Case number: 1002968 6 June 2024
Determination overview
Complaint
This complaint relates to three separate claims lodged by the complainants on their Home and contents policy held with the financial firm (insurer).
Claim one (C1) was lodged for an escape of liquid which occurred on 13 October 2022. The insurer denied this claim as the policy does not cover leaks from leaking shower screens.
Claim two (C2) was lodged for storm damage said to have occurred on 13 October 2023. The insurer accepted water ingress damage to bedroom 5 only. The insurer initially accepted movement damage to a concrete strip, but later overturned its decision saying it was from a building defect. It denied the further claimed damage occurred due to a storm.
Claim three (C3) is for damage caused by an earthquake on 28 April 2023. The insured denied the claim saying it was caused by general ground movement.
The complainants dispute the denials and have submitted a quotation for $55,759 to repair damage she says is related to all three claims.
Issues and key findings
Is the insurer’s denial of claim one fair?
Yes, the damage was caused by a leaking shower screen and is excluded under the terms of the policy.
Is the insurer entitled to limit its cover for claim two to bedroom 5?
No. The insurer is to increase its offer to $9,327.79 to cover damage to the concrete strip and bedroom 5 including a contingency as to set out in section 2.2.
Is the insurer’s denial of claim 3 fair?
Yes. The damage was most likely caused by ground movement which is excluded from cover under the terms of the policy.
Are the complainants entitled to compensation for non-financial loss?
Yes, the insurer is to pay the complainants $2,000 compensation for non-financial loss.
Determination
This determination is partially in favour of the complainants. Within 14 days of receiving notice of the complainants accepting the determination the insurer is to:
pay the complainants $9,327.79 less any applicable excess as full and final settlement of the claims.
pay the complainants $2,000 compensation for non-financial loss.
The insurer is otherwise entitled to deny the balance of the complainants claim.
Reasons for determination
Is the insurer’s denial of claim one fair?
Yes, the panel is satisfied the damage was caused by a leaking shower screen and is excluded under the terms of the policy.
Complainant has the onus to establish a valid claim
When making a claim, the complainant has the onus of establishing, on the balance of probabilities (i.e. that it is more likely than not), that they suffered a loss which is covered by her insurance policy.
If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of probabilities, the application of any condition or exclusion it relies on to reduce its liability.
The cover provided by the policy is set out in the product disclosure statement (PDS) and the certificate of insurance. There is no dispute the complainant received these documents.
The complainant’s Home and Contents Platinum cover policy is an insured events policy that provides cover for a series of insured events including storm, earthquake and escape of liquids. Accidental loss and damage cover is also provided in limited circumstances but not if the loss or damage is under an insured event
Policy provides cover for escape of liquid subject to exclusions
The insured event for claim 1 is escape of liquid.
Under the insured event escape of liquid, the policy provides cover for loss or damage caused by liquid leaking, overflowing or busting from the following relevant areas:
any drain, fixed pipes, drainage and sewage systems (not forming part of a
shower cubicle wall, door or base);
baths, sinks, toilets and basins (but not showers);
Under the insured event the policy excludes:
loss or damage to, or caused by, a leaking shower floor or base, leaking shower cubicle walls, leaking shower glass screening or doors, leaking open shower floor areas or other wet areas;
Available information indicates damage caused by leaking shower recess
The available information does not support a valid claim for escape of liquid to bathroom or ensuite has been established.
The complainant referred to a leak which was repaired to the bathroom around December 2021, which she says allowed the moisture to occur to the lounge carpet. However, the complainant has not substantiated what was repaired or if the issue was repaired why it is still affected by moisture.
The insurer’s builder (AR) identified the following damage:
Bathroom
slight mildew growth on bathroom ceiling.
Paint peeling and separation observed.
No moisture detected in ceilings or walls.
Possible ventilation issue.
Ensuite
Elevated moisture levels within the plaster wall linings at the base of wall
Slightly elevated moisture levels within floor tiles in corner, near the shower screen.
Elevated moisture levels within the skirting board underneath the window, with mould present and swelling.
Elevated moisture levels within plaster ceiling lining, above the tiled shower walls, where paint separation has occurred.
Possible water escape from shower base within ensuite.
AR completed a leak detection and reported on the cause of damage, saying:
Visual inspection of the affected areas identified mould within the en-suite bathroom along the skirting this is due to deteriorated shower screen juncture seals allowing water egress to affected area.
The affected area within main bathroom includes skirting that has delaminated from the wall on the adjacent wall. Water egress was located from both the shower screen junctures with the left-hand side presenting behind the tiling.
Spray testing, simulating normal use, with concurrent thermal observation verified water egress emanating from the shower screen junctures.
Leak detection investigation has determined the cause of damage to the affected area to be the result of deteriorated shower screen junctures seals that have allowed water regress from the shower when in use.
The complainant’s quotation from (IB) says:
bathroom repair works due to existing waterproofing failure. Damage has been assessed as needing to be gutted to the entirety of the room apart from ceiling. Waterproofing has failed causing severe damage to both walls and floor
The complainant’s builder (HR) mentioned water damage to the bathroom however does not confirm the cause.
The panel is persuaded by AR’s report which shows the proximate cause of the water damage to the bathroom and ensuite to be due to leaks coming from the shower screens. As the policy does not cover leaks from showers the insurer was correct in denying this claimed damage.
The other issues identified to the bathroom have not been caused by a claimed event but have occurred gradually due to the failed water proof membrane and poor ventilation which the policy excludes.
The panel is satisfied the damage was caused by a leaking shower screen and is excluded under the terms of the policy. The insurer is entitled to deny liability for claim one.
Is the insurer entitled to limit its cover for claim two to bedroom 5?
No. The insurer is to increase its offer to $9,327.79 to cover damage to the concrete strip and bedroom 5 including a contingency as to set out in this section.
Claim 2 is a claim for storm related damage
The insured event for Claim 2 is storm. Storm is defined to mean a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust.
Under the insured event the policy excludes:
loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion, structural fault or design fault;
Insurer accepts damage to bedroom 5
The insurer accepts water ingress damage to bedroom five only, due to the claimed storm damage as set out in its builder (PP)’s scope of works dated 9 March 2023.
PP says there is only evidence of water damage to bedroom five. PP says the issues to the lounge ceiling were reported to be minor cracking with no evidence of water ingress.
The insurer’s roof plumber (SP) says wind driven rain entered the property during the storm, notably above bedroom five only. SP recommended installing storm seal strips between the roof sheets back into the bedroom to avoid this issue in the future. SP reported the rest of the roof appears water tight.
The panel considers SP’s report shows there was no storm related damage to the roof and the evidence does not support the bathroom or lounge room ceilings were affected by water ingress from a storm.
The complainant’s builder HR says the carpet within the lounge room corner was damp at time of inspection with cracked skirting boards and plaster near the damp carpet. The report does not explain how water entered the lounge. The panel notes this area does not directly relate to the concrete strip which moved.
HR also refers to the damage to bedroom four, which the panel understands is referring to bedroom five as per the other reports. HR reported on daylight gaps in the roof, which is in line with SP’s recommendation to install storm strips.
Insurer can limit liability for internal damage to bedroom 5
The panel accepts based on the available information that the insurer is entitled to limit its liability for any internal damage caused by the storm, to bedroom 5. The panel considers it fair that the insurer settles the claim based on PP’s scope of works.
PP scope of works assessed the cost of repairs at $3,549.16. The panel considers that an allowance of 20% or $709.83 for contingencies should be added to the scope of works bringing the cash settlement to $4,258.99. The insurer may deduct any applicable excess from the final settlement amount.
Insurer also liable for damage to concrete weather strip
The insurer initially accepted liability for damage to an external concrete weather strip based on its engineers (MCS)’s findings. MCS considered the primary cause of the partially collapsed concrete strip on the front north-west corner of the property to be due to erosion and subsequent undermining of the subbase layer due to the significant storm in October 2022.
PP later provided a report which questioned the engineer’s findings. PP relied on google images to argue the step down was present as early as 2010 and was likely built this way in 2004. Further, PP notes there are no level changes from the entry gate to the rear yard or cracking to control joints which it says indicate recent movement has not occurred.
In reviewing the evidence, the panel notes the google images provided are blurred. The images do not clearly show any movement in the concrete strip in 2010 or later in 2014.
MCS was asked to review its findings given the report from PP. In a further report dated 3 July 2023, MCS confirmed conducting a secondary review of the site and concentrating on the collapsed concrete strip. MCS confirmed its earlier findings and considered the primary source of the issue was attributed to the erosion and subsequent undermining of the subbase layer, followed by a compromise in the foundational strength due to a notable flooding event.
Further analysis by MCS revealed that the identified fault was not present originally, as illustrated by the condition of the separation joint. This suggests that the fault has manifested subsequently and was not an inherent structural defect. The issue appeared to be localised and does not affect the entire concrete strip
The insurer had its internal assessor review the reports. The panel notes the assessor appears to have relied largely on the blurred google images to determine the damage was pre-existing. The structural engineer MCS found there was no inherent structural defect.
The panel finds the reports from MCS to be more persuasive and considers it fair that the insurer is liable to repair the concrete strip.
Insurer to cash settle claim for concrete strip
The complainant has provided a quote for repairs from IB for various repairs. Included in the quote is a quote for repair of the concrete strip using structural polyurethane lifting foam for $4,224.
No other quotes for repair of the concrete strip have been provided. To finalise this aspect of the complaint the panel considers it fair to rely on the quote from IB with a further 20% ($844.80) contingency allowance bringing the cash settlement to $5,068.80.
Insurer to cash settle claim 2
In summary the insurer’s liability extends to the damage identified to bedroom five and the concrete strip., as:
there is no sign of water entry into the lounge room and the cracking damage likely occurred due to general movement which the policy excludes.
the bathroom water damage cannot be attributed to by the storm, rather it has occurred from a lack of ventilation, gradually over time which the policy excludes.
there is no evidence the roof was damaged by a storm, rather the roof requires upgrading to avoid wind driven rain entering.
The panel determines the insurer is liable to cash settle the claim for storm related damage to bedroom 5 and the concrete weather strip for a total of $9,327.79 less any applicable excess. The insurer is otherwise entitled to deny liability for the balance of the damage claimed under claim 2.
Is the insurer’s denial of claim 3 fair?
Yes. The damage was most likely caused by ground movement which is excluded from cover under the terms of the policy.
Insurer is entitled to deny claim 3
For claim 3, the relevant insured event is earthquake. The policy provides cover for loss or damage by earthquake subject to exclusions. The insurer has relied on exclusions relating to ground movement and wear, tear and gradual deterioration.
The complainant says the property suffered cracking damage caused by an earthquake on 28 May 2023. There is no dispute that there was an earthquake on 28 May 2023.
Engineer (CR) concluded:
the damage at the property has not been caused by an earthquake on 28 May 2023.
the property is located in an MMI 4.0 to 4.5 region (light shaking from earthquake);
the seismic vibrations were not sufficient to cause damage.
the damage to wall linings are consistent with long-term differential footing movement and the garage floor cracking was consistent with concrete shrinkage at the time of construction.
The complainant says CCTV footage prior to the event shows no damage present prior to the earthquake. The panel notes the photographs were attached to a word document and are not visibly clear enough to make this finding. AFCA requested the images be provided separately to better review, however this was not provided.
Based on the available information the panel is persuaded the damage to the garage was not caused by an earthquake. Rather the issues relate to the general ground movement which the policy excludes.
The insurer is entitled to deny claim 3
Is the complainant entitled to compensation for non-financial loss?
AFCA can award compensation for poor claim handling
Under the AFCA Rules, we can award up to $5,400 compensation for indirect financial loss caused by an insurer mishandling a claim.
We can also award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim.
Insurer to pay $2,000 compensation for non-financial loss
The available information shows the complainants are generally dissatisfied with the claims handling by the insurer. The complainants have referred to errors and delays in communication, notably the insurers decision to overturn its decision in relation to the concrete strip footing.
The panel considers the insurer managed the claims reasonably overall given the multitude of issues raised over the three claims, with exception for its decision to overturn the strip footing.
The panel accepts the decision to accept and then reject the claim as discussed above would have greatly affected the complainant’s peace of mind. The panel is not satisfied the internal assessor in rejecting the claim gave proper consideration to the second detailed report from MCS.
For this reason, the panel considers it fair the insurer pays the complainant $2,000 compensation for non-financial loss.
Why is the outcome fair?
While the complainants may be disappointed with the outcome of this dispute, the outcome is fair as it provides cover as per the terms of the policy. That cover is limited, and it is fair for the insurer to rely on the terms of the policy when determining liability.
The determination recognises the inconvenience caused by the insurer’s claims handing and allows for the claims to be finalised by a cash settlement including suitable contingency allowances.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience within the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.