Claim for property damage (cracking and water ingress) declined on the basis that excluded causes were the proximate cause
Text of the determination
Determination
Case number 1018953
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 1018953 Page 2 of 8
Case number: 1018953 15 April 2024
1 Determination overview
1.1 Complaint
The complainant lodged a claim for property damage under a residential strata insurance
policy underwritten by the financial firm (insurer). The complainant says the damage was
caused by earthquake and/or construction work near the property.
The insurer denied the claim. It says the damage was caused by factors excluded by the
policy.
The complainant disagrees with the insurer’s decision. He wants the insurer to repair the
claimed damage.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. Based on the exchanged information, the insurer has established, it is more likely than
not, the damage was principally caused by excluded factors.
Why is the outcome fair?
The outcome is fair because the insurer has established, on the balance of probabilities, that
the damage was caused by factors excluded by the policy. Accordingly, it would not be fair to
require the insurer to cover the damage.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim.
Determination | Case number: 1018953 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. Based on the exchanged information, the insurer has established, it is more likely than
not, the damage was principally caused by excluded factors.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that is more likely than
not), they he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured.
Subject to the terms and conditions set out in the Product Disclosure Statement (PDS), the
complainant’s policy covers accidental loss and damage to the insured property caused by an
incident during the policy period.
The PDS defines ‘damaged, damaged’ as ‘any partial or total accidental physical loss of, or
destruction of property from any sudden and accidental cause not otherwise excluded by this
Policy’.
In June 2023, a 4.6 magnitude earthquake occurred near Rawson, Victoria. At this time,
construction work was taking place 6-8m from the complainant’s property. This work included
machinery digging trenches, laying 1150mm pipes, earth compaction and large trucks driving
to and from the construction site.
The complainant says that after the earthquake he noticed cracking and movement damage
to the porch slab and pillars. He says the building movement caused gaps to form causing
water damage. The complainant attributes the damage to the earthquake, the construction
work or a combination of these.
If the complainant proves the existence of a claimable loss the insurer is liable for the loss
unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving
on the balance of probabilities the application of the exclusion or condition.
The policy contains the following relevant exclusions:
1. We will not pay for Damage caused by or arising directly or indirectly
from :
[…]
f. vibration or from the removal or weakening of or interference with the support
of land or buildings or any other property, Erosion or Earth Movement. However,
we will pay if the Damage is due to:
i. earthquake or seismological disturbance, Tsunami, explosion, physical
impact by aircraft;
i. inherent defect or latent defect
m. normal settling, creeping, heaving, seepage, shrinkage, or expansion in
buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways,
paths, garden borders and other structural improvements’
‘3. We will not pay for:
[…]
c . the cost of rectifying faulty or defective materials or faulty or defective
workmanship, design or specification
Determination | Case number: 1018953 Page 4 of 8
Proximate cause must be determined
In a general insurance claim, the term ‘proximate cause’ is used to describe whether an event
is the cause of the loss or damage. The proximate cause of a loss is the dominant, effective
or operative cause. It does not have to be the first, the last or the only cause.
If there are several causes, each should be examined to determine whether it is a dominant,
effective or operative cause of the loss. For example, if one cause would have caused the
loss on its own, and the other cause would not have caused the loss without the first, then the
first is the proximate cause.
Insurer relies on expert reports to decline the claim
The insurer relies on reports by structural/forensic engineer, LC, who inspected the property
on 27 July 2023 . LC’s reports are dated 31 July 2023, 30 August 2023, 14 November 2023, 7
December 2023, 24 January 2024 and 2 February 2024 and say:
borehole soil tests showed stiff moist clay at 500mm
the property has site classification as P (problem) due to reactive clay soil and large trees
close by
the distance from the epicentre meant the shaking experienced would have been no more
than MMI IV (light) on the Modified Mercalli Intensity (MMI) scale and that the peak ground
acceleration of 0.010g was recorded in the locality of the property.
the lateral stability and bracing analysis of the structure shows the building can resist
maximum lateral force imposed by that level of ground acceleration and would not have
sustained damage
the nearby construction is below ground infrastructure pipe laying and is a standard and
common project and construction methodology. That work is within the lateral design
capacity of the building and would not be expected to cause the claimed damage
movement and damage to porch pier was not caused by excavation or vibration from
construction
the cracking damage is consistent with stress cracks from bending and shrinkage and not
consistent with earthquake or vibration from construction
cracking to porch caused by building movement due to one or more of the following
factors:
> long term differential footing movement due to differential moisture content variation in
the reactive foundations
> inadequate founding depth of the footing system given proximity to large trees
> long term dilapidation and normal building stress
it made its assessment based on the relevant building codes that were in place at the time
it was constructed
the issuing of an occupancy certificate does not certify that a structure is fully compliant in
every aspect. It therefore does not mean that waterproofing is compliant.
water ingress was caused by inadequate installation of the waterproofing system. In
particular, the pattern of water ingress on the balcony identifies inadequate or non-
compliant detailing of waterproofing termination at the edges
pavement cracking caused by inadequate placement and positioning of reinforcement with
a section of the pavement along the slab edge being unreinforced allowing the concrete to
fracture
cracking in the façade is visible in the 2017 sales photo
past repairs of pavement and balcony wall cracks confirm the damage and movement has
been long-term
Determination | Case number: 1018953 Page 5 of 8
water ingress can be latent and can progress without the owner noticing. Moisture damage
to the porch ceiling is clearly long-term given the extent of damage. The damage pre-dates
the earthquake and excavation work. In any event, waterproofing is flexible and able to
withstand claimed events
trees are a contributing factor to expected ground movement. Australian Standard 2870
identifies the influence zone within which tree roots are considered an adverse effect on
the soil causing problem site classification. The trees reference d in LC’s earlier reports are
within that influence zone.
Complainant says earthquake and construction caused the damage
The complainant strenuously disagrees wi th the insurer’s claim denial. He says that LC ’s
conclusions are based on insufficient inspection, testing, information, are inconsistent and not
objective. He has provided numerous submissions and attachments including photos, a
video, an extract from plumber, an email from arborist, various permits and certificate and
statements from neighbours. He says:
the damage to pillars was caused by the earthquake in combination with heavy
construction in front of his property, exacerbated by problematic foundation soil (clay). The
complainant says these factors caused a significant shift to the pillars, which in turn has
caused gaps in the horizontal/vertical tiles of the balcony, via which the water leaks
downwards. He says this the water damage seen by LC was 30 days after the claim during
which time heavy rain fell and the construction dirt was flushed through the gaps
heavy machinery including compactors was used in the construction. He and his
neighbours felt vibrations in their houses from the construction work
the trees could not have impacted the property, they are further away from the property
than construction site
the balcony was constructed in 2000-2001 and any poor workmanship such as to cause
cracking or water damage would have been seen earlier
the insurer and/or its engineer should have undertaken further testing and obtained reports
from arborist, plumber, seismologist and geologist
LC’s inspection was too brief and inadequate and did not see the balcony from above
LC’s assessment was inadequate in numerous respects including assessing the property
using incorrect standards, failing to examine photos of the construction work, disregarding
the arborist advice, not making enquiries with the department responsible for the
construction work and failing to obtain structural document about his property
There was no cracking damage before the earthquake and construction work. He provides
2017 photos of the pillar with no damage and video in which no cracking damage is seen
damage due to ground movement would have caused more major damage, and
there were no Australian Standards that applied to balcony waterproofing at the time the
property was constructed. It follows that the waterproofing could not have not complied
with those standards. Further, as the building passed inspections and an occupancy
certificate was obtained, it could not be defective.
The complainant provided an email from arborist, MG, dated 22 October 2023 which says:
he inspected a tree near the property
there was no evidence of roots close to building
the tree is not big enough or close enough to the building to cause any issues, and
the cracks were on the second story which would not be caused by tree roots.
The complainant provided an extract of plumber, LL, who found there was a storm water pipe
holding water proximate to his property and an image of this.
Determination | Case number: 1018953 Page 6 of 8
The complainant provided a statutory declaration from on neighbour and a letter another
providing information about the size of the trenches, vibrations felt and new damage one
neighbour found in their property.
Insurer is entitled to deny the claim
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
Based on the exchanged information, I am satisfied the insurer has established, it is more
likely than not, that the proximate cause of the damage to the property are excluded factors.
These include the failure of the waterproofing, long-term ground movement, gradual
deterioration and wear and tear issues. The causes are excluded by the policy.
I make this finding because:
I am persuaded by LC’s evidence. It has set out analysis and methodology and some
supporting images. I am satisfied it is appropriately qualified to provide expert opinion
LC unequivocally concludes that neither the earthquake nor the construction was the
cause of the damage claimed
the ShakeMap shows an earthquake’s intensity decreases with increasing distance from
the epicentre. The MMI scale is commonly used to describe the damage and felt effects of
an earthquake at a given location. The earthquake intensity using ShakeMap was
assessed at MMI IV (light) which indicates the earthquake forces are not expected to
cause damage to buildings
LC says the peak ground acceleration of 0.010g was recorded in the locality of the
property. Having investigated the house, is confident it understands the construction
methodology, and found the structure would not sustain damage from such earthquake
loads . LC’s analysis of crack patterns found they were not consistent with earthquake
imposed forces
LC considered the excavation, vibration and proximity of the nearby construction work as
well as assessing the nature of movement and cracking of the property. It concluded it was
not caused by the construction work (laying major water pipes). It says that was based on
engineering expectations and norms used in below ground infrastructure pipe laying which,
it says, is a standard and common project and construction methodology. Given the
absence of information indicating non-standard or uncommon construction methods were
used, I am satisfied this is a reasonable approach
I am satisfied that the proximate cause of the water ingress was the failure of the
waterproofing, not earthquake or construction. The extent of the moisture deterioration
shows it to be a long-term problem. LC says waterproofing systems are manufactured to
have flexibility to accommodate building movement. I am satisfied that, even if compliant
with Australian Standards, the exchanged information shows the water ingress damage
was caused by inadequate installation of the waterproofing system. In particular, the
pattern of water ingress on balcony identifies inadequate detailing of waterproofing
termination at the edges. In any event, the weight of the exchanged information does not
show that the water ingress was, more likely than not, caused by earthquake, the effects of
nearby construction or other sudden and accidental cause
I am persuaded by LC’s evidence that the proximate cause of damage to the porch was
stresses induced from long term building movement due to one or more of: long term
differential footing movement, inadequate footing depth, and/or long-term dilapidation and
normal building stress
Determination | Case number: 1018953 Page 7 of 8
I am persuaded by LC’s evidence that the proximate cause of cracking of the concrete
porch slab was due to long term ground movement, concrete shrinkage stress cracking
and inadequate installation of the reinforcement
I accept LC’s evidence that an occupancy certificate does not establish that a property has
no defects
I consider a structural engineer is more qualified than an arborist to assess the effects tree
roots can have on a built structure
LC has provided a 2017 image of the property that shows a number of cracks in the render
at the top of the balcony. LC also provides photos of a crack and prior repair of concrete
porch slab and concrete piers of front porch. This supports LC’s conclusion that movement
was already occurring when the complainant purchased the property and this has
continued, and
while I accept the information provided b y the complainant’s neighbours, I give greater
weight to evidence from a forensic structural engineer about the cause of the damage.
Therefore, based on the information provided, it has not been shown that the damage was
proximately caused by the earthquake, construction work or combination of both, or other
sudden and accidental cause. Rather, it is more likely than not that the damage was due to
excluded factors of: normal settling, heaving, shrinkage, or expansion in buildings,
foundations/footings, together with faulty or defective workmanship, design or specification.
2.2 Why is the outcome fair?
The outcome is fair because the insurer has established, on the balance of probabilities, that
the damage was caused by factors excluded by the policy. Accordingly, it would not be fair to
require the insurer to cover the damage.
Determination | Case number: 1018953 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.