Home / Auto & General / Determination 1027725
Determination 1027725
Denial of claim for damaged sewer pipe alleged to be caused by heavy rain and earth movement
Summary
The complainant claimed for a damaged sewer pipe he said was caused by heavy rain on 6 August 2023, and the insurer denied the claim. AFCA found the complainant had not shown the damage was caused by an insured event and decided in favour of the insurer.
The complainant bore the onus of showing on the balance of probabilities that earth movement within 72 hours of a storm caused the damage, and the expert and BOM evidence did not establish a causal link.
Issues
- Claim denial primary · not upheld
“The complainant has not established a valid claim under the policy and the insurer is therefore entitled to deny the claim.”
- Inadequate claim investigation secondary · not upheld
“Complainant said insurer and W failed to visually inspect the pipe; AFCA said this was not necessary as onus is on complainant to establish a valid claim.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 1027725
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 1027725 Page 1 of 6
Case number: 1027725 7 May 2024
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under his home insurance
policy for damage to the sewer pipe from heavy rain.
The insurer denied liability for the claim on the basis the complainant had not established that
heavy rain/storm damaged the sewer pipe. It says the damage was caused by ongoing wear
and tear, gradual deterioration and earth movement, which are causes excluded under the
policy.
The insurer accepted liability for resultant damage caused by the damaged sewer pipe under
the escape of liquid benefit of the policy. That part of the claim is not in dispute between the
parties.
The complainant disputes the insurer’s denial for the balance of the claim. He seeks for the
insurer to accept the claim and says the sewer pipe damage was caused by heavy rains on 6
August 2023.
1.2 Issue and key findings
Is the insurer entitled to deny the balance of the claim?
Yes. The complainant has not shown the damage to the sewer pipe was caused by earth
movement occurring within 72 hours of the storm/heave rain. The complainant has therefore
failed to establish a valid claim under the policy.
The information from the experts and data from the Bureau of Meteorology (BOM) do not
support the complainant. The evidence does not show a causal link between an insured event
and the damage observed.
Why is the outcome fair?
The parties are bound by the terms and conditions of the policy. The complainant ’ s
circumstances were not covered under the policy. It would be unfair to expect the insurer to
cover claims outside the agreed policy terms.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim for the damaged sewer pipe. It is not required to take
any action.
Determination | Case number: 1027725 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the balance of the claim?
Yes. The complainant has not shown the damage to the sewer pipe was caused by earth
movement occurring within 72 hours of the storm/heave rain. The complainant has therefore
failed to establish a valid claim under the policy.
The information from the experts and data from the Bureau of Meteorology (BOM) do not
support the complainant. The evidence does not show a causal link between an insured event
and the damage observed.
Onus on the complainant to establish a valid claim
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured. This is referred to as a valid claim.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Policy cover is subject to terms, conditions, and exclusions
There is no dispute the complainant received a copy of the policy documents. The insurer is
therefore entitled to rely on the terms of the policy in assessing the subject claim.
The policy covers loss or damage caused by storms and rainwater:
including from earth movement that occurs within 72 hours of a storm or heavy rain, and
as a result of that storm or heavy rain
the escape of rainwater from any water pipe, drain, or gutter.
Storm is defined under the policy as a weather event, including cyclones, that may be
accompanied by strong winds, rain, lightning, hail, snow, or dust. An insured event is an event
listed in the insurance cover section of the policy.
Parties provided different views on cause of the damage to sewer pipe
The complainant purchased the property in 2017 and has had no issues with the sewer pipe
until August 2023.
The tenants reported an issue with the sewer pipe on or around 7 August 2023. On 8 August
2023, a plumber flushed out the line. No report from this plumber has been submitted for
review. The tenant subsequently moved out of the property on or around 27 August 2023 as
the sewer pipe issue was not resolved and there was a lack of a working toilet at the insured
property.
The complainant’s p lumber C’s report dated 6 September 2023 states:
Inspect and locate sewer line at property. Use high pressure Jet blaster to clear
blockage. Excavate under decking and locate sewer line for access. Cause of
blockage is due cracked/ collapsed earthenware pipe due ground movement.
Also, crack in pvc pipe under laundry slab. Pipe has been temporarily unblocked.
Determination | Case number: 1027725 Page 3 of 6
We recommend replacing it with a new pvc pipe. Pipe in neighbour’s property will
also need to be replaced.
The complainant lodged the claim with the insurer on 19 September 2023 as soon as the
initial investigations were completed. The insurer appointed an engineer (W) to assess the
circumstances surrounding the loss and identify the cause of the damage.
W ’s report dated 25 September 2023 states:
property was built in the late 1930 ’ s or early 1940 ’ s
if the recent storm event had caused sudden foundation movement surrounding the pipe,
there would be visible indicators of such movement, such as tapered diagonal cracks
originating from the base of the adjoining masonry walls supported by the same foundation
found no evidence of differential settlement, cracking, or distress in the flooring or the tile
overlay that would suggest any short-term foundation movement has occurred
the claimed storm event has not resulted in sudden movement within the foundation
materials
the subject property has encountered heavy rainfalls, at times comparable to or even
exceeding the maximum rainfall recorded in August 2023. If ground movement during the
alleged storm event in August 2023 were the root cause of the pipework damage, similar
or more substantial damage to the pipe would have occurred during heavier rainfalls in the
preceding months/ events
the pipework has been subjected to ongoing movement of the soil during each course of
rainfalls as a result of saturation of the soil due to subterranean water and further drying
and shrinkage over time
given the age of the building, the earthenware pipe is beyond functional lifespan and has
sustained general wear and tear over an extended period of time
the inherent and gradual movement and settlement of the surrounding soil in conjunction
with the age deterioration and wear & tear of the pipe has gradually and progressively
caused cacking to the brittle earthenware pipe
the cracking to the pipework has been exacerbating over time, allowing soil to permeate
into the pipework through the cracked surface, gradually and progressively causing
blockage of the pipe over time
the combination of the above factors has gradually worsened the damage to the pipe to
the point where the pipework has ultimately sustained breakage and is no longer
serviceable.
The complainant is a civil engineer. He presented a diagram supporting his view that the type
of failure of the sewer pipe could be caused by ground movement several meters away from
the house in the garden.
The area under and near the house is unlikely to experience the same expansion and
contraction on heavy rain because it is sheltered. This would cause the sewer pipe
connection point near the laundry to remain stiff whilst the rest of the line moved, thereby
causing the failure. As the sewer pipe had not experienced any issues previously, the
complainant was satisfied the heavy rain on 6 August 2023 damaged the sewer pipe.
Complainant has not established a valid claim
The complainant remains dissatisfied the insurer and W failed to visually inspect the
damaged sewer pipe before commenting on the condition of the sewer pipe. He says C had
advised the sewer blockage was due to ground movement.
Determination | Case number: 1027725 Page 4 of 6
He says the insurer and W had failed to discharge their duty of care under contract and in tort
by not visually inspecting the sewer pipe, which resulted in economic loss to him. As per BOM
definitions, 15mm of rain should be considered as heavy rainfall.
The insurer acknowledges that W did not physically inspect the damaged pipework. It says
the information available did not warrant the need for further invasive or exploratory works.
I acknowledge the complainant’s view that the insurer has not established the exclusions as it
never inspected the damaged pipework. However, this is not necessary as the responsibility
first and foremost remains with the complainant to establish a valid claim under the policy.
The complainant must show the proximate cause of the sewer pipe damage was the earth
movement occurring within 72 hours of a storm/heavy rain. Damage can have more than one
cause. The proximate cause is not necessarily the first or last or the sole cause of the loss. It
is the effective, dominant or operative cause of the loss.
W presented BOM data from Sydney airport recording 5mm of rain on 6 August 2023. The
complainant submitted BOM data from another weather station, closer to the insured property
(2km away), recording 15mm of rain on 6 August 2023.
There is no expert evidence from any invasive investigations that occurred soon after the loss
event on or around 7 August 2023. The report from C was completed a month after and W
inspected the property on 22 September 2023. Based on the information presented by the
parties, the outcome of this determination will be based on, what most likely occurred, on the
balance of probabilities.
The BOM data from the complainant shows the insured property experienced heavy rains in
February 2023, including 86mm (22 February 2023) and 65mm (9 February 2023) within a
24-hour period. If I am to consider the proximate cause of the damage was heavy rains, then I
am of the view the sewer pipe would have sustained damage in February 2023.
The damaged sewer pipe was located under the decking/laundry area. I accept the property
itself would have also shown some signs of movement caused by the subject earth
movement, if it was the result of the rain event in early August 2023.
I acknowledged the complainant’s explanation as to how the differential movement under the
decking and a location several meters away in the garden could have caused the pipe to
crack. If this was the case, it is more likely this damage would have become evident after the
heavy rains in February 2023.
I accept the sewer pipe did not experience any issues before the heavy rain in August 2023.
However, I am persuaded by W’s findings which are logical and consistent with the BOM
weather data observed in the area close to the property. There is also no information to show
rainwater from a pipe caused damage to the sewer pipe. I am not satisfied there is a causal
link between the rains on 6 August 2023 and the claimed damage to the sewer pipe.
Given the above, I am not satisfied that on the balance of probabilities, the damage to the
sewer pipe was caused by earth movement within 72 hours of the heavy rain or any other
listed insured event on or around 6 August 2023. The complainant has not established a valid
claim under the policy and the insurer is therefore entitled to deny the claim.
As the complainant has not established a valid claim under the policy, it is not necessary to
determine if the insurer had established the exclusion may apply to defeat the claim.
Determination | Case number: 1027725 Page 5 of 6
Finally, I have considered if the damaged sewer pipe may be covered under the insured
event for escape of liquid. This section specifically excludes cover for the cost of repairing the
damaged pipe from which the liquid escaped. Hence there will be no cover under this section.
2.2 Why is the outcome fair?
The parties are bound by the terms and conditions of the policy. The complainant ’ s
circumstances were not covered under the policy. It would be unfair to expect the insurer to
cover claims outside the agreed policy terms.
Determination | Case number: 1027725 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.