Determination 12-00-1012471
Landlord insurance claim for earthworks damage denied
Summary
The complainant, a landlord, claimed under a specified events policy for damage caused by earthworks next door, and the insurer denied the claim. AFCA found the damage was not shown to be malicious damage or vandalism and ordered nothing.
A specified events policy requires the complainant to show loss from a covered event, and reckless indifference requires more than negligence.
Issues
- Claim denial primary · not upheld“The insurer denied the claim due to the damage not being caused by an event the policy covers.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
|
Case number
|
12-00-1012471
|
Financial firm
|
Insurance Australia Limited
Case number: 12-00-1012471 31 October 2024
Determination overview
Complaint
The complainant holds a landlord insurance policy with the financial firm (insurer). The complainant lodged a claim for damage to her property following earthwork completed to the lot next door.
The complainant says the earthwork completed over three days caused significant damage to the internal and external of the rental dwelling and the commercial dwelling on the property.
The complainant says despite numerous requests to turn down the machinery or stop the work altogether, the contractor ignored the requests and completed the work anyhow.
The insurer denied the claim despite accepting the proximate cause of the damage was the earthworks. The insurer denied the claim due to the damage not being caused by an event the policy covers.
The complainant considers the damage has been caused maliciously or with reckless indifference by the contractor.
Issues and key findings
Has the complainant established a valid claim?
No. The complainant has not established the damage falls within the insured event of malicious damage or vandalism.
Why is the outcome fair?
The complainant has not established a valid claim. It follows it is fair for the insurer to deny liability for the claim.
Determination
This determination is in favour of the insurer.
The insurer can deny the claim.
Reasons for determination
Has the complainant established a valid claim?
Complainant has the onus of establishing a claim within the policy terms
The complainant’s policy is a specified events policy. It only provides cover for loss or damage to the complainant’s property arising from a number of defined events including malicious acts and vandalism.
The policy does not define ‘malicious act’ or ‘vandalism’. When a policy does not define a term, AFCA relies on the ordinary meaning of the word.
The Macquarie Dictionary definition of ‘malicious’ is:
adjective 1. full of, characterised by, or showing malice; malevolent.
2. Law motivated by vicious, wanton, or mischievous purposes, as in malicious arrest, malicious injuries to persons or property, malicious prosecution, etc.
The Macquarie Dictionary definition of ‘vandalism’ is:
noun 1. wanton or malicious destruction or damage of property.
2. wilful or ignorant destruction of artistic or literary treasures.
3. conduct or spirit characteristic of a vandal.
In addition, the courts have found a malicious act requires evidence that the act was deliberately carried out, with the intention to cause harm. The courts however did not consider whether reckless indifference was sufficient to constitute malice.
Based on this, I accept vandalism is wanton or malicious property damage and a malicious act is the intentional doing of a wrongful act without just cause. I accept that where a party recognises the risk of causing damage, but shows a reckless indifference to causing that damage, that such damage can be malicious damage for the purpose of the policy.
However, it is important to note reckless indifference requires more than negligence or carelessness.
The onus is therefore on the complainant to show that the damage to the property was caused by an intentional act without just cause or with reckless indifference to the likely damage arising from the act. I note the complainant’s argument is that the contractor acted with reckless indifference to the likely damage arising from the works.
Circumstances of the loss
On 19 April 2023, the lot next door to the complainant’s property had a development commence with earthworks being carried out.
The complainant says it became apparent on the first day the earthwork was being carried out in close proximity to the complainant’s fence. This was then causing the rental property at the front and the commercial property at the back to suffer significant vibration and shaking.
The complainant contacted the local Council authority (LA) which sent out two employees to assess the situation. The LA employees requested the machinery be turned down to try to limit the impact to the neighbouring property.
The complainant says despite this, she was required to call the LA twice more for further visits, as well as contact the contractor (BCG) by email and phone requesting a cease and desist on the work. This was due to the damage it was causing the property. The complainant says BCG ignored her request and completed the work over three days.
The complainant says BCG acted with reckless indifference by ignoring the LA’s directions to reduce the impact of the machinery, as well as ignoring the complainant’s request for work to cease due to the impact it was having on the property.
The insurer says that although there is evidence of LA employees attending and requesting BCG turn its machinery down, there is no evidence to suggest the machinery was turned up again.
The complainant provided witness statements from numerous third parties. These statements say the machinery continued at its same level prior to the LA employees visit and after.
Expert reports
The insurer engaged the service of builder (U) to assess the reported damage to the property. U’s report is limited as it confirms the need for a specialist to determine the cause of the damage.
However, U did comment that while the property was showing signs of age-related deterioration, wear and tear, there does appear to be slightly more damage to the side closest the development. U further commented the commercial property at the rear appears to be damaged resulting from the development next door.
The insurer engaged the services of an engineer (C) to provide commentary on the cause of the damage sustained to the property.
Due to the extent of this report, I have summarised it in section 3.3 of this determination.
In short, C concludes:
there is frequent light cracking throughout the dwelling and moderate foundation movement primarily sinking into the centre other than the southwest and southeast corners
there are historical repairs throughout the dwelling
the cracking within the dwelling is within the expected range for the soil reactivity, abnormal moisture conditions, trees within the zone of influence, age, and construction methodology
cracking to the structures and external concrete apron slabs is not concentrated near the construction site nor more significant on the southern side
the consistent damage throughout indicates long-term issues consistent with the curvature of the foundation
there is a high likelihood the compactor has exacerbated cracks and it is recommended a partial financial settlement be made
any vibration damage from the neighbouring constriction work is negligible in comparison and has not changed the repair methodology that was already required.
The complainant also provided a routine inspection report from her property manager, which was conducted approximately eight weeks prior to the claimed event.
This report shows issues of cracking in numerous rooms prior to the claimed event.
|
Room
|
Comment
|
Entrance Hall
|
Walls
lighter touch up paint marks visible on LHS
crack down BR1 door frame
|
Lounge Room
|
Ceiling
cracks around cornice
|
Kitchen/Meals
|
Walls
crack below kitchen window to benchtop
|
Bedroom 1
|
Ceilings
crack along cornice above window
|
Bedroom 2
|
Ceilings
cracked around cornices
|
Bedroom 3
|
Ceiling
cracked around cornices
|
Balcony/Porch
|
aged front porch
crack in concrete walkway
coloured aged concrete on porch.
The complainant also said she has an engineering report for the rear shed which concluded the contractors at the adjacent site ‘failed to provide and install structurally adequate, safety measures and maintain adequate distance from the property boundaries when operating machinery with relation’ to the property. She later provided a copy of this report which confirmed this finding with pictures. The report was mainly to do with the commercial shed.
Information does not show malicious damage or vandalism applies
Having carefully considered the exchanged information, I note the following.
There is nothing provided by the LA that indicated the works being done on the adjacent site was wrong, improper or negligent. Despite the complainant sending correspondence to the LA about this issue, it appears no action has been taken against the builder or developer by either them or any other authority.
C’s report does not identify any negligent or improper workmanship by the adjacent builder.
The complainant has recently provided a copy of the engineering report where she says an expert concluded there was improper work. However, even if I was to accept the engineer’s opinion, it is not clear why this was not identified by the LA when attending the site either of the three times. For instance, it would have been reasonable for the builder next door to conclude that if their works were negligent, this would have been identified by the LA in at least one of the three visits. There is nothing to indicate the LA identified these factors.
I acknowledge the complainant called the LA several times who then asked the workers to tone down the noise. However, importantly, the LA did not request the work cease. There is also nothing directly by the LA to describe exactly what they directed the builder to do. Further, and of significance, the exchanged information does not show either the council, nor any department with sufficient authority, requested the work cease or identified the works breaching any current building or developmental order. The only person asserting this is the complainant.
The evidence is far from clear that excessive noise alone was the cause of the damage. Whilst I acknowledge the insurer does not dispute the works caused the damage, the information does not show the works were negligent or, if so, to what extent and whether that caused the damage. Further, the available expert information and the periodic inspection reports show there were pre-existing issues with the property before the works began that were possibly a causal factor.
I acknowledge the complainant requested the builder to cease given the damage and this was not adhered to. However, I do not accept it was incumbent on the builder to cease work solely at the complainant’s direction given:
the LA, who had attended three times during the works, provided no such order,
the builder was doing works pursuant to relevant paperwork and authority,
no one with any authority has stated their works breached any order or guidelines, and
there is nothing to show a contractor doing works on another site is required to cease work at a direction from a neighbour or accept their assertion about the cause of damage.
It is also important to note that even if I was to conclude the works were negligent, it does not make it malicious. Being recklessly indifferent requires more than negligence. That is not established here.
Given all this, I do not accept the complainant’s argument. That is, I do not accept the builder was recklessly indifferent to the risk by continuing the works in these particular circumstances.
It follows I do not accept based on the exchanged information, the builder’s works can fairly be characterised as malicious damage or vandalism.
Given this, and the fact the complainant has not referred to any other insured event that may apply, it follows the insurer can deny the claim on this basis.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Policy terms
Impact damage
If loss or damage is caused by an item shown here.
Covered under Buildings Insurance and Contents Insurance
loss or damage cause by the impact of:
external aerials, masts, flagpoles or satellite dishes
aircrafts, vehicles or watercrafts
debris from space, aircrafts, rockets or satellites
trees or branches
Covered under Buildings Insurance
if a tree on your site causes loss or damage to your rental property and a qualified expert agrees it needs to be removed, then we pay the cost to:
cut down and remove the tree
treat the stump so it doesn’t grow.
Not covered
loss or damage cause by tree cutting, lopping o felling on your site
costs to remove the stump
costs to cut down or remove a tree if it didn’t cause any damage to your rental property or contents.
Vandalism or a malicious act – by someone else
If loss or damage is caused by vandalism or a malicious act by someone other than a tenant or their guest.
Covered
vandalism or a malicious act by someone other than a tenant or their guest.
Not covered
vandalism or a malicious act by someone who enters the rental property or site with your or your tenant’ consent.
Engineer report summary
|
Report
|
Key points
|
Insurer’s expert (C)
Engineering report
23-05-2023
|
General
ground surface against the footings is capped with a concrete apron slab at the eastern, northern and part of the western elevations
the ground surface at the southwest corner of the dwelling consists of uncapped garden beds
External Damage - Dwelling
the brick strip footing is cracked, broken off, and displays movement throughout the exterior of the dwelling
there are multiple, up to 10mm, cracks in the concrete porch slab
there is up to 20mm disengagement between the porch slab and the wall of the dwelling
the concrete apron has spalling along the edge and joins
there are multiple, up to 5mm, vertical cracks extended through the brick and mortar of the strip footing
there s approximately 15mm horizontal displacement of bricks adjacent to the porch with moss growth present in the surrounding area
there is spalling of bricks
a corner section of brick and timber cladding is damaged with sections of bricks broken off
timber cladding is bent outward and shows signs of historic patching
moss growth and efflorescence are present on the soil, concrete, and brickwork adjacent the downpipe
deterioration of timber and brick cladding is evident throughout the area
the downpipe is rusted, and the concrete is cracked at the exit
|
Report
|
Key points
|
Insurer’s expert (C)
Engineering report
23-05-2023
|
Internal Damage - Dwelling
approximately 1mm cracks are present in the wall and ceiling lining throughout the dwelling
multiple 1mm vertical cracks extended along interior corners with signs of historic patching in living room, kitchen and hall
up to 3mm vertical crack extends between an architrave and the cornice with signs of historic patching in the kitchen
a hairline diagonal crack extends from a window architrave in the kitchen
a 1mm disengagement between timber sections of the doorframe with signs of historic patching in the kitchen
multiple sections of timber mouldings display 1mm disengagement from the wall and ceiling throughout the room in the laundry
1mm diagonal crack extends from the architrave to a timber moulding and the architrave is damaged and shows signs of historic patching in the wash house
3mm diagonal crack extends from the architrave toward the cornice and the wall is disengaged from the wall and ceiling in the wash room
the concrete slab is cracked at the start of the hall outside the wash house
a hairline vertical crack extends along an interior corner with signs of historic patching in the hall
multiple hairline to 1mm cracks in the wall lining and the grout between wall tiles in the bathroom
1mm vertical cracks extend from the architrave to the cornice with signs of historic patching in bedroom 3ultiple 1mm cracks are present in the wall and ceiling lining throughout bedroom 2
multiple hairline to 1mm cracks in the wall and ceiling lining in the master bedroom.