Partial decline of storm and flood damage to business premises; 200mm inundation cover
Text of the determination
Determination
|
Case number
|
12-00-1005662
|
Financial firm
|
AAI Limited
Case number: 12-00-1005662 12 July 2024
Determination overview
Complaint
The complainant is a company which holds a business insurance policy underwritten by the financial firm (insurer). On 14 November 2022, the complainant lodged a claim for damage to the business premises following a storm and flood event.
The insurer accepted some damage was caused by stormwater run-off, which preceded the arrival of floodwater. The policy does not cover flood damage. The insurer offered to conduct further investigation of the loss at the premises to ascertain what it would cover, however the complainant refused.
The complainant disagrees with the insurer’s decision. It says all the damage was caused by stormwater inundation before the arrival of floodwater. It seeks a settlement of $403,096.11.
Issues and key findings
Is the insurer entitled to partially decline the claim?
Yes. On balance, the loss was caused by a flood, which the policy excludes. As the insurer offered to cover up to 200mm of inundation damage, the panel accepts this is fair. The parties must work together to ascertain a settlement for this damage, as detailed in section 2 of this determination.
Why is the outcome fair?
The insured building was inundated by water and sustained accidental damage on or about the early hours of 14 November 2022. On balance, this water entry was caused by the flooding of the nearby Molong Creek. As this is excluded by the policy, the insurer is not liable for it. However, the insurer’s offer to cover 200mm of inundation is fair.
Determination
This determination is substantially in favour of the insurer.
The insurer is required to indemnify the complainant for up to 200mm of water inundation into the insured building. How this is to be settled is detailed in section 2 of this determination.
Reasons for determination
The complainant is represented by KO. For simplicity, in this determination the panel will refer to both as the ‘complainant’, unless context requires otherwise.
Is the insurer entitled to partially decline the claim?
Yes. On balance, the loss was caused by a flood, which the policy excludes. As the insurer offered to cover up to 200mm of inundation damage, the panel accepts this is fair. The parties must work together to ascertain a settlement for this damage, as detailed below.
Complainant says business premises damaged by stormwater inundation
There is no dispute the complainant’s retail business premises was inundated by water on or about 13 November 2022. There is further no dispute the wider area was subject to flooding.
The policy does not provide cover for flood damage.
At the time of the loss, the complainant had owned the building for many years. It is accepted the building and the general area had been subject to previous flooding events. In this instance, the complainant says the initial and substantive inundation of the property was by stormwater run-off after heavy rainfall on the date of the loss.
Whilst the insurer acknowledges there was stormwater run-off and this may have entered the insured building, it considers any inundation was limited to no more than 200mm. The insurer agreed to cover this level of damage, although it is yet to inspect and ascertain the cost value of this damage.
The insurer says the balance of the damage was caused by overland flooding from the nearby Molong Creek. It says it is not liable to cover any flood damage.
The complainant seeks cover for repairs and costs, estimated at $403,096.11.
Policy covers accidental loss or damage, but not flooding
The terms of the policy include the Policy Schedule and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers accidental loss or damage to the insured property during the period of insurance. Whilst not specifically defined in the policy, the panel accepts an ‘accidental’ event is something that is unintended and unexpected.
The policy also covers event-based damage, including:
Storm, wind, rainwater, cyclones or tornadoes, snow or sleet, hail and run-off rainwater
Given there was water damage to the insured building on or about the date of the event, the panel accepts the complainant suffered a claimable loss. The event was unintended and unexpected.
This means the onus turns to the insurer to show why the loss is not covered by the policy.
The insurer notes the policy does not cover loss or damage caused by flood, unless optional flood cover is selected and purchased. There is no dispute the complainant did not select this option. Therefore, to the extent any damage to the building was caused by flooding, the panel accepts the policy will not respond.
The policy defines flood as:
The covering of normally dry land by water that has escaped or been released from the normal confines of any of the following:
▼ a lake (whether or not it has been altered or modified);
▼ a river (whether or not it has been altered or modified);
▼ a creek (whether or not it has been altered or modified);
▼ another natural watercourse (whether or not it has been altered or modified);
▼ a reservoir;
▼ a canal; or
▼ a dam.
Insurer’s hydrologist says stormwater run-off damage was unlikely
The insurer obtained an expert report dated 31 January 2023 from hydrologist WM. This report was based on a site inspection on 13 December 2022. WM found:
the specific time of initial inundation was not known
peak depth was approximately ‘4 to 5 feet deep’ in the building
the building is approximately 220m west of Molong Creek
the local rainfall gauge (approximately 400m from the property), recorded a peak rainfall intensity of 41mm/hr between 10.00pm and 11.00pm on 13 November 2022
the closest stream gauge was at Molong Creek. As it was a manual gauge, no data was available for assessment
the Molong DS Borenore FW gauge, located about 11 km from the town, is the closest automatic gauge. This confirmed Molong Creek peaked three times throughout October and November 2022, with the highest peak of 4.346m recorded on 14 November 2022 at 1.15am. Creek levels rose and fell within a few hours
flood mapping shows that the building is located within the 1% Annual Exceedance Probability (AEP) designed flood extent
the complainant says stormwater culverts with flap valves were installed by the local council near the building following the 2005 flood event to prevent water from Molong Creek backing up the stormwater network. However, this did not assist in this event
whilst short-duration rainfall intensities were high, the timing and intensity of this rainfall do not show the building was inundated by stormwater run-off
WM estimates the flood peak was a few hours after the gauge peak at the Molong DS Borenore FW gauge at 1.15am on 14 November 2022 – only 2mm of rain was recorded at the Molong Post Office gauge after 2.00am
a photograph of a surcharging stormwater pit within Molong taken at 1.24am on 14 November 2022 was about 2.5 hours after the peak local rainfall intensity was recorded
the surrounding area was already subject to significant inundation, therefore, the photograph does not show stormwater inundation was likely within the insured building.
Complainant’s engineer says damage due to stormwater inundation
The complainant says the event was somewhere between a 1:200-year event and a 1:500-year event, noting the rainfall was extremely rare and extreme. It considers there are numerous errors in WM’s report, including geographical and factual errors. It retained retired civil engineer DE to review the cause of the loss.
Amongst his qualifications, DE notes he had considerable expertise in local council and flood and storm-related matters. DE notes there were heavy bursts of rainfall through 13 and 14 November 2022 and questions the insurer’s reliance on data from the Molong DS Borenore FW gauge. This was about 11km from the town centre.
To the extent that it should be relied upon, DE says any water flow from this source takes about two hours to move into the town. Given this gauge reached a flood peak at 1.15am on 14 November 2022, DE says any flow-on effect at Molong would not have occurred until about 3.15am. By inference, DE considers any water entry into the building prior to this time must be by stormwater.
CCTV footage does not assist in determining cause of inundation
A copy of CCTV footage of the flood was provided to the panel.
The complainant says this shows stormwater run-off ingress was obvious and apparent at about 1.00am on 14 November 2022. It says water rose to a depth of about 600mm within the property. The insurer reviewed this footage and said it shows stormwater inundation might account for up to 100mm of inundation. It offered to cover up to 200mm of inundation as a result. The complainant did not accept this offer.
The complainant says at approximately 1.00am on 14 November 2022:
it can be seen that clear water enters the [building] to an approximate depth of say 600mm(2 foot)… Prior to the windows shattering and the deluge that occurs in poor video light when the windows break shows an approximate depth of 1.2m (4 foot)… As the [building] was sandbagged to an approximate height of say 700mm the water entering... was slow till it reached the height of the sandbags resulting in increased volumes of stormwater entering… until the windows broke.
The footage appeared to be taken from a mobile phone directed at a TV camera. It is not of high quality. It is difficult to ascertain anything specific about the cause of the loss. The footage appears to show water entry into a building (which is presumably the insured building), from two different angles. The footage was sped up and not of sufficient quality to determine the cause or specific time of inundation.
Whilst the panel acknowledges water entered the insured building, there is no persuasive evidence in the footage it was due to stormwater run-off. There is no dispute there was capacity for both stormwater run-off and flooding in the local area.
Witness evidence describes water inundation of the town
The complainant also obtained witness statements about the loss. DW from the SES noted on the evening of 13 November 2022 there was ‘extreme rainfall’ after 10.00pm for about an hour. This accords with WM’s findings. By 11.00pm, DW says Molong Creek had gone from less than a metre earlier that evening to 3.7m. He says the creek ‘breaks its banks’ at 4m.
DW says there was a ‘second burst of extreme rainfall’ just prior to midnight. Water levels in the street where the insured building was rose sharply until about 1.00am on 14 November 2022, before receding ‘substantially’. DW reports CCTV footage shows ‘water levels exceeding a metre’ coming out the windows of the insured building. He believes Molong Creek broke its banks about 2.00am or 3.00am on 14 November 2022, rising to up to 5m.
Another witness, fire and rescue worker LP, wrote that a local shop (two doors down from the insured building) had waters ‘in excess of one metre’ at 1am on 14 November 2022.
The director of the complainant’s business gave evidence to a flood enquiry regarding the events on 7 May 2024. He noted the area had flooded previously in 1990 (twice), 2005, 2010, 2021 and 2022. He said:
There were, in essence, two high-water events: one around 1 am, when surging stormwater inundated the [town] and the residences, and one just after 3 am, when the creek broke its banks and overflowed.
Experts provided additional reports and disagreed on the cause
The experts engaged in written discourse, with opposing views about the cause of inundation. On 31 October 2023. WM wrote it conducted further analysis of flood modelling based on the complainant’s further information to ascertain how the building was inundated.
WM remained of the view that water in the streets and the building at around 1.00am on 14 November 2022 was floodwater. Whilst it agreed with DE that ‘storms moving southeast [were] producing rare short duration rainfall’, it says this effectively ceased after 11.00pm on 13 November 2022.
The southeast path of the storms meant the rising levels of Molong Creek would have increased. In turn, this means the flood peak at Molong ‘would occur much faster’ than the town had previously experienced. Even on a ‘worst-case scenario’ where the stormwater pits and pipes are excluded from consideration, WM says stormwater inundation into the building would have been minimal. It says this would not have exceeded 0.18m (180mm).
Based on this, the insurer agreed to cover up to 200mm water damage in the building.
DE acknowledged the flood modelling relied upon by the insurer can provide ‘stable and accurate’ modelling, if used properly. DE questioned whether the flood modelling concept was properly applied and whether the result properly or accurately reflects the outcome.
WM maintained the flood modelling was accurate.
DE wrote that intense bursts of rainfall continued after 11.00pm on 13 November 2022 and this would have added to the depths of the stormwater flow. says ‘additional meaningful rainfall continued’ until at least 12.30am on 14 November 2022. DE considered the insurer’s flood modelling did ‘not adequately address the actual site conditions’ in Molong.
Complainant obtained report from second expert regarding the event
The complainant obtained a further expert report, this time from engineer/hydrologist SM. Dated 4 April 2024, SM’s report revealed:
the town experienced 94mm of rain in the 24 hours to 9.00am on 14 November 2022
most of this rain fell in the three-hour period between 10.00pm on 13 November and 1.00am on 14 November 2022
the three-hour period of rain ‘exceeded a 1 in 200 year event’
this included 58mm in the 1.5 hours to 11.30pm and rainfall of 15mm/hr until 12.45am
20mm fell in the hour to 12.30am, including 15mm in 30 minutes
the post office recorded 78mm of rain between 10.00pm on 13 November and 1.00am, on 14 November 2022
the rainfall in these 2.5 hours was between a 1 in 200 and 1 in 500 year event
the peak rainfall intensity was 56mm/hr over a 30 minute period
rain effectively ceased about 12.30am on 14 November 2022
SM was informed the local creek breaks its banks at 4m
the water level in Molong Creek increased from about 10.00pm on 13 November 2022, with the most rapid increase between 11.00pm and midnight
it reached a peak of 4.35m at 1.15am on 14 November 2022
there was ‘sufficient intensity and depth of rainfall’ to generate stormwater run-off between 10.00pm on 13 November and 1.00am on 14 November 2022 and this ‘would have caused inundation of properties at a number of locations in the township’
up until 1.00am ‘it is expected that rising water levels in the creek would have reduced the potential for flows from the township to discharge into the creek’
despite this, SM does not consider any backflows or overtopping of the creek banks occurred until after this time.
SM concluded:
Up until approximately 1am it is expected that rising water levels in the creek would have reduced the potential for flows from the township to discharge into the creek and exacerbated ponding in the township itself, but it is not expected that any backflow or overtopping of the creek banks would have occurred until after this time. The inundation described above is therefore considered to be fully attributable to overland flow generated from the local catchment.
Insurer’s hydrologist maintained its view as to cause of damage
In response to SM’s report, WM provided a final submission dated 2 May 2024. WM remained of the view the building was flooded and not subject to stormwater ingress. It says that SM:
did not conduct a site visit
used a flood site model it does not agree with
adopts the belief that water from the DS Boremore Creek gauge would take two hours to travel to Molong, which SM does not agree with.
WM refers to a SES flood preparedness brochure for the local area from 2007. It identifies the town is in danger when the local bridge gauge gets to 3.25m and floodwater can enter properties at 3.3m. DW’s evidence was that the gauge was at 3.7m at about 11.00pm on 13 November 2022. This implies flooding was already in progress at this point.
WM says LP’s evidence of water being 1m deep outside the local pharmacy at 1.00am on 14 November 2022 is consistent with floodwater, not stormwater. Peak rainfall occurred about two hours prior to this.
Information does not show stormwater runoff was the sole cause of damage
There is no dispute the peak period of rainfall intensity (41mm/hr) occurred in the hour to 11.00pm on 13 November 2022.
The panel acknowledges the complainant’s view that ‘intense rainfall bursts’ continued after this period. This rain remained strong and impactful. However, it also coincided with the water levels in the Molong Creek exceeding 3.7m, at which point the panel accepts it was in flood.
Once rainfall on the ground mixes with floodwater, the courts accept all this water is a flood.
Therefore, whilst rain continued after 11.00pm on 13 November 2022, it:
was no longer at its peak intensity, gradually lessening until all but ceasing at 2.00am the next morning, and
this rain (at some point) mixed with floodwater from the nearby Molong Creek, which was in flood.
It is not unreasonable to expect the maximum likelihood of stormwater run-off would occur in the immediate aftermath of the peak period of rainfall intensity (which ended at 11.00pm). The panel accepts this would likely not extend beyond more than about half an hour. The parties accept rainfall lessened after this time and this is confirmed by the rain figures. Without continued intense rainfall, the likelihood of stormwater run-off inundation lessened.
Furthermore, stormwater run-off inundation is typically not extensive. Whilst the complainant believes stormwater run-off accounts for the total inundation of the building, the panel considers this is not likely. Such inundation is typically modest and well short of the levels claimed. More to the point, there is clearer evidence of flood inundation, whereas the possibility of stormwater run-off is limited.
The value of the evidence regarding the water levels from Molong DS Boremore Creek gauge is unclear. The panel acknowledges the possibility water from this area may travel to the local township in Molong, although this is not necessarily the case. It may be that the inundation of Molong occurred differently or independently from a gauge reading 11km away. It is difficult to dry any meaningful evidence from this.
Given these factors, the panel considers the mooted offer to cover 200mm of stormwater inundation is fair. The evidence that there was any more inundation within the premises is not strong. The panel accepts a flood occurred and floodwater entered the building. Any damage caused by this entry is not covered by the policy.
Whilst the exact time of inundation is not known, it is believed to have been about 1.00am on 14 November 2022. On balance, the panel accepts this was likely caused by flooding of the Molong Creek.
Fair that the insurer covers the complainant for 200mm inundation
The panel cannot rule out that some stormwater run-off pooled in and around the streets. The rain was intense and it is possible it was unable to effectively disperse in the immediate aftermath of the most intense rain period prior to 11.00pm on 13 November 2022.
That rain continued over periods after this time is not in dispute. The insurer concedes water ingress from stormwater run-off was possible.
Noting the insurer relies on a policy exclusion to deny the claim, the onus rests with it to prove the loss was caused by a flood.
Given the differing views and the insurer’s concession, the panel considers it is fair that the insurer indemnifies the complainant for the initial inundation of water up to a depth of 200mm. Any inundation above this level is, on balance, due to a combination of stormwater run-off and flooding (which is classified as a flood) and excluded by the policy.
Insurer to inspect and determine the extent of flood damage caused
Coverage for up to 200mm damage within the insured building will be significant. The panel is satisfied this includes all damage to:
floor coverings and skirting
anything underneath the floor coverings (including the concrete slab, if appropriate)
walls up to 200mm – if these require replacement, the insurer will be responsible for this in its entirety
any other parts of the building impacted up to a depth of 200mm
any covered contents items impacted up to a depth of 200mm.
The complainant will need to accommodate the insurer’s expert(s) in permitting inspection of the building, to ascertain the level of cover. The panel reminds the parties of their mutual duty of utmost good faith in attending to the assessment and possible repair of the damage.
Once the insurer has ascertained a fair estimate to repair the damage, it may:
attend to the repairs, as necessary, or
pay the cost to repair the damage.
Assuming this work has not already been done by the complainant, the choice for how to resolve the matter will be at the insurer’s discretion.
Any quote relied upon by the insurer must be based on an actionable quote. An actionable quote is a quote from a repairer the complainant can engage directly to complete the repairs for the quoted price, independent of the insurer.
Should the insurer opt to cash settle the claim based on actionable quotes, it must also include a 20% contingencies uplift. This will compensate the complainant for the transfer of risk and the loss of the lifetime repair guarantee.
Alternatively, if the complainant has already undertaken the work, the insurer must cash settle based on the reasonable amounts paid bearing in mind the limits of the settlement (200mm).
As detailed earlier, any replacement of the walls will be total, if they were damaged at the base. The parties are required to work cooperatively to ascertain a fair settlement figure, based on the limit imposed by this decision.
Why is the outcome fair?
The insured building was inundated by water and sustained accidental damage on or about the early hours of 14 November 2022. On balance, this water entry was caused by the flooding of the nearby Molong Creek. As this is excluded by the policy, the insurer is not liable for it. However, the insurer’s offer to cover 200mm of inundation is fair.
Supporting information
The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.