Flood building damage claim partly declined

FirmSuncorp Group
Decided2024-12-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for flood damage to his home, including cracking, movement and mould, and the insurer denied the claim as excluded ground movement and unproven mould. AFCA upheld the denial of the cracking, movement and mould damage but found the subfloor damage covered and ordered it settled under the policy.

Slow soil-moisture movement outside the policy's 72-hour window is excluded, while the flood inundation of the particleboard subfloor was shown to be a covered loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1008024 | Financial firm | AAI Limited Case number: 12-00-1008024 19 November 2024 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under his home building insurance policy held with the financial firm (insurer), for damage to the insured property caused by flood. The insurer denied the claim for building damage. It says that the complainant has not established a loss which is covered by the policy. Alternatively, the insurer says that the cause of the damage is excluded from cover under the terms of the policy. 1.2 Issues and key findings Is the insurer entitled to deny the complainant’s claim? The insurer is entitled to deny the claim for cracking and movement damage and mould damage. The insurer is not entitled to deny the claim for damage to the particleboard subfloor. Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim for cracking and movement damage and mould damage. Where the complainant has established damage to the particleboard is a loss of the type covered by the policy, and the insurer has not established a policy exclusion applies entitling it to deny the claim, it is fair for the insurer to accept the damage to the particleboard subfloor. 1.3 Determination This determination is substantially in favour of the insurer. Should the complainant accept this determination, the insurer is to settle the claim for damage to the subfloor (and any floor coverings that must be removed and damaged to replace the subfloor) in accordance with the terms and conditions of the policy. Should the insurer cash settle the claim, the insurer is to obtain three actionable quotes and pay the complainant the highest quote plus 15% uplift for the transfer of risk to the complainant and the loss of his lifetime warranty on the repairs. 2 Reasons for determination 2.1 Is the insurer entitled to deny the complainant’s claim? The insurer is entitled to deny the claim for cracking and movement damage and mould damage. The insurer is not entitled to deny the claim for damage to the particleboard subfloor. Coverage of the policy The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations, and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. Insured events include flood. The PDS details the flood cover at page 39 of the PDS as follows. We cover Loss or damage caused by flood. We don’t cover • loss or damage caused by flood if you do not have flood cover. ... • resultant cracking to sealed paths, sealed roads and sealed driveways, but we will cover them if they are washed away by the flood; • damage to external paintwork of the building, if that is the only building damage caused by the flood; • loss or damage to gates, fences or wall fences that would be considered by a reasonable person to be in an obvious state of disrepair before the loss or damage occurred; ... We don’t cover • loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, flood and not because of erosion, structural fault or design fault. The policy also contains several general exclusions at page 27 of the PDS that apply to all cover including the following: Things we don’t cover Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • ‘Flood’ (but only if you have cover for insured event ‘Flood’) page 39; ... It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation, or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Circumstances of the loss and claim The complainant lodged his claim with the insurer on 29 December 2022, advising that the property had been damaged by a flood event that occurred on around 17 October 2022. The complainant says the flood water entered the property and took more than a week to subside, causing the foundation stumps to move resulting in cracking throughout the inside of the house and outside in the driveway and pathway. He also says the laundry and second toilet where water entered the house has damaged the particleboard flooring and slate tiles to the extent they need total replacement, and that the inundation resulted in a mould issue at the house. On receipt of the claim the insurer engaged assessor builder AC who inspected the damage to the property on 18 January 2023. AC observed cracking throughout numerous rooms at the property and that there were no signs of mould or water damaged plaster. AC noted the possible house movement and recommended an engineer attend the property. The insurer then engaged engineer JH who attended the property on 9 February 2023. JH noted the following: the cracking through the property is not significant and within the threshold of what can be considered normal household maintenance the ground under the suspended floors is not graded allowing surface water to pond under the building resulting in soil saturation the property is not compliant with the Building Code of Australia surface water drainage requirements, as the surface around the slab does not have enough slope causing water to pond the soils at the property are reactive clay soils according to CSIRO produced Australian Soils Research Information System trees were located close to the footings floor level survey showed a 33mm variation with the low point being at the hallway on the centre of the house the downpipes at the dwelling are non-compliant and a cracked downpipe was noted discharging directly onto the ground around the property and constantly wetting the soil in those areas there were inadequate control joints in the concrete slabs. JH concluded that the cause of damage was long-term differential foundation settlement. The insurer’s assessor DC reviewed the JH report on 22 March 2023 and determined that a further review of the flooring where the waters entered the home was needed, but that the cracking damage to the property was excluded under the policy. On 3 April 2023 builder PD attended the property to inspect the subfloor for flood damage. PD was unable to inspect the subfloor due to it being difficult to access, however provided photos from various accessible points around the house. PD noted that complete subfloor saturation had occurred, and that there was observable damage to the subfloor. PD says: As well as the main concern of uneven floor levels throughout the house, a result of prior renovation works by the owner means there are many points of uneven or unfinished flooring and plasterwork throughout the dwelling. As such, it is indeterminable as to whether these damages existed prior to the event or otherwise. The complainant arranged for his own report regarding the cause of damage through Emergency Recovery Victoria. On the 31st of March 2023, the builder JL inspected the property with a team comprising of a hygienist, structural engineer, OHS representative and an electrician. The JL engineer noted that it was difficult to define the scope of flood damage conclusively without relevant pre-flood information for ‘before and after’ comparison. JL made the following finding regarding the structure: A structural engineer has undertaken an inspection of the structure and confirms that there are no major structural issues as a result of the October 2022 Flood event. However, a Structural Engineer has undertaken an inspection of the structure. The following defects are highly likely to be pre-existing prior to the October 2022 Flood event and have likely been worsened by the flood waters. Although these do not present an immediate risk, the Structural Engineer has encouraged the following be promptly addressed to prevent further structure degradation: • Cracking in external concrete slab • Settlement to foundations • Cracking to internal wall linings • Minor rotting to roof rafter On 26 April 2023, the complainant notified the Insurer that the carpet underlay in a bedroom was still wet and had not been inspected by the builder or engineer. The insurer engaged hygienist RI to attend the property on 12 May 2023. RI conducted a mould assessment and did not find abnormal moisture levels or mould. Based on its assessment of the damage, and the JL report, the insurer denied the claim on 22 June 2023. It says the complainant had not shown the damage to his property was caused by the flood, and that damage caused by ground movement is specifically excluded under the policy. Complainant engaged second engineer to provide an opinion on cause of damage The complainant expressed concerns that the experts who reported on the cause of damage, including the independent reports arranged by him from JL, were biased. The complainant engaged engineer DH to provide a further report on the cause of damage. DH attended the property on 16 May 2024. DH conducted a second floor level survey to compare with the results of the survey conducted by the insurer‘s engineer JH on 9 February 2023. The new floor levels taken on 16 May 2024 indicated variations of +17mm and -17mm difference between the floor survey taken approximately 15 months earlier. DH observed that the existing building has experienced movement related distress in the past, which is evident through pre-existing cracking in the sections of the plaster wall. DH agreed that the cause of the pre-existing movement is likely from foundation movement due to differential moisture conditions and the highly reactive clay at the site. DH says: As expressed in the original engineers report the site has trees and site maintenance issues which have caused the variations in the moisture content of the highly reactive clay and subsequently caused differential movement related distress to the building. We do not disagree that pre-existing distress to building has occurred. It was DH’s view that it was unproven that long term differential movement is the only source of movement distress within this section of the house and that the flood water ponding around and under the building has impacted the building directly. It was JL’s opinion that the flooding and subsequent saturation of the highly reactive clay foundation around and under the building has caused movement to the building, and it was likely that ongoing settlement may still be occurring. The DH report also notes that no detailed soil testing or report was completed during the original investigation to determine the moisture content of the clay foundation at the time of the original floor survey. The complainant also disagrees with the findings of the hygienist. He told the insurer he was concerned the mould issues at the house may be unresolved. The insurer engaged hygienist VA to attend the property on 17 August 2023, to investigate the complainant‘s concerns about mould. On 21 August 2023, VAS attended the property and noted the following: the visual evidence is consistent with flood waters not entering the house elevated moisture levels in the vicinity of the bathroom are consistent with a leak and not likely to be related to the flood that occurred almost one year earlier excess moisture had activated fungal growth to the bathroom area surface samples taken in multiple locations at the property were consistent with normal levels of habitable fungal ecology two samples taken from the flooring substrate showed the presence of fungi commonly found in non-habitable areas bacterial sampling indicated acceptable levels of bacteria were present. Complainant must show proximate cause of damage was the flood As stated, the complainant has the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy. There is no doubt there is damage, but it is accepted insurance law and consistent with the coverage provided by the policy, that the complainant must establish that the proximate cause of damage was caused by the flood as detailed within the terms and conditions of the policy. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause causes loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause. Information shows cracking and movement damage property not covered by the policy I am satisfied that the reports from engineers JH and JL are thorough, logical, compelling, and supported by helpful photographs. The reports are also consistent with the view of DH. The engineers agree that the cracking and movement damage at the property is caused by moisture variation in the reactive clay soils resulting in differential settlement of the footings and cracking. I accept that the flood waters did not subside for some time, and DH‘s opinion that the saturation of the soil around the footings during the flood may have exacerbated the movement of the footings. However, the process of soil saturation and subsequent drying process described by the DH report is a slow process of earth movement occurring over time. The policy only covers earth movement that occurs within 72 hours of the flood event. I do not consider the DH report supports that the movement of the footings occurred within 72 hours of the flood. The complainant has not met his onus to establish a loss covered by the terms and conditions of the policy regarding the cracking and movement damage at the property. I am satisfied that the policy does not provide coverage for this damage. Further the cause of the damage, earth movement over time, is specifically excluded from coverage under the terms and conditions of the policy. The result is that the insurer is entitled to deny the complainant’s claim for cracking and movement damage. Information shows damage to particleboard subfloor was caused by flood event The parties agree there was a complete inundation of parts of the subfloor. The complainant says this inundation was in the laundry and second toilet and it damaged the particleboard flooring beneath the tiles. As stated, builder PD was engaged specifically to report on the damage to the subfloor. PD could see that parts of the subfloor had been inundated and there was observable water damage, but that it was difficult to say whether the damage predates or post-dates the flood. While the insurer’s hygienist RI noted there was no moisture damage to the house, they did note water damage to the particleboard subfloor in the loungeroom. In circumstances where the subfloor was inundated and has observable water damage I am satisfied, on balance, the complainant has shown the damage to the particleboard subfloor is a loss of the type covered by the policy. The insurer does not seek to rely on any exclusions regarding the particleboard damage but says there is no objective evidence that the inundation of the subfloor occurred. Given the above, I disagree with the insurer. I am satisfied on balance, the complainant has met his onus to establish a loss covered by the terms and conditions of the policy, regarding the damage to the subfloor. The insurer has not established the application of any policy exclusion. The result is that the insurer is not entitled to deny the complainant’s claim for damage to the subfloor. Should the complainant accept this determination, the insurer is to settle the claim for damage to the subfloor (and any floor coverings that must be removed and damaged to replace the subfloor) in accordance with the terms and conditions of the policy. Should the insurer cash settle the claim, the insurer is to obtain three actionable quotes and pay the complainant the highest quote plus 15% uplift for the transfer of risk to the complainant and the loss of his lifetime warranty on the repairs. No information to support flood related mould damage to property I am not satisfied the complainant has established, on balance, his property sustained any mould damage due to the flood. I acknowledge the complainant says there was mould growth at the property, however he has not provided photographs or any other information to support this claim. None of the experts who attended the property noted visible mould, or other obvious signs of mould growth. Further, all mould testing revealed normal levels of fungus and bacteria apart from an isolated result around the bathroom which VA says is more likely to be due to a leak in the bathroom. Given the above, the complainant has not met his onus to establish a loss covered by the terms and conditions of the policy. The result is that the insurer is entitled to deny the complainant’s claim for resultant mould damage from the flood event. 2.2 Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim for cracking and movement damage and mould damage. Where the complainant has established damage to the particleboard is a loss of the type covered by the policy, and the insurer has not established a policy exclusion applies entitling it to deny the claim, it is fair for the insurer to accept the damage to the particleboard subfloor. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.