Home / IAG / Determination 1014935

Determination 1014935

Storm damage claim - liability limited to 2% of repairs

FirmIAG
Decided2024-05-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,299
Non-financial loss—
Amount claimed$143,429
SourceAFCA PDF

Summary

The complainant claimed storm damage to his holiday home and sought the full $143,429 builder quote. AFCA found most damage pre-existing and maintenance-related, so it ordered cash settlement of 2% of the quote plus a 15% contingency uplift totalling $3,298.86.

Most of the damage was pre-existing and excluded under the policy, so the insurer's liability is limited to the storm-related 2% share.

Issues

Subjects and remedies

pay claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 1014935 Financial firm Insurance Australia Limited Determination | Case number: 1014935 Page 2 of 6 Case number: 1014935 28 March 2024 1 Determination overview 1.1 Complaint The complainant and his wife hold a home building policy with the financial firm (insurer) covering their holiday home (insured property). On 27 February 2023, the complainant lodged a claim for damage to the insured property caused by a storm event on or about 16 October 2022. The insurer has partially accepted the claim. It accepts while rainwater ingress would have entered due to the rainfall on and around 16 October 2022, the repairs required prior to and after the storm event will be the same in terms of the methodology and. In line with building consultant ‘CE’s report, the insurer has offered to cover 2% of the cost of repairs. The insurer says the complainant has not established any additional loss because of the claimed storm event. The complainant disagrees. He believes all the damage was caused by a single storm event and is seeking full acceptance of the claim based on a $143,429 repair quote from builder ‘SB’ . 1.2 Issues and key findings Is the insurer ’s assessment of its liability unde r the policy reasonable? Yes. The insurer’s assessment of its liability and associated claim settlement offer is fair and consistent with the terms of the policy. It is most likely the majority of the damage to the insured property is due to maintenance related issues and has occurred over an extended period of time, prior to inception of the policy. Why is the outcome fair? The outcome is fair because it is based on the information from the parties and policy provisions. There is no dispute the policy was incepted around four weeks prior to the storm. The information shows it is most likely the majority of damage is due to circumstances that are excluded under the policy. 1.3 Determination This determination is in favour of the insurer. The insurer ’s assess ment of its liability under the policy is reasonable. Within, 21 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to arrange payment of $2,868.58 to the complainant. This is to be increased by a further 15% ($430.28) to allow for contingencies and the risk of arranging the works. Determination | Case number: 1014935 Page 3 of 6 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability reasonable ? Yes. The insurer’s assessment of its liability and associated claim settlement offer is fair and consistent with the terms of the policy. It is most likely the majority of the damage to the insured property is due to maintenance related issues and has occurred over an extended period of time, prior to inception of the policy. The policy covers the insured property against accidental loss or damage The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. Complainant has established a claimable loss. The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. The policy covers accidental damage caused within the period of insurance. In the absence of a policy definition for accidental damage, it is accepted that this refers to loss or damage that is unexpected and unforeseen. With respect to the policy, the loss or damage must have occurred within the period of insurance. There is no dispute the complainant has shown, on balance, the insured property did suffer loss or damage that triggers cover under the policy. The dispute relates to the extent of loss or damage to which the policy responds. Information from the consultants supports t he insurer’s position I am satisfied the available information supports the insurer’s assessment of its liability under the policy. The complainant has not provided any persuasive information in support of his position that all the damage to the insured property is covered under the policy. The complainant has provided one repair quote dated 1 February 2023 from SB in the amount of $143,429. This repair quote does not provide any comment or opinion from SB which assists in establishing the proximate cause of the damage. It also does not include any supporting information in the form of but not limited to photos, manufacturer recommendations, building standards, codes or weather data. The insurer relies on expert reports from builder U, leak detection and roofing expert NL and CE. Having considered these reports, I am satisfied the opinions of these consultants regarding the condition of the insured property is reasonably consistent. I find the information from CE to be the most persuasive, informative and supported by information including weather data, correct building standards and photos. CE reported there was no storm damage to the roof and no storm created openings. It observed a large amount of leaf debris and overgrown vegetation in the box gu tters and evidence of corrosion to roof sheets and guttering. CE says the build-up of debris has Determination | Case number: 1014935 Page 4 of 6 restricted water flow during rainfall. Gutters have then overflowed and caused internal water ingress damage. CE, however, believes although some water entry would have occurred during the claimed rainfall event, most of the damage was pre-existing. CE found the roof pitch does not comply with the manufacturer’s minimum pitch requirement of one degree for ‘ Kliplok® ’ roof sheets which has been applicable since 1963. CE estimates the roof sheets were installed around 1975. CE also says the rear deck floor was severely deteriorated and the damage was typical of long term water ingress. CE observed there was no guttering servicing the deck, meaning all runoff from the deck roof fell directly onto the exposed timers. Similarly, with respect to the jetty, CE considers that the damage observed is typical of timbers in close proximity to water and full-time exposure to the elements. CE considers the damage is typical of general age, wear and tear and is not the result of a one-off storm event. CE says inside the home, the extent of the staining, discolouration and deterioration of the timber veneered plywood sheet wall linings and ceilings typically indicates long-term, pre- existing water damage. CE noted evidence of previous attempted repairs to ceilings and the vanity unit in the bathroom showed long term water damage (swelling). In its supplementary report, CE provides clarification on its opinion that possibly only 2% of the damage noted could be linked to the storm. CE says in its professional position 98% of damages have been assessed as unrelated to the storm. The methodology and quantum of repairs required prior to and following the storm remains unchanged i.e. the repairs required following the storm are equivalent to repairs required prior to the storm. Majority of damage is pre-existing and not covered under the policy I am satisfied the insurer has shown that majority of the damage to the insured property is pre-existing and occurred before inception of the policy. I accept CE admits is apportionment of claim related damage is not based on exact science, but rather is based on its experience. I am satisfied CE’s findings are persuasive and consiste nt with the available information. In the absence of any information to the contrary, I am satisfied is it fair to accept CE’s opinion as the basis of assessing the insurer’s liability under the policy. Accordingly, I accept the insurer’s liability is limi ted to 2% of the cost of repairs. I note the insurer says it is prepared to arrange for U to provide a scope of works and repair quote representing 2% of the damage noted to the insured property. However, I believe the insurer has had adequate time an opportunity to obtain this information. In the interest of preventing further delay and to bring this complaint to conclusion, I am satisfied that it is reasonable that the insurer cash settle the complainant based on 2% of SB ’s quote. Accordingly, within 21 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to arrange payment of $2,868.58 to the complainant. This is to be increased by a further 15% ($430.28) to allow for contingencies and the risk of arranging the works. Determination | Case number: 1014935 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant sections of the policy wording What we will not pay for We will not cover your buildings and your contents for any accidental loss or accidental damage caused by:  […]  rust, corrosion, gradual deterioration, depreciation, wear or tear  […]  a defect in an item, faulty workmanship, structural defects or faulty design Determination | Case number: 1014935 Page 6 of 6 ... What Section 1 and Section 2 of the policy do not cover We will not pay claims for loss, damage or liability arising from:  […]  any event that does not occur within the period of insurance ... What you are required to do for us  […]  You must take reasonable precautions to prevent anything which could result in a claim under this policy. …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.