Home / Auto & General / Determination 12-00-1000998
Determination 12-00-1000998
Broken drain water damage: claim denial, repair scope and costs
Summary
An individual's insurer partly accepted a water damage claim from a broken drain and offered cash settlement. AFCA denied most of the claimed damage but ordered payment for accepted cracking and mould remediation, professional report costs, and $2,000 non-financial loss.
The complainant did not establish a claimable loss for the ensuite, flooring, render or gardens, which were either pre-existing or excluded under the policy.
Issues
- Claim denial primary · not upheld“The insurer has established its reliance on its policy terms to deny the complainant's claim for the ensuite damage and gardening costs.”
- Claim amount dispute secondary · not upheld“The panel is satisfied that $6,600 represents a fair assessment for the remediation of the mould affected sub floor.”
- Delay secondary · upheld“The panel accepts that the insurer could have done more to progress this claim.”
Subjects and remedies
home or building damagepay claimpay compensationpay non financial loss
Related
All Auto & General determinations · Find similar determinations
Text of the determination
Determination
|
Case number
|
12-00-1000998
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-00-1000998 4 November 2024
Determination overview
Complaint
The complainant, together with his wife, holds a home and contents policy with the financial firm (the insurer).
On 23 August 2023, the complainant lodged a claim with the insurer for damage to his property following the detection of a broken ag drain the previous day that was causing water to pool under the sub floor.
The insurer had initially partially accepted the claim and offered a cash settlement to the complainant for damage to the entry, hallway and south east bedroom caused by the broken pipe. However, it declined the damage to the ensuite and external rendered brickwork. The offer was rejected by the complainant.
The insurer required the complainant to undertake maintenance work rectifying the drainage issues, allow a period of 12 months following the completion of these works and after which it would arrange a re-assessment of the damage.
The complainant says that he completed the maintenance works to rectify the drainage issues and allowed a period of drying. The complainant subsequently completed repairs except for repairs to his ensuite and main bedroom. To resolve the complaint, he seeks $132,645.60 for repairs, reimbursement of his engineering reports and compensation for the stress and inconvenience caused by the insurer.
The insurer says that as the complainant has now completed repairs and refuses to allow a re-inspection, it is unable to establish an accurate scope of repair and says that no cash settlement would be offered.
Issues and key findings
Can the insurer deny the claim?
No. The complainant has not established a claimable loss regarding the external rendering and flooring. The insurer has established its reliance on its policy terms to deny the complainant’s claim for the ensuite damage and gardening costs. However, the insurer should compensate the complainant for the damage that has been accepted which includes the cracking to the entry, hallway and south-east bedroom and mould remediation, a total cost of $10,715.10 less applicable policy excess.
Is the complainant entitled to professional costs?
Yes. The insurer should reimburse the complainant for his engineering reports in the amount of $4,785.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer should pay the complainant $2,000 in non-financial loss compensation as offered.
Why is the outcome fair?
The outcome is fair as the complainant has not established a claimable loss with regard to all damage claimed. The insurer has also established its reliance on its policy terms to deny the damage to the ensuite and gardening. The settlement represents a fair consideration of the damage caused by the insured event where the complainant has undertaken repairs prior to a re-assessment by the insurer.
Determination
This determination is substantially in favour of the insurer.
Should the complainant accept the determination, within 14 days of receiving written notice of the complainant’s acceptance, the insurer is to:
pay the complainant $10,715.10 less applicable policy excess
reimburse the complainant $4,785 for the cost of the reports from RI
pay the complainant $2,000 in non-financial loss compensation.
Reasons for determination
Can the insurer deny the claim?
No. The complainant has not established a claimable loss regarding the external rendering and flooring. The insurer has established its reliance on its policy terms to deny the complainant’s claim for the ensuite damage and gardening costs. However, the insurer should compensate the complainant for the damage that has been accepted which includes the cracking to the entry, hallway and south-east bedroom and mould remediation, a total cost of $10,715.10 less applicable policy excess.
Onus on complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
The policy provides cover for listed insured events. It also offers optional accidental damage cover. The relevant renewal certificate shows this optional cover was taken. The policy was incepted on 1 April 2022.
The complainant says that his property was damaged following a blocked stormwater drain which caused damage to the subfloor on 22 August 2022.
Subject to its conditions and exclusions, the policy provides cover for loss or damage caused by the insured event of escape of liquid. There is no dispute that the stormwater drain was broken and caused some damage to the property due to moisture in the sub floor. However, the parties disagree as to the extent of the damage.
It is therefore necessary to determine the proximate cause of damage to the insured property. Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence.
Parties disputed the maintenance required and drying period
Following the discovery of a large amount of water in the sub floor area on 22 August 2022, the complainant lodged a claim with the insurer the following day.
The insurer appointed a builder, JP to inspect and assess the property. JP attended on 24 August 2022 and arranged for a leak detection test to be undertaken. A hygienist, S was also appointed and attended the property on 7 September 2022.
S noted that the subfloor had elevated moisture readings. S installed drying equipment and returned the following week and installed an extra dehumidifier. The floating bamboo floor in the living room and entry was noted to be restorable and the floating hardwood flooring the hallway was also restorable.
JP also arranged for an engineer, HC, to inspect and prepare a report.
HC’s report is dated 21 September 2022. HC had previously inspected the property and prepared a report dated 21 January 2022 as noted above.
At the time of HC’s inspection in September 2022, the complainant, who is a plumber, had repaired the broken stormwater pipe adjacent to the north-east corner of the property and the ag drain along the east side of the property which was full of tree roots in early September 2022.
The inspection of the sub floor showed it to be wet and in a similar condition to their previous inspection in January 2022. HC found that the reported leaking stormwater pipe and blocked ag drains had accentuated the poor site surface drainage and water ingress to the sub floor area. HC made several recommendations to improve the site surface drainage on the south and north sides of the property and recommended a period of drying of 12 months following these repairs and then re-assessment of the damage.
HC re-attended and provided a supplementary report dated 14 December 2022 following obtaining soil test results for the property (ST). ST confirmed that the soil was classified as Class P (Problem Site) due to abnormal moisture conditions. HC noted that seasonal changes in moisture content of the foundation material can cause up to 40mm movement at the surface of the soil.
HC found no abnormal moisture conditions on the north-east corner of the property where the blocked/leaking service had been repaired. However, recommended:
install new paving along the north and south side of the property, with it grading away from the property
installation of ag drain along the new paving sections to remove additional sub-surface water and connected to the existing stormwater system
any remaining roof spouting issues be repaired.
HC recommended that the upgrades to the site surface drainage must be undertaken before the monitoring period could commence. In accordance with the ST’s recommendations, a period of 4 months be allowed, if drying occurred over the summer months.
HC also recommended that a soil engineer re-attend to confirm if the foundation material had dried and a further inspection of the sub floor to ensure that no further moisture ingress was occurring.
The complainant disputed that it was necessary to remove the concrete paving beside the property and believed that he had completed the necessary maintenance works.
On 13 January 2023, the insurer wrote to the complainant and advised that in accordance with the recommendations from HC, the complainant was required to address maintenance at the property. This included poor site drainage, poor roof drainage and subfloor ventilation. The insurer advised that once evidence has been supplied of these works being completed, the drying period of 12 months would commence. The insurer had confirmed with HC that he did not believe that the complainant’s repairs to only the southside of the property (but not the northside) was sufficient.
The complainant obtained his own engineering report from RI dated 24 May 2023 following a site inspection on 27 April 2023. Despite noting the failure of the plumbing and the ag pipe full of roots, RI thought that there could be another cause. RI believed that there was an interface between the sands and the clay that facilitates moisture to flow to the property and this moisture may be coming from a long distance up the hill.
RI noted that the concrete was graded towards the building and there was a build up of mould and green fungal growth. However, RI says that as there are many trees behind the concrete paths, this causes the ground to dry out. Therefore, RI says that the incorrect grading of the pavement was not a negative.
RI also did not believe that smaller pipes going into a larger pipe was a defect. RI says that generally the system flows, unless it blocks and overflows. RI says that there is no evidence that this occurred and therefore is not a defect.
RI says that the ventilation in and around the property is adequate and complies with standards. However, inadequate where flooding via the sands and silts occurs.
RI recommended:
that a 1 metre strip be taken away from the stretch immediately adjacent to the building, noting that the concrete paving grades towards the building
a method of capturing water and stopping it getting near the building
the installation of a complete cut off trench, at least 50mm into the clay layer, across the front of the property, preferably under the driveway would be of benefit.
Following a review of RI’s report, the insurer issued the complainant with a letter dated 17 July 2023 which advised the complainant that all the recommended maintenance was required to be completed and a 12 month drying period be allowed.
RI provided a further report dated 26 September 2023. RI disagreed with HC’s findings that there was inadequate site surface drainage that required maintenance. RI also did not believe that it was necessary to do anything about the paving as it was graded strongly down the slope. RB recommended caulking between the paving and the wall to prevent pounding.
RI also says that the roof drainage was found not to be a problem and that some of the connection details were satisfactory.
RI withdrew from his earlier comments and was satisfied that the water overflowed because the ag line and stormwater line were blocked by tree roots. RI accepts that this is the cause of the damage and that it would have been occurring for 6 to 12 months, nothing that the timeframe places it at or about the time of HC’s attendance in January 2022.
During the complaint, on 30 May 2024, the insurer accepted based on the supplementary report from RI that new paving to the property was not required. Noting that the waiting period had ended, the insurer advised that they would arrange for an engineer and builder post drying assessment and re-assess the scope of work (SOW).
Complainant claims all damage is from the insured event
The complainant has now refused access to the insurer to re-inspect the property following the drying period. He says that he has now completed the repairs except for the master bedroom and ensuite. The complainant says that these works commenced in August or September 2023 after the drying period. He says that he has paid cash for these repairs and therefore does not have any invoices. However, he has provided various quotes and claims the cost of these which include the following:
reinstate front garden and lawn garden beds $6,500
bathroom/master repairs and mould remediation $36,746.60
external rendering $29,240
replacement of flooring $60,159
The complainant claims that all the observed damage at the property is because of the insured event. While the complainant acknowledges that HC had previously noted that he had lodged a complaint with his previous insurer in relation to floorboard movement and cracking to the render, he says that the damage is different. He previously had claimed that they had moved because of an earthquake in 2021. However, he says that the floorboards have cupped and ‘bled’ and the cracking has markedly increased following the insured event. The complainant relies on the report from RI that cracking to the render was caused by moisture.
The complainant says that as the property was contaminated with mould, he was required to commence repairs.
Insurer says that damage cannot be assessed
The insurer says:
it has been in constant contact with the complainant about the required maintenance
the complainant has failed to comply with the policy conditions by assigning trades to complete the work prior to allowing the insurer an opportunity to inspect the damage following the drying period
the complainant has not substantiated his costs by way of a post-dry remediation report, it is unable to establish the claimed quantum
the complainant has prejudiced its ability to assess the claimed damage and establish an accurate scope of repair.
The insurer also denies liability for the shower recess and adjoining master bedroom. It relies on a plumbing report from SP dated 15 November 2022 which identified that deteriorated grouting/sealants and a failure of waterproofing to the shower recess had caused long term moisture damage. A sub floor inspection by SP also found moisture staining to the chipboard flooring. This was noted to be concentrated below the ensuite shower recess only.
VA, the hygienist appointed by the insurer, also noted when they inspected the property and provided a report dated 31 October 2022, that visual mould growth was identified in the ensuite vanity cabinetry and grout was missing in certain areas to the southern end of the ensuite.
The insurer relies on their exclusion clause within the escape of liquid event on page 37 of the PDS which excludes cover to damage caused by escape of liquid from a shower recess.
In relation to the mould damage, the insurer says that VA identified that remediation, by way of removal of the chipboard flooring and removal of the carpet in the master bedroom, was required. This was because of the leaking shower recess and not the insured event.
The insurer has offered to re-inspect the ensuite and master bedroom to determine if there is any damage from the insured event but decline the damage to the shower recess and any damage to the adjoining master bedroom from the shower recess.
In relation to the flooring, the insurer says:
the movement to the floorboards is not consistent with water damage. Typically, floorboards would swell/cup, and not move
the damage is more consistent with installation issues when the flooring was laid
the complainant has not provided any evidence to show water related damage to the flooring
the photos provided do not show water related damage.
The insurer has denied the complainant’s claim for the floorboards, saying that the complainant has not established a claimable loss. The insurer says that it maintains its decline unless reinspection could occur to determine the cause.
In relation to the rendering, the insurer says that the cracking does not relate to the insured event but because of render applied over the expansion joints as found by HC. The complainant’s engineer RI also noted that the hairline cracking in the rendering is believed to be due to movement due to brick growth, thermal movement and minor growth.
The insurer denies the complainant’s claim for garden repairs, saying that the policy specifically excludes such costs.
Insurer cannot deny the claim
The insurer obtained a quote from its builder JP for repairs based on a SOW from HC’s engineering report. It included repairs to the cracking in the entry ceiling, hallway ceiling and south wall of the south-east bedroom.
The insurer offered to cash settle the complainant based on the quote from JP dated 10 January 2023 in the amount of $1,972.08 for these repairs. It acknowledged that following the drying period, it would be necessary to re-assess to see if further cracking had developed.
The panel notes that the complainant has not sought any additional costs in relation to repairing cracks in these areas or re-adjustments of doors or windows noted by RI.
In the absence of any other supporting evidence from the complainant disputing these costs, the panel is satisfied that it is fair and reasonable that the insurer cash settle the complainant for these repairs which the insurer has accepted were caused by the insured event. However, given the age of the quote, the insurer should include a 25% uplift for contingencies and the loss of a lifetime guarantee on repairs. That is, the insurer should pay the complainant $2,465.10.
The hygienist reports from EH and VA confirmed that there was mould in the sub floor area. VA recommended that areas of mould due to the leaking ensuite would be to be removed or encapsulated prior to remediation works commencing. EH and VA’s assessment found mould in the ensuite vanity unit and the sub floor. EH noted that there was mould under the sub floor master bedroom which is located adjacent to the ensuite. VA recommended that the leaks and maintenance was addressed and following a drying period they would re-attend and commence remediation.
The complainant’s quote from FC provides remediation/mould removal at a cost of $6,820.
The insurer obtained a quote from VA based on its SOW following its assessment in December 2022. While the insurer has not provided a copy of the quote, the claim notes record on 12 January 2023 a notation that the cost is $6,600 for remediation works to the subfloor as specified in the hygienist SOW. A call recording provided by the insurer also refers to this being offered to the complainant on 18 January 2023.
The panel is satisfied that $6,600 represents a fair assessment for the remediation of the mould affected sub floor. It is consistent with the complainant’s own quote.
Noting that the complainant has undertaken the remediation of the mould, the panel is satisfied that it is fair and reasonable that the insurer pays the complainant based on the quote provided by VA in the sum of $6,600. The insurer should also include a 25% uplift for contingencies and the loss of a lifetime guarantee on repairs. That is, the insurer should pay the complainant $8,250.
Claimable loss not established for rendering, flooring and ensuite
The panel is not satisfied that the complainant has established that his property has suffered damage because of an insured event, with the exception of the noted cracking to the entry, hallway and south east bedroom
In relation to the complainant’s claim for damage to the rendering and floorboards, the damage was reported by HC in his report dated January 2022.The report from HC has been referred to by both the complainant’s engineer RI and the insurer’s appointed engineer for this claim also being HC.
HC referred to a flooring report prepared by SF dated 28 October 2021. SG noted the flooring was an engineered solid pre-finished bamboo floating floor that been installed as one single unbroken raft. This was outside of warranty terms. Further, SF had noted that the moisture content was greater than expected.
In January 2022, HC noted that a gap had formed in the floating floor. HC determined that the cause of the damage was not an insured event but was from inadequate construction of the floating floor.
HC also noted the horizontal cracking that had occurred to the rendered brickwork. HC concluded that the cracks in the external render were from render being applied over articulation joints and not from an insured event.
HC also noted in January 2022 that there was a large amount of moisture in the sub floor area and had associated this with:
poor site drainage;
poor roof drainage; and
sub floor ventilation issues.
While the complainant says that the issue with the floorboards is different, the panel is not persuaded as the complainant has not provided further information that establishes that the damage relates to the insured event. Noting that HC’s report refers to the excessive moisture under the sub floor in January 2022, the reference to RI of the possible damage to the render being caused by moisture does not establish that the damage was from the insured event. Rather, it is likely that such damage existed prior to the inception of the policy. RI noted:
I believe that covering over your articulation joints has been the major contributor to the hairline cracking showing in your render, as the relative levels indicate that you house is very much in good alignment and such a small amount of ground movement should not have caused cracking unless articulation joints were not done properly and/or your render is very brittle.
In relation to the floorboards, the panel was not satisfied that the complainant had established a claimable loss. The panel notes that HC referred to the high moisture content in the floorboards which was documented in September 2021, and the sub floor was observed to have large amounts of water prior to policy inception. Page 11 of the PDS provides that the insurer will:
…give you protection for events described in this document that occur during the time you are insured with us.
As damage to the floorboards and cracking of the external render was apparent prior to policy inception, the panel is not satisfied that the complainant has established a claimable loss for these.
The insurer seeks to limit the loss or damage to the ensuite, relying on their exclusion clause with respect to the ensuite shower recess. The evidence from SG and VA confirm that grout was missing from the shower recess that had allowed the water to escape. HC also noted cracking in the ensuite grout in September 2022. Both SG and VA confirm that a water stain was present in the sub floor area under the shower recess with mould present.
The complainant says that there was a significant deterioration in the ensuite that occurred after HC’s inspection. The complainant says that this is an indication of the damage caused by the leaking pipe/overflow from the damaged ag line which is adjacent to the ensuite and caused the separation of the grout inf the shower recess.
The panel was not persuaded that this was caused by the escape of liquid event as SG had noted that this was long term moisture damage and not a recent event. Further, RI undertook level surveys of the property in late April 2023 (after HC’s attendance) and noted that:
The action of the moisture that has come in, has not initiated major movement or the likelihood of failure of the structure.
The complainant has provided a quote from FC dated 5 March 2024 which includes repairs to the ensuite and master bedroom. The quote provides for the strip out and reinstatement of the entire bedroom and ensuite. However, the remediation reports from VA and EH had only identified mould in the vanity unit and the sub floor.
The panel is not satisfied that the complainant has established a claimable loss with respect to the ensuite and master bedroom from the insured event.
Insurer can rely on exclusion to decline claim for gardening
The insurer’s claims notes record that the complainant was advised that the policy excluded loss or damage to trees, shrubs and plants. However, they would consider a claim for damage to garden edging if it was caused by exploratory work.
The complainant has not provided any evidence to support that the claim relates to exploratory work. It appears to relate to reinstatement landscaping only. The panel is satisfied that the insurer can deny the complainant’s claim for reinstatement of the garden as page 62 of the PDS provides that loss or damage to trees, shrubs and plants is specifically excluded.
Is the complainant entitled to professional costs?
Yes. The insurer should reimburse the complainant for his engineering reports in the amount of $4,785.
AFCA may require insurer to contribute to a complainant’s professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim.
Insurer to pay complainant’s expert costs
The insurer has offered to reimburse the complainant the cost of his expert reports if he provides evidence of paid invoices.
The complainant has provided copies of the tax invoices issued by RI in the total amount of $4,785.
The panel is satisfied that these invoices are sufficient evidence, and that the insurer should reimburse the complainant the cost of RI’s reports in the amount of $4,785.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer should pay the complainant $2,000 in non-financial loss compensation as offered.
AFCA can award compensation for non-financial loss
Under its rules, AFCA can award the complainant compensation for non-financial loss (capped at $5,400) where, amongst others, the insurer takes an unusual amount of time to resolve his situation or causes an unusual interference with his peace of mind.
AFCA takes a conservative approach when assessing compensation for non-financial loss.
Insurer has caused delays
The insurer acknowledged that its claims handling was at times poor and has offered $1,000 on an ex-gratia basis.
The complainant says that the insurer has caused delays, had poor communication and as a result has caused him significant stress and inconvenience.
The panel accepts that the insurer could have done more to progress this claim. The complainant had clearly expressed that he wished to resolve the matter and disputed the extended drying period that was initially suggested. The insurer has subsequently agreed that not all the maintenance requested was required. This meant that a shorter drying period was required and has resulted in further delays in re-assessing the damage.
In these circumstances, the panel consider it appropriate that the insurer pay the complainant $2,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the complainant has not established a claimable loss with regard to all damage claimed. The insurer has also established its reliance on its policy terms to deny the damage to the ensuite and gardening. The settlement represents a fair consideration of the damage caused by the insured event where the complainant has undertaken repairs prior to a re-assessment by the insurer.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Premium increase complaint not considered
The complainant had initially lodged a complaint in relation to his premium increase. However, on 20 May 2024, the complainant advised AFCA that he did not wish to continue with this aspect of his complaint. Accordingly, the panel did not consider his premium increase in this complaint.
Escape of liquid in kitchen not considered
A separate leak was discovered under the property from a hot water pipe. The insurer has advised the complainant to lodge a separate claim in relation to this. At this time, the complainant has not lodged a claim, and this was not considered in the determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.