Text of the determination
Determination
|
Case number
|
12-00-1007821
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-00-1007821 26 November 2024
Determination overview
Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
On 7 January 2022, she lodged a claim for storm damage to her property. The insurer initially accepted the claim and authorised repairs. After investigation, the insurer’s experts said that the property had existing defects and that it could not warrant the repairs. On that basis, the insurer has sought to cash settle the complainant for damage.
The complainant says the cash settlement is insufficient to repair the damage. She also says the insurer mismanaged the claim and seeks compensation for the undue stress and inconvenience this has caused her.
Issues and key findings
Should the insurer increase its cash settlement offer?
Yes. The insurer’s offer is insufficient because it does not cover repair costs of all the damage caused by the storm. The insurer should pay the amount specified in the complainant’s quote plus interest.
Is the complainant entitled to further compensation for non-financial loss?
No. The insurer waived the complainant’s $5,000 excess in March 2023. Since that time, I consider both parties have contributed to any further delays and the complainant has been adequately compensated.
Why is the outcome fair?
The outcome is fair because the insurer has not properly assessed its liability in accordance with the terms and conditions of the policy. The cash settlement offered to the complainant is insufficient. It is only fair that the complainant be fairly compensated for the damage that occurred at her property.
Determination
This determination is in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is to pay the complainant:
$245,475.59 plus section 57 interest from 27 July 2023, and
$2,640 in professional costs.
If the complainant has already been cash settled $41,736.82, the insurer is entitled to deduct this amount from the final cash settlement amount.
Reasons for determination
Should the insurer increase its cash settlement offer?
Yes. The insurer’s offer is insufficient because it does not cover repair costs of all the damage caused by the storm. The insurer should pay the amount specified in the complainant’s quote plus interest.
The policy covers accidental damage, subject to exclusions
It is established insurance law that an insured has the initial onus to prove, on the balance of probabilities (that is more likely than not), the loss or damage claimed falls within the terms of the policy.
Subject to the terms and conditions set out in the policy, the complainant’s building is covered for damage that occurs during the period of insurance, including accidental damage.
Accidental damage is defined in the policy as being
loss or damage caused by a sudden, unintended and unexpected event that is not the result of a deliberate act.
The term accidental is not defined in the policy. Therefore, it is appropriate to apply the normal and ordinary meaning. It is accepted insurance law that accidental means unintended and unexpected from the complainant’s point of view.
If the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it is more likely than not the exclusion or condition applies.
In this case, the insurer says the complainant has made a valid claim for storm damage.
However, it says its liability is limited because:
there are defects at the property,
the damage was caused by gradual deterioration, or
the complainant failed to keep the property in a good condition.
The insurer says there was existing damage at the property
The insurer does not dispute the insured property has suffered damage because of the storm event on 7 January 2022. After the claim was lodged it had several experts attend the property to comment on the cause and extent of damage.
KB (builder) attended the property on 29 January 2022 and prepared a report that said:
heavy rain pulled the gutter down at the property which hit the verandah and allowed water to soak into the downstairs
the bedroom has been constructed under a deck which is not watertight
the gutters were full of leaf debris and were rusty
the roof sheets on the left side of the roof are falling backwards rendering it non-compliant on account of the pitch.
AT (flooring) attended on 11 May 2022 and noted the timber floors had suffered water damage and staining and needed to be replaced once the moisture ingress had been fixed.
The insurer wrote to the complainant on 7 July 2022 stating that the property had a number of existing defects, faults or damage at the property which required rectification, as follows:
pergola roof to be re-pitched to a minimum of 1 degree,
re-design of area/drainage system to occur, increasing the size of the gutter (with overflow prevention), and
replace left side of roof.
The complainant seemed to accept that there was some existing damage at the property and arranged for the left side of the roof to be replaced. This occurred before 11 October 2022. The insurer said that it could still not proceed with the works following the roof replacement.
BB (builder) then inspected the property and prepared a report dated 8 March 2023 that said:
he recommends gutter guards be installed to help with leaf debris
agrees with findings from AT that the full floor downstairs needs to be replaced
considers there are maintenance issues related to the event but the complainant would not have been aware of them prior to the event.
indicates there are building defects and maintenance the complainant needs to attend to:
> the rear pergola area subfloor is not waterproofed and so the downstairs area is susceptible to water leaks
> no external waterproof membrane has been installed to the retained area of the external walls which allows seepage
> the external ground is within 50mm of the internal floor level which is not complaint. It must be 150mm above ground level. The floor would be susceptible to external moisture
> the downstairs ceiling height is 2.1m which is a non-complaint habitable area. It needs to be at least 2.4m.
The insurer then wrote to the complainant on 11 July 2023, indicating that she needed to rectify the following:
replace covered area decking with a waterproofed flooring system,
repair/replace the box gutters to obtain appropriate falls and compliance,
install waterproof roofing to the stairwell ceiling,
install subfloor retaining wall or restore an appropriate stable soil batter with drainage,
ensure compliant ground clearance to the slab edge/framing particularly in sub floor, and
install damp proofing around stumps prior to reinstating plasterboard
The insurer determined that until the maintenance issues were rectified, it could not warrant the repairs and sought to cash settle the complainant as follows:
BB quote dated 11 April 2023 for building works for $36,962.23 (including GST),
SG quote for electrical works dated 27 September 2024 for $4,774.59 (including GST).
I understand the complainant was cash settled $41,736.82 in February 2024.
The complainant says the cash settlement is insufficient
The complainant says the cash settlement is insufficient.
The complainant obtained an expert report from BL (builder) dated 30 June 2023 that said he considers the cash settlement offered by the insurer is insufficient for the complainant to repair the damage caused by the storm. He says in his report:
The insurer appears to have ignored the costings for remediation of the property which must be completed prior to any repair works commencing.
The BB quote dated 11/04/23 does not cover the full scope of the repair works required to bring these areas to a suitable standard.
We have included the full scope in our costings which includes the following: Full insulation removal & replacement, full plaster removal & replacement, full flooring removal & replacement and complete renovation of bathroom due to water damage from above which has compromised the water-proofing & tiling.
He provided a quote dated 11 July 2023 for $245,475.59, including a builder’s margin and GST.
The quote includes:
site establishment, furniture removal and replacement
demolition of all walls, ceilings and flooring in the downstairs area
waste removal and cleaning
repairs to the roofing and guttering, including scaffolding
electrical works (on the basis of the agreed quote from SG)
supply and installation of insulation, plastering, flooring, cabinetry, painting and a full bathroom
carpentry for the doors, architraves, skirtings and trims
project management costs.
The costings are based off the Rawlinson Construction Code Guide 2018.
During the claim process, the complainant also obtained quotes from other suppliers to repair parts of the damage, as follows:
EF (flooring) quote dated 27 September 2022 for $17,800. This quote includes removing and reinstalling the water damaged flooring from the contractor that performed the works in the renovation,
GA (bathroom) for a full bathroom replacement for $48,868
AJ dated 17 May 2023 for $47,231.46 for mould remediation works, which would take place before the building works could be commenced, if repairs were to be undertaken.
The complainant disputes that there is maintenance required at the property to the extent that the insurer alleges. Despite it having no bearing on the current damage, the complainant replaced the left-hand side of the roof because it was aged. She has also engaged a contractor to undertake drainage behind the downstairs retaining wall. In response to the insurer’s allegation that a moisture barrier has not been installed under the flooring downstairs, the complainant has provided an email from EF, the contractor who installed the flooring, to confirm a barrier is in place. EF also offered to cut a hole in the flooring so the insurer could observe the barrier in place.
The complainant has provided photographs showing continual damage at the property because the gutter has remained broken. She has placed buckets underneath the pergola roof, provided photographs of the ceiling sagging in the downstairs area and wet insulation coming through the downstairs ceiling containing black mould.
The complainant has also provided an expert report from AJ, who were used by the insurer’s first expert, KB. AJ conducted moisture testing of the downstairs area and confirmed that the entire area had increased moisture readings. AJ confirmed that the mould at the property is category 3, class 3 and is hazardous to human health. The complainant has remained living in the house this entire time.
The insurer’s assessment of its liability is unreasonable
In my view, the insurer’s assessment of its liability is unreasonable.
It is not in dispute the complainant has made a valid claim. The parties agree that the gutter broke off the property in a storm and water has then flowed inside the property damaging the downstairs area. The insurer does not dispute that it is liable for damage to the gutter and the internal resultant damage.
I do not accept that the insurer has conducted an effective make safe. The gutter at the property has not been repaired, some two and a half years after the storm. The complainant has also supplied photographs showing that another part of the gutter has been secured by her with string holding the gutter up in place.
The claim notes state that on 18 February 2023, the complainant’s claim had still not been resolved and she contacted the insurer reporting that the gutter had still not been repaired and water continued to be directed into the house.
In addition to the lack of external repairs, there have been minimal remediation works conducted inside the downstairs area of the property. The complainant has supplied photographs of the ceiling caving in and insulation containing black mould coming out of it. The complainant has provided a report from AJ that indicates the mould at the property is hazardous to the health of people living at the property. The insurer has not provided any report to refute this.
The available information supports that there is extensive damage to the downstairs area which had recently been renovated prior to the storm. In my view, the complainant’s quote from BL reflects an actionable cost for her to repair the damage. This is because I accept that the entire downstairs area needs to be stripped out and replaced given the damage and the fact that it has been left in its current state for two and a half years.
BL’s quote is detailed and in many instances is less than comparable quotes provided by the complainant for similar works – for example, BL allows $15,000 for bathroom replacement compared to the quote from GA for $48,868. Many of the items are similar to those provided in the insurer’s quote, but the insurer has not allowed for a strip out and rebuild or any mould remediation.
The insurer’s quote from BB is incomplete. It does not provide any amount for mould remediation, replacing the bathroom, or project management costs.
It is not in dispute that the damage was caused by a gutter that broke off and directed water inside the house into the ceiling cavity. I do not accept that any of the alleged defects the insurer has referred to have caused or contributed to the loss in this case which would allow the insurer to limit its liability. In addition, the defects referred to by the insurer’s builders are unsubstantiated – there are no references to Australian standards, if those standards were in place at the time of construction or any adequate reasoning as to how the alleged defects impact the ability to conduct repairs. The insurer has also made erroneous statements which are unsubstantiated. For example, that the timber flooring did not have a waterproof membrane in place when the complainant provided an email from the flooring contractor confirming it did.
I also do not agree with the insurer’s assertion that the complainant has failed to keep the property maintained. The photographs show an immaculate property that had recently been renovated using high end finishes before it was inundated with water.
Taking all of the above into consideration, I accept the complainant’s quote is reflective of the actual cost to repair the damage and the insurer should pay this amount. This is especially so in circumstances where the property has been left, damaged, for two and a half years which has likely exacerbated the damage that occurred during the storm and the mould.
Is the complainant entitled to compensation?
No. The insurer waived the complainant’s $5,000 excess in March 2023. Since that time, I consider both parties have contributed to any further delays and the complainant has been adequately compensated.
AFCA can award compensation for non-financial loss
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay, or interference. AFCA takes a conservative approach when considering any award of compensation.
The complainant says the insurer has mismanaged the claim
The complainant says the insurer has mismanaged the claim. She says:
the insurer or its trades had to attend the property 22 times
she purchased the property in 2021, renovated it and then a week later the storm occurred.
she has not been able to use her property for almost three years because the damage has still not been repaired and the high concentration of mould present
this is the second complaint she has had to file at AFCA to progress the matter
she owns a small business and has had to take time off work to deal with the claim which has been ongoing for a long time.
No further compensation is payable
As part of an earlier AFCA complaint, the insurer acknowledged the delays it had caused and waived the complainant’s $5,000 excess.
I have reviewed the claim notes provided by the insurer. After 27 March 2023, there were further delays that were caused by both parties – for example, on some dates the complainant was not available when trades were able to attend because she was working. This is something to expect as part of a normal claims process. At other times, the insurer took too long to arrange trades.
I consider the claim process has been frustrating for the complainant because it appears that the insurer has continued to limit its liability. The complainant also made reasonable requests to be responded to by the insurer in writing and to have advanced notice of the tradespeople attending because she had some concerns for her safety. These were not appropriately actioned making the complainant undoubtedly stressed and frustrated.
However, having considered all the information, I accept the insurer’s offer to the waive the $5,000 excess is fair and reasonable considering the circumstances. That amount is more than I would likely award given the limit that applies to non-financial loss compensation claims at AFCA. No further compensation is warranted.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.