Home / IAG / Determination 12-00-1001704

Determination 12-00-1001704

Insurer denied building movement damage after storm claim and complainant sought to set aside settlement

FirmIAG
Decided2025-01-20
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$547,642
SourceAFCA PDF

Summary

A landlord disputed the insurer's denial of foundation movement damage and sought to set aside a $34,836.26 settlement he accepted, citing misleading information and pressure. AFCA found the settlement was voluntary and the movement was not storm-caused, so no further payment was ordered.

A settlement may be set aside only for fraud, misleading conduct, duress, undue influence or unconscionable conduct, and none was established on the evidence.

Issues

Subjects and remedies

home or building damageno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1001704 | Financial firm | Insurance Australia Limited Case number: 12-00-1001704 20 January 2025 Determination overview Complaint The complainant holds a landlord insurance policy with the financial firm (the insurer). He lodged a claim saying the insured property was damaged by a storm. The insurer accepted the property had some storm damage. It assessed the cost of repairing this damage at $26,269.01. However, the property also had damage caused by building movement (foundation movement and wall cracking). The insurer said the building movement was not caused by a storm, and the movement damage was not covered under the policy. The complainant disagreed with the insurer’s decision. He said the building movement was caused by a storm. The insurer offered to settle the claim for $34,836.26. The complainant accepted the offer. The complainant says the insurer’s offer was based on misleading and incorrect information, and he accepted the offer under duress. He says the settlement agreement should be set aside, and the insurer should cover the movement damage. He has provided a quote for demolition, excavation, and construction totalling $547,641.60. Issues and key findings Should the settlement agreement be set aside? No. It would not be fair to set aside the settlement agreement, because: the complainant voluntarily accepted the insurer’s settlement offer the insurer did not engage in fraud or misleading and deceptive conduct to deceive the complainant into accepting the offer the insurer did not use duress, undue influence, or unconscionable conduct to force the complainant to accept the offer. Should the insurer increase its settlement offer? No. The evidence does not show a storm caused any damage the insurer has not agreed to pay for. Even if the settlement agreement was set aside, the complainant would not be entitled to more than the insurer offered. Why is the outcome fair? The evidence indicates the building movement occurred over many years. It was not caused by a storm, or anything else the policy provides cover for. Therefore, it was fair for the insurer to deny cover for damage caused by the building movement. Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this complaint. Reasons for determination Should the settlement agreement be set aside? No. It would not be fair to set aside the settlement agreement, because: the complainant voluntarily accepted the insurer’s settlement offer the insurer did not engage in fraud or misleading and deceptive conduct to deceive the complainant into accepting the offer the insurer did not use duress, undue influence, or unconscionable conduct to force the complainant to accept the offer. Policy covers storm and flood damage The cover provided by the policy is set out in the product disclosure statement. Relevant policy terms are quoted in section 3.2 of this determination. The policy is an ‘insured events’ policy, meaning it only covers damage caused by specific events. The insured events include storms and floods. The policy excludes cover for damage caused by certain factors, including: gradual deterioration or wear and tear. This is deterioration caused by ordinary use, and the ordinary effects of natural forces such as weather. This means the policy covers damage caused by a single storm or flood, but not damage that occurs gradually every time it rains faulty design or workmanship that the complainant knew about or should have reasonably known about ground movement. This exclusion does not apply to subsidence (downward movement) that happens immediately as a direct result of a storm or flood. Parties obtained expert reports The property was built in 1980. The complainant bought the property in 2012. The complainant’s tenant moved into the property in 2017. The complainant says the property was damaged by a storm on 3-5 July 2022. He lodged a claim for the damage on 14 November 2022. The complainant appointed a building inspector (JBI), who inspected the property on 6 February 2023. JBI’s report said: many of the brick piers supporting the home had rotated and sunk. This appears to have been caused by soil subsidence. Water marks indicated the subfloor had been flooded, and this likely caused subsidence the external front walls had ‘extensive’ step cracking. The internal floors were out of level, uneven, and bouncy. These issues could have been caused by subsidence of the piers there was hail damage to polycarbonate roof sheeting the kitchen ceiling was sagging and water-stained. There were minor cracks at wall corners and where walls met ceilings throughout the building. This damage appeared to have been caused by the ‘hail storm with torrential rain’. The complainant appointed an engineer (PCE), who inspected the property on 9 March 2023. PCE’s report said the pier movement and wall cracking was caused by: a lack of rain, leading to groundwater being used faster than it could be replenished, causing subsidence under the piers ‘the flood’ causing movement of the piers water seeping into the soil ‘during each rain event’ and elevating the piers. These conclusions appear to contradict each other. Perhaps PCE thought these factors caused different types of movement at different times, and each type of movement contributed to the damage. However, PCE’s report does not explain this. The insurer appointed an engineer (ST), who inspected the property on 12 April 2023. ST’s report said: the complainant said his tenant noticed ceiling delamination and cracking after a storm in March 2022, and noticed further ceiling delamination and wall cracking after a storm in July 2022 some internal cracks (in the living room, hallway, and kitchen) had been patched and repaired. This showed the property had a history of internal cracking before the storms in 2022 the rotated brick piers had been packed. The complainant said this was done by a previous owner. This showed the piers had a history of movement before the complainant bought the property the footing depth was about 200mm. The regulations in force when the property was built (Ordinance 71, published around the 1920s) said the footing depth should have been at least nine inches (230mm) the building was founded on reactive clay soil, which expends when it gets wet and shrinks when it dries. This meant the footings would move due to seasonal moisture variation the slope of the site directed water towards the subfloor. The subfloor was susceptible to seepage, and likely had been since the building was constructed there was a row of trees along the north side of the property, much closer than recommended by the relevant Australian Standard. The external brick levels and internal floor levels were lowest on this side of the house. This indicated the trees had removed water from the soil along the north side of the property, causing subsidence the ceiling cracking was consistent with defective construction (missing reinforcing back block, inadequate fastener spacing) and wear and tear (gradual deterioration of adhesive). ST concluded the property did not have any damage caused by a storm or flood (other than hail damage to pergola roof sheets). ST concluded the movement damage was caused by a combination of defective construction (shallow footings, inadequate drainage) and long-term issues (seasonal moisture variation, tree roots). Insurer denied cover for movement damage After reviewing the above reports, the insurer concluded the building movement damage (pier movement and wall cracking) was not caused by a single storm or flood, and was not covered under the policy. The insurer agreed to pay for the hail damage to the pergola polycarbonate roof sheets, and the water staining to internal walls and ceilings (the accepted damage). The insurer appointed a builder (WW), who provided a quote to repair the accepted damage. The quote was dated 2 May 2023 and totalled $26,269.01 (including 10% GST and 19% builder’s margin). Parties entered settlement agreement The insurer said it would cover the accepted damage, but not the movement damage. The complainant said he did not accept ST’s findings and he believed the storm had contributed to the movement damage. The insurer said it would review its decision. On 16 May 2023, the insurer sent a letter (the offer letter) to the complainant. The letter said the insurer had decided to maintain its decision. The letter quoted the policy terms and expert reports the insurer had considered when making its decision. The offer letter offered to settle the claim for $34,836.26, being: $26,269.01, WW’s quote to repair the accepted damage $6,567.25, a 25% uplift on WW’s quote $2,000, an ‘ex gratia’ payment offered to resolve the matter ‘amicably’. The offer letter said: ‘This offer is subject to your written acceptance and is made as a full and final settlement of this claim and dispute.’ The letter said the offer was open for 14 days. On 18 May 2023, the complainant emailed the insurer asking it to increase the settlement offer ‘in good faith’ to $50,000. On 19 May 2023, the insurer emailed the complainant saying it had considered his counteroffer, but decided to maintain its offer of $34,836.26. About 15 minutes later, the complainant replied: ‘I would like to accept the offer.’ On 22 May 2023, the insurer emailed the complainant a ‘Cash Settlement Fact Sheet’. The fact sheet said the insurer was paying $32,836.26 for repairs (the $2,000 ex gratia payment was paid separately). The fact sheet said: Before accepting this cash payment, you should consider obtaining independent legal or financial advice… If you wish to proceed with this cash payment you will need to call us… or email us confirming your acceptance. About 90 minutes later, the complainant replied: ‘I accept.’ The insurer made the payment. Agreement can be set aside if obtained by fraud or duress Under the AFCA Rules, a decision maker must do what they consider ‘fair in all the circumstances’ having regard to several factors, including ‘legal principles’. Accordingly, I have considered whether it would be fair to set aside the settlement agreement, and whether legal principles support setting aside the settlement agreement. In most cases, it is fair that parties to an agreement be held to that agreement. It is not fair for one party to fulfil their obligations under the agreement while the other party does not. However, it may be unfair to hold a party to an agreement if they were deceived about, or forced into. Legally, an agreement can be set aside if it was obtained by: fraud or misleading and deceptive conduct duress, undue influence, or unconscionable conduct. On 20 July 2023, the complainant lodged this AFCA complaint. He did not mention that he had entered into a settlement agreement with the insurer resolving the dispute. On 23 October 2023, the complainant said: the insurer’s settlement offer was based on misleading and incorrect information he accepted the offer because his tenant was suffering from cancer, and he was ‘under pressure to fix as much of the property as I could to make his living more comfortable’. Insurer’s offer based on expert reports The insurer’s settlement offer was based on its assessment of the expert reports available to it at the time. The following experts provided opinions on the cause of the building movement: the complainant’s building inspector (JBI), who said the building movement was caused by a storm and flooding of the subfloor the complainant’s engineer (PCE), who gave three different explanations for the building movement the insurer’s engineer (ST), who said the building movement occurred gradually and was not caused by a single storm. ST’s report was the most persuasive. It cited evidence indicating the building movement was gradual, and had been occurring since before the complainant bought the property. JBI did not cite evidence indicating the building movement was recent. PCE gave three different (and seemingly contradictory) explanations for the building movement, and did not cite evidence indicating which explanation was correct. The offer letter said the insurer considered the reports and concluded the building movement was not caused by a storm. Effectively, it agreed with ST and preferred its report to the other experts’ reports. This was reasonable, based on the information available at the time. Insurer did not engage in fraud or misleading and deceptive conduct The complainant appointed a builder (BFX) to repair the subsidence and wall cracking. BFX provided a ‘completion report’ dated 7 September 2023. The complainant said this report contradicting ST’s findings and showed the insurer’s settlement offer was based on misleading and incorrect information. BFX said there was evidence of ‘washout of the sub soil below the footing which resulted in large voids (due to adverse weather)’. BFX did not say whether this ‘adverse weather’ was a single storm or long-term weather. BFX did not say whether any other factors contributed to the subsidence and wall cracking. BFX said: ‘The footings consisted of brick and around 700-800mm of reinforced concrete strip footings, around 1000mm in total.’ This contradicts ST’s finding that the footing depth was only about 200mm. However, this was only one of several pieces of evidence ST relied on to conclude the building movement was gradual. Other evidence included the packing of the piers before the complainant bought the property, previous internal cracks that had been patched and repaired, inadequate drainage, and the row of trees along the side with the most subsidence. The complainant has not provided expert evidence to refute any of these points. The complainant has provided evidence that the footings were deeper than stated by ST. However, he has not shown ST was wrong to conclude the building movement was gradual. Even if ST’s conclusions were incorrect, this would not mean the insurer engaged in fraud or misleading and deceptive conduct. The evidence indicates the insurer was honest when it said it agreed with ST’s conclusions. The offer letter said the insurer considered the reports and concluded the building movement was not caused by a storm. I accept this was true and not misleading. The insurer did not engage in fraud or misleading and deceptive conduct. Complainant says he accepted offer under pressure The complainant says his tenant suffered from terminal cancer, and he wanted to ensure the tenant’s comfort and safety. He says bees and wasps could have passed through the cracks in the house, endangering the tenant. He says he felt pressured to start repairs as soon as possible. In April 2023, the complainant emailed the insurer saying he wanted repairs ‘fast tracked to ensure the safety of my tenant’. He said his tenant had cancer, and needed to ‘live comfortably with no risk of being exposed to nature's elements’. The complainant says he felt energetic and optimistic when he lodged the claim. However, the insurer’s refusal to accept liability for the movement damage left him feeling ‘demoralised’, ‘beaten’, ‘drained’, and ‘in a state of duress’. He says he felt he was not being heard or taken seriously. He says he ‘felt pressured to accept what little [the insurer] had on offer’. He says he ‘impulsively’ accepted the insurer’s settlement offer so he could fund emergency repairs. Insurer did not take unfair advantage I accept that the complainant felt pressured to resolve the claim and start repairs as quickly as possible. However, I do not think the insurer took unfair advantage of the pressure on the complainant. The complainant wrote and spoke to the insurer many times throughout the claim. At times, as stated in the insurer’s notes, he was annoyed, angry, and frustrated. However, he participated in the claim process by making submissions to the insurer (in writing and by phone), appointing experts to inspect his property, and negotiating a settlement agreement. He was not so pressured that he could not advocate for himself. The offer letter of 16 May 2023 clearly explained the insurer’s position, and its reasons for taking that position. The position was fair and reasonable, based on the information available at the time. The insurer did not try to deceive the complainant or pressure him into accepting an unfair offer. The offer letter of 16 May 2023 said the offer would be open for 14 days to give the complainant time to consider it. The insurer’s email of 22 May 2023 said the complainant ‘should consider obtaining independent legal or financial advice’ before accepting the offer. The complainant’s counteroffer email of 18 May 2023 said: ‘I can appreciate the work that you have done to go over this complaint. I can accept your findings to agree to disagree on some points… You have been great to work with.’ The complainant did not say he needed more information to understand the settlement offer or decide whether to accept it. He did not ask for more time to consider the offer or seek independent advice. The complainant’s acceptance of the offer appeared to be informed and voluntary. No duress, undue influence, or unconscionable conduct An agreement can be set aside if it was obtained by duress, undue influence, or unconscionable conduct. These legal concepts are closely related. They are discussed by the High Court of Australia in Thorne v Kennedy [2017] HCA 49, which says: duress exists where a party is subject to ‘threatened or actual unlawful conduct’. It may also exist where a party is subject to ‘other illegitimate or improper, yet lawful, threats’ undue influence exists where a party is so pressured that they have no free will or, at the very least, that their judgment is ‘markedly sub-standard’ unconscionable conduct exists where one party has a ‘special disadvantage’ which seriously affects their judgment, and the other party ‘unconscientiously take[s] advantage of that special disadvantage’. The complainant was not subject to unlawful, illegitimate, or improper threats. Therefore, the settlement agreement cannot be set aside for duress. The complainant was not so pressured that he had no free will, or markedly sub-standard judgment. Therefore, the settlement agreement cannot be set for undue influence. The complainant felt pressured to resolve the claim and start repairs quickly. This is not unusual: most people making insurance claims want to resolve them as quickly as possible, especially if they cannot afford to start repairs before receiving a settlement payment. I do not think the pressure on the complainant was unusual or severe enough to constitute a ‘special disadvantage’ which seriously affected his judgment. Even if it was, the insurer did not unconscientiously take advantage of this pressure. Therefore, the settlement agreement cannot be set aside for undue influence. Settlement terms were clear and unambiguous The complainant says the insurer’s settlement offer was poorly communicated. The offer letter said the insurer’s liability for the accepted damage was $26,269.01 (WW’s quote). It offered to pay $32,836.26 for the accepted damage (WW’s quote, plus a 25% uplift), plus $2,000 ex gratia. The complainant says the offer letter should have said he was entitled to reject the settlement offer and still receive $32,836.26 for the accepted damage. However, the insurer never said the complainant was entitled to receive $32,836.26. The insurer said the complainant was entitled to receive $26,269.01, but it was offering $32,836.26 to settle the claim and dispute. The complainant says the insurer should have clearly stated it was offering to pay $32,836.26 for the accepted damage and separately offering to pay $2,000 ex gratia, and he could accept one offer without accepting the other. However, the insurer was not required to make two separate offers. The insurer was entitled to offer a single lump sum to settle all aspects of the claim and dispute. The settlement letter clearly explained what the insurer was offering to pay, and how the offer was calculated. It clearly stated that accepting the offer would constitute ‘full and final settlement of this claim and dispute’. Not fair to set aside settlement agreement The settlement agreement was not induced by fraud or misleading and deceptive conduct. The settlement agreement was not induced by duress, undue influence, or unconscionable conduct. The insurer clearly explained the terms of the settlement offer, and the complainant voluntarily accepted the offer. For the above reasons, I am satisfied there is no legal justification for setting aside the settlement agreement. I am also satisfied that it would not be fair in all the circumstances to set aside the settlement agreement. Should the insurer increase its settlement offer? No. The evidence does not show a storm caused any damage the insurer has not agreed to pay for. Even if the settlement agreement was set aside, the complainant would not be entitled to more than the insurer offered. Expert evidence indicates building movement not covered The policy covers damage caused by a storm or flood. Both parties appointed experts who provided opinions on the cause of the building movement. For the reasons set out above, the most persuasive report was ST’s report, which concluded the building movement was not caused by a storm or flood. Not clear when cracks appeared The complainant says there was no damage to the house when he bought the property in 2012. The complainant’s property manager inspected the house on 25 August 2022, almost two months after the storm. He took photographs showing holes in the pergola roof sheets and a prominent crack in the kitchen ceiling. He did not take any photographs of the exterior walls. On 12 April 2023, he sent an email saying that on 25 August 2022, he saw no signs of damage other than water staining in the kitchen. The complainant says the property had no damage, except to the kitchen ceiling, on 25 August 2022. He says the internal and external cracks appeared afterwards as the house subsided due to the storm of 3-5 July 2022. The complainant provided statutory declarations dated 30 August 2024 from two of the tenant’s family members. The declarations said the property experienced ‘torrential rain’ from 3-5 July 2022. They said water damage on the kitchen ceiling appeared within a few days, and the internal and external cracks appeared in the following ‘days and weeks’. This contradicts the complainant’s statement that the internal and external cracks did not appear until after 25 August 2022, almost two months after the storm. Complainant has not shown movement was caused by storm The complainant says there was no subsidence or cracking before the storm of 3-5 July 2022, and this shows the damage was caused by the storm. However, the complainant: has provided inconsistent information about when the damage appeared says the damage was caused by the storm, but did not appear until at least two months after the storm. None of the expert reports say this is possible has not provided photographs showing the condition of the brick piers or exterior walls before the storm has not explained ST’s photographs showing previous repairs to internal cracks and the packing of the piers by a previous owner. It appears the piers were packed by a previous owner. This indicates the rotation and subsidence of the piers occurred before 2012. This damage was not caused by a storm in 2022. Some movement cracks appeared before 2022. Some movement cracks may also have appeared after a storm in 2022. However, any new cracks may have been caused by a continuation of the movement that had been occurring for many years before the storm (likely since the property was built), and would have continued regardless of the storm. I am not satisfied that any cracks were caused by a single storm. Policy excludes cover for storm or flood damage to retaining walls In addition to foundation movement and wall cracking, the claimed damage includes damage to a retaining wall. I am not satisfied that the retaining wall was damaged by a single storm or flood. However, the policy excludes cover for storm or flood damage to retaining walls. Therefore, even if the retaining wall was damaged by a single storm or flood, this damage would not be covered under the policy. Complainant not entitled to more than insurer offered Having considered the information provided by both parties, I am satisfied, on the balance of probabilities, that the building movement occurred over many years. It was not caused by a single storm or flood, or any other event the policy provides cover for. The complainant has not established that a storm or flood caused any damage, other than the accepted damage. Therefore, even if the settlement agreement was set aside, the complainant would not be entitled to more than the insurer offered. Why is the outcome fair? The evidence indicates the building movement occurred over many years. It was not caused by a storm, or anything else the policy provides cover for. Therefore, it was fair for the insurer to deny cover for damage caused by the building movement. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. Relevant policy terms Product Disclosure Statement | What your rental property and contents covers (pages 18 – 37) | Flood and rainwater run-off If loss or damage is caused by a flood and/or rainwater run-off. Covered  flood  rainwater run-off, and  landslide or subsidence that happens immediately as a direct result of flood or rainwater run-off. For example, excessive rainfall in your local area causes a build up of water in the street gutters and the water enters your rental property and causes damage. … Not covered  loss or damage to: ‒ retaining walls ‒ gates, fences or free standing walls if the damage occurred because they are not structurally sound or well maintained …  loss or damage caused by: ‒ erosion, deterioration, collapse, shrinkage or any other earth movement … | Storm If loss or damage is caused by a storm. Covered  storm  landslide or subsidence that happens immediately as a direct result of a storm. For example, hail damages your roof. Not covered  loss or damage to: ‒ retaining walls ‒ gates, fences or free standing walls if the damage occurred because they are not structurally sound or well maintained …  loss or damage caused by: ‒ erosion, deterioration, collapse, shrinkage or any other earth movement … | General exclusions and your responsibilities (pages 42 – 46) | General exclusions for all covers and benefits The exclusions set out in this section apply to all covers and benefits under your policy. What we don’t cover Loss, damage, injury or death arising from: …  rust, corrosion, gradual deterioration, depreciation, wear or tear  erosion, deterioration, collapse, shrinkage or any other earth movements  landslide or subsidence unless it happens immediately as a direct result of: ‒ flood** ‒ rainwater run-off** ‒ storm … …  atmospheric conditions or extreme temperature …  tree roots … We do not cover …  the settling, shrinkage or expansion in buildings, foundations, walls or pavements … Maintaining and occupying your rental property We don’t cover loss, damage, injury or death arising from:  faulty design or workmanship that you knew about or should have reasonably known about  previous damage that has not been repaired  maintenance operations …  you not maintaining your rental property in good repair and condition – this means it must be watertight, structurally sound, secure and well maintained  you not maintaining your site in good repair and condition …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.