify which items in the S quote it says are not covered by the joint report and which should not form part of the repairs. However, the insurer has not provided any such comments other than to say the quote covers works that ought not to be included based on the joint report.
The complainant subsequently obtained a report from a building consultant and quantity surveyor, T, dated 21 March 2024. The complainant asked the insurer if it would like to obtain a joint report from T but the insurer declined.
T’s report provides a scope of works and costings for rectification works carried out by S. T relied on various documents in preparing the report including the joint report, the previous reports of the parties’ engineers, the three building quotes obtained by the insurer, C’s quote and S’s costs breakdown for the rectification works. T has issued the report in accordance Supreme Court Rules 2016 - Regulation 6 Rule - Form 44A Expert Code of Conduct. T says:
based on Rawlinsons Construction Cost Guide 2024 Edition 32 (RCCG) for housing, small commercial & industrial buildings, it has adjusted the rates used for this property to take into account property location, site access and the risk perceived when work is rectification and remedial in nature;
it made a 5% allowance for contingencies;
a 2% addition for insurance based on the total cost has been added;
he has used the new build rates in RCCG despite the fact that these are rectification works and would normally attract a further 20% on labour rates;
the quote includes adjusting timber flooring from the underside to level the flooring and sealing and polishing it; and
it estimates the reasonable cost of the rectification works to be $349,105 inclusive of GST.
On balance, insurer should settle claim in line with T’s report
The panel has reviewed the various expert reports provided by the parties. The panel considers that T’s report is most persuasive. This is because T is a licensed building contractor and quantity surveyor with over 25 years’ industry experience. T has considered the joint report, as well as all expert reports provided by the parties. T provided a report in accordance with the Expert Code of Conduct and included detailed and well-reasoned estimates for the scope of works and related costs. T also has not been involved in any of the rectification works carried out at the property.
The panel considers the insurer’s expert reports were less comprehensive and, on balance, do not include all covered damage. This may in part be due to the fact that some of the insurer’s experts only carried out desktop valuations. Further, the panel acknowledges the insurer relies on the content of the joint report including section 8 of the report ‘Remedial Measures’ and the highlighted affected areas on the floor plan. While the panel accepts the joint report broadly refers to the types of rectification works required, it does not consider that it provides what could reasonably be considered a scope of works. It is also not clear if any of the quotes from the insurer’s experts are actionable. The panel also considers S’s costs included unrelated renovations concurrently with the rectification works and an allowance to remove and replace flooring. Given this, the panel is not satisfied that the insurer’s quotes or S’s quote are reflective of the true repair cost for the covered damage.
The panel notes for completeness that the joint report confirms underpinning works are not required as a result of the leak. However, the joint report does make findings in relation to movement and uneven floor levels because of the escape of liquid. The panel considers the evidence regarding the full extent of the damage to the flooring as a result of the leak is not clear. However, on balance, it is satisfied that some allowance for repairs to the flooring is reasonable and appropriate in line with T’s report. FM’s letter dated 5 April 2024 provides comments on S’s quote and T’s report. FM says that ‘if relevelling is deemed required due to the floor levels not completely returning to the pre-leak event levels…this can be achieved via localised access points to the subfloor to allow relevelling being completed from the subfloor area without needed to replace the entire floor…’. It also considers T’s proposed works in relation to the flooring is reasonable and notes the works referred to in T’s report for the most part cover the areas of the property affected by the leak (as identified in the joint report). It does however query issues regarding the extent of waterproofing and the repairs in the kitchen proposed in T’s report.
In the absence of any other more compelling information, the panel considers the scope of works and quote compiled by T is the most reflective of the claim related damage and therefore most persuasive. To bring finality to the claim, the panel considers it fair that the insurer settles the claim in accordance with T’s report. T’s estimate of $349,105 is inclusive of GST, includes a builder’s margin, contingency of 5% and insurance. In the circumstances, there are no further amounts or uplifts which need to be added to T’s costings.
If the complainant accepts the determination, the insurer is required to pay the complainant $349,105 (settlement) within 14 days of being notified of her acceptance, less any amounts already paid for building damage.
Section 57 of the Insurance Contracts Act 1984 (Cth)(Act) outlines the period for which interest is payable under a contract of insurance. Section 57(2) states that the insurer is required to pay interest from the date it was unreasonable of the insurer to have withheld payment of the amount. In the present circumstances, the insurer is therefore required to pay interest in accordance with section 57 of the Act from 18 April 2024 (being four weeks from the date of T’s report) to the date payment is made.
Should temporary accommodation sum be increased?
Yes. The insurer is required to pay the complainant $26,724 for temporary accommodation less any payment already made for temporary accommodation.
Policy covers temporary accommodation
The PDS states:
…If you are unable to live in your Buildings after the destruction, loss or damage has occurred, we will pay your reasonable alternative accommodation expenses for the period during which you are unable to live in your Building. The most we will pay under this additional cover is 20% of your Buildings sum insured, as listed on your Policy Schedule.
The COI shows the building sum insured is $1,030.000. Therefore, the maximum payment which may be made for temporary accommodation under the policy is $206,000.
Parties dispute temporary accommodation costs
The complainant says they moved into a nearby rental property for a 15-month period while completing repairs. The complainant acknowledges some of this time was due to the decision to complete renovations unrelated to the claimed damage. The complainant estimates the timeframe of insurance related repairs is six months.
The complainant has provided a lease for the rental property. The lease shows the complainant entered into an agreement to pay $9,650 per calendar month for the period 11 November 2022 to 15 November 2023. The complainant says the rental property is an inferior property to the insured property.
The insurer says data from realestate.com.au shows the median rental price for four-bedroom houses in the complainant’s suburb is $1,400 per week. The insurer says the estimated repair timeframe is four weeks. The insurer has therefore offered to pay the complainant $5,600 for temporary accommodation.
Insurer is to increase amount paid for temporary accommodation
The panel has considered the information provided by the parties. The actual duration of covered damage repairs is unclear as the complainant carried out significant renovations at the same time. It is also not clear how the complainant calculated the timeframe of six months. The insurer says the repair timeframe is four weeks. This is based on E’s estimated timeframe. However, for the reasons discussed above, the panel does not consider the insurer’s proposed repair method was adequate to repair the covered damage. The report from T estimates the repair timeframe to be 12 weeks. In the absence of any other further information, the panel considers this timeframe is reasonable and appropriate.
The panel also acknowledges the insurer disputes the temporary accommodation amount. The insurer appears to have referred to the median cost of rental properties in the complainant’s suburb. However, it is unclear from the information provided whether the insurer considered any specific rental properties in the suburb, or if it took into account the property type (e.g. house or apartment) or features of the property (e.g. condition, size and amenities such as a pool). The complainant leased a three-bedroom townhouse with two bathrooms for $9,650 a month, which equates to $2,227 per week.
The insured property is a four-bedroom house with two bathrooms on 784 sqm and includes a pool. The property was of a high standard. In the circumstances, the panel considers the rental property leased by the complainant is more likely to resemble the property than a four-bedroom house in the suburb which could be leased at $1,400 per week. Therefore, subject to the complainant producing evidence of the rental costs she paid, the insurer is to pay the complainant for 12 weeks of temporary accommodation based off the rental cost of $2,227 per week.
If the complainant accepts the determination, the complainant is to provide the insurer with evidence of rental costs paid by the complainant for at least 12 weeks rental accommodation within 14 days. Within 14 days of receipt of the evidence of rental costs incurred, the insurer is required to pay the complainant $26,724 (12 x $2,227) less any payment already made for temporary accommodation costs.
Is the complainant entitled to professional fees?
Yes. Subject to the complainant providing evidence of the legal expenses she has incurred, the insurer is required to pay the complainant $5,000 for professional costs.
AFCA may require insurer to contribute to a complainant’s professional costs
Under its Rules, AFCA can require an insurer to reimburse the complainant for professional costs incurred in making the complaint. This may include legal costs, expert report fees, or travel expenses.
If the complainant asks the insurer to contribute to these costs, we will consider whether they were reasonable, and whether they helped resolve the complaint.
Unless there are exceptional circumstances, we will not require the insurer to contribute more than $5,000 toward these costs.
Insurer to contribute towards complainant’s legal expenses
The complainant engaged a solicitor to act on her behalf. This includes making submissions to the insurer and AFCA on the complainant’s behalf.
The panel is satisfied the issues in dispute were of a complex nature. The process was also protracted by the insurer initially denying the claim. As such, it was reasonable for the complainant to seek legal representation/assistance in order to pursue the claim.
Given the outcome, and for the reasons discussed above, the panel is satisfied that subject to being provided evidence of legal expenses incurred by the complainant, the insurer is to pay the complainant up to $5,000 towards her legal expenses.
Did the insurer breach its duty of utmost good faith?
No. The panel does not consider that the insurer breached its duty of utmost good faith.
Complainant says insurer breached its duty of utmost good faith
The complaint says the insurer’s conduct throughout the complaint amounts to a serious breach of its duty of utmost good faith. The complaint says this includes (but is not limited to) incorrectly denying the claim based on FM’s first report, instructing P, E and A to only quote on repairs to plaster and ignore other damage, insisting the joint report constituted a scope of works and actively directing experts to limit their scope and costs.
Insurer did not breach its duty of utmost good faith
While the panel agrees the complainant has now established the movement was caused by the leaking pipe and the insurer’s settlement is not sufficient, this does not amount to a breach of section 13 of the Act.
The insurer engaged FM to investigate the cause of the cracks and FM concluded (rightly or wrongly) that the damage was not from a leak and that it was due to other causes not covered by the policy. It was not unreasonable for the insurer to deny the claim based on the expert report received.
Further, while CE started investigating the damage in approximately June 2020, it did not conclude the movement was from a leaking pipe until its report on 25 October 2021. It took CE approximately 16 months to establish movement in the floor and then stabilisation.
While there was a large discrepancy between the insurer’s offer and the complainant’s proposed settlement, the panel is not satisfied either proposal accurately reflected the covered damage. In other words, the insurer’s offer was not sufficient and the complainant’s proposed settlement was excessive. It was not until the complainant obtained T’s report in March 2024 that an accurate picture of the scope of works and costs to repair the covered damage was obtained.
An allegation an insurer breached its duty of utmost good faith is a serious one. It requires clear and cogent evidence. The panel is not satisfied, based on the evidence available, that the insurer’s claim handling was so poor that it amounts to a breach of its duty of utmost good faith.
Why is the outcome fair?
The outcome is fair because the policy covers the claimed damage and T’s report is the most persuasive expert report on the scope of works and associated costs. It is also fair the insurer increases its offer for temporary accommodation and contributes towards the complainant’s legal expenses given the complexity of the matter and the interactions between the parties.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance sector.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.