Denial of three claims (collapsed ceiling, leaking shower base, earthquake/main bathroom leak), settlement scope for resultant damage, and claims handling
Text of the determination
Determination
Case number 1012041
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 1012041 Page 2 of 13
Case number: 1012041 27 March 2024
1 Determination overview
1.1 Complaint
This complaint relates to three claims by the complainants under their home and contents
insurance policy held with the financial firm (insurer), for damage to the insured property.
The claims are for collapse of an internal ceiling (claim one), leaking shower base (claim two)
and earthquake damage to the property (claim three).
The insurer denied the claims one and three for the collapsed ceiling and earthquake
damage. It says that the complainants have not established a loss which is covered by the
policy on either claim.
The insurer accepted claim two for the resultant damage from the leaking shower base,
however the parties disagree on the settlement for the damage.
The complainants say while they don’t know what has caused the damage at their property,
some event has occurred, and they want the insurer to accept the claim.
1.2 Issues and key findings
Is the insurer ’s assessment of the three claims fair?
Claim one - collapsed ceiling
Yes. Given the exchanged material the insurer is entitled to rely upon the terms and
conditions of the policy to deny the complainant’s claim.
Claim two – leaking shower base
The insurer partially accepted claim two. However, t he insurer’s settlement offer does not
cover all the damage identified by its own expert. The insurer is required to increase its offer
to include all the damage caused by the ensuite shower leak.
Claim three - earthquake damage
No. The exchanged material shows damage to the main bathroom is covered by the policy.
The insurer has not established any policy exclusions apply and therefore it is not entitled to
deny the claim.
Did the insurer mishandle the claims?
Yes. The insurer’s claims handling and communication with the complainants was very poor
leaving them confused about the claims process and causing delays in the process.
I consider payment of $2,000 compensation for non-financial loss is warranted in the
circumstances.
Why is the outcome fair?
Where the complainant has not shown the loss or damage is covered by the policy it would
not be fair to require the insurer to accept the claim.
Determination | Case number: 1012041 Page 3 of 13
Likewise, where the damage has been caused by an insured event and the insurer has not
shown any exclusions apply it is fair to require the insurer to accept the claim. The insurer
must accept the claim for all damage caused by the insured event.
Where the insurer’s conduct has caused delay and inconvenience to the complainants it is
fair that it pays them compensation for non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainants.
Should the complainants accept this determination, the insurer is to settle the complainant’s
claims two and three as detailed in section 2.1 of this determination.
Determination | Case number: 1012041 Page 4 of 13
2 Reasons for determination
2.1 Is the insurer ’s assessment of the three claims fair?
Claim one – collapsed ceiling
Yes. Given the exchanged material the insurer is entitled to rely upon the terms and
conditions of the policy to deny the complainant’s claim.
Claim two – leaking shower base
The insurer partially accepted claim two. However, the insurer’s settlement offer does not
cover all the damage identified by its own expert. The insurer is required to increase its offer
to include all the damage caused by the ensuite shower leak.
Claim three – earthquake damage
No. The exchanged material shows damage to the main bathroom is covered by the policy.
The insurer has not established any policy exclusions apply and therefore it is not entitled to
deny the claim.
Coverage of the policy
The complainants ’ home and contents insurance policy provides cover for loss or damage at
the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This
means that not all loss and damage is automatically covered. Rather, only loss and damage
caused by an insured event, during the period of insurance and subject to the conditions,
limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained
within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainants. Therefore, the
insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and
exclusions, to determine its obligations to the complainants.
The policy provides cover for loss or damage as a result of an earthquake or tsunami.
The policy also provides cover for storm and escape of liquid.
Page 9 of the PDS details the storm cover:
Storm, rainwater, flood or wind
Loss or damage as a result of
Storm (including named cyclone)
Rainwater
Flood, or
Wind.
We won’t cover
Water entering your buildings:
Determination | Case number: 1012041 Page 5 of 13
…
because of a structural defect, faulty design or faulty workmanship
…
Page 28 of the PDS details the water or liquid damage cover
Water or liquid damage:
Loss or damage caused by water or liquid escaping from:
- A fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain
- A bath, basin, sauna, spa, shower base or shower wall, sink, toilet or tiled
floor that has drainage holes
…
We won’t cover
Loss or damage caused by water or liquid entering your buildings:
- Through an opening made for any building renovation or repair work
- Because of a structural defect, faulty design or faulty workmanship
The policy also contains a number of general exclusions that apply to all cover. These
include:
• wear, tear
…
• defect, structural fault, design fault or faulty workmanship;
…
• gradual deterioration due to action of … atmospheric or climatic conditions
It is accepted insurance law that the complainants carry the initial onus to establish, on the
balance of probabilities (that is, more likely than not), a loss which is covered by the terms
and conditions of the policy.
Once the complainants have established a loss which is covered under the policy, the onus
transfers to the insurer to establish the application of a condition, limitation or exclusion upon
which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Complainants lodged three claims with the insurer
The complainants say they noticed damage to several parts of their home in about January
2023 as follows:
the ceiling of their main living room started to collapse in January 2023
both showers started to leak
cracking and subsidence to the side path
cracking in mortar and brickwork
cracking to the roof tiles causing water damage to the garage ceiling
black mould in numerous wall cavities.
Determination | Case number: 1012041 Page 6 of 13
The complainants say they aren’t sure what the cause of damage to their home is, but that
there has clearly been some event to cause all this damage at the same time.
The complainants lodged three claims with the insurer for the damage to their home.
Claim one
The complainants lodged a claim with the insurer on 23 January 2023 after they heard a
cracking noise and noticed the ceiling on their lounge room start to drop.
Claim two
The complainants lodged a claim on 28 January 2023 for damage caused by a leaking
shower base.
The insurer accepted claim two for the resultant building and contents damage to the walk-in
robe caused by the leaking shower base.
Claim three
The complainants lodged a third claim on 25 May 2023 for all the damage previously claimed
for in claims one and two, plus all the damage that had not previously been claimed but
identified in the engineer’s report .
The complainants say they were advised by the insurer to lodge this claim, and that they did
not advise the insurer that they thought an earthquake had caused the damage.
Circumstances of the loss and claim – claim one
On receipt of claim one, the insurer engaged builder BB to report on the damage to the
lounge room ceiling. BB inspected the property on 27 January 2023. BB made the following
observations:
there has been no water entry into the ceiling cavity
failure of the fixings has caused the plaster to drop in some sections which is causing
weight for the remaining ceiling
the dam age appears to be caused from general wear and tear of the glue fixings over
time.
The insurer then engaged engineer ES to report on the cause of damage. ES inspected the
property on 14 February 2023 and provided a report dated 10 March 2023. ES considered the
ceiling had failed due to poor installation of the plasterboard lining due to:
excessive spacing of some of the adhesive daubs and
the distance between screw fixings not being uniform and too close to adhesive glue
daubs contrary to the building standard in place at the time the complainants’ house was
built.
ES says the poor installation was exacerbated by elevated levels of humidity due to a lack of
sarking underneath the roof tiles.
Based on the report from ES the insurer denied claim one and says the damage was found to
be a result of faulty workmanship and not from an insured event.
The complainants say they do not know what caused the ceiling to collapse. They say it might
have been caused by an earthquake, a storm, subsidence, or something else. The
complainants also say they are not experts and therefore cannot say for certain what caused
the damage. The complainants have not provided any information about the earthquake or
storm that may have caused the damage.
Determination | Case number: 1012041 Page 7 of 13
The complainants dispute the experts’ findings relating to the poor installation of the
plasterboard lining and say they have been in the roof space to assess the spacing
themselves. The complainants have provided photographs of their own measurements
showing in parts of the ceiling the adhesive daubs are the recommended 200mm apart.
The complainants engaged their own expert OI. It is unclear what OI ’s qualifications are,
however the purpose of the report is to identify defects at the property.
OI noted the collapsing ceiling in the lounge room and made the following comment:
I don’t think an earthquake can be ruled out as the cause of the roof dropping or if
is bad workmanship. Only way to work that out would be to drop ceiling and if
ceiling has been screwed & glued properly.
Following the lodgement of claim three by the complainants, on 16 June 2023, ES provided a
supplementary report considering whether the damage might be the result of an earthquake.
ES confirmed its previous conclusion has not changed. ES says the claimed damage is not
related to or exacerbated by an earthquake.
The complainants have the initial onus to demonstrate a loss that is covered by the terms and
conditions of the policy.
There is no doubt there is damage, but it is accepted insurance law and consistent with the
coverage provided by the policy, that the complainant must establish that the damage was
caused by an insured event, as detailed within the terms and conditions of the policy.
Complainants have not shown, on balance, ceiling collapse is covered by the
policy
I am not satisfied the complainants have met their onus to establish a loss covered by the
terms and conditions of the policy. The report from OI does not establish a cause of damage
for the ceiling collapse. He says he cannot rule out earthquake, which is a loss covered by the
policy, however he gives no reasons or analysis as to why earthquake is the cause of
damage. OI also acknowledges the possibility that faulty workmanship has caused the
damage.
I am satisfied that the report from ES is thorough, logical, compelling, and supported by
helpful photographs.
The photographs from the complainants showing some parts of the roof have the glue at the
recommended spacing are not inconsistent with the ES report, which says only some of the
glue daubs exceed the maximum specified distance.
In my view, ES has established, on balance, that the damage to the ceiling has been caused
by a failure of the fixings due to incorrect installation.
I am satisfied that the policy does not provide coverage for this damage.
Further the cause of the damage, design fault or faulty workmanship, is specifically excluded
from coverage under the terms and conditions of the policy.
The result is that the insurer is entitled to deny the c omplainants’ claim.
Circumstances of the loss and claim – claim two
The insurer accepted the complainants’ second claim for damage caused by their leaking
shower. This claim relates to the compl ainants’ ensuite bathroom only, the complainants say
Determination | Case number: 1012041 Page 8 of 13
the shower in their main bathroom is also leaking but they have not yet lodged a claim for that
damage.
The insurer appointed a plumber BR to inspect the damage. BR carried out leak detection
testing on 6 February 2023 and reported:
a static test carried out to shower base failed and had water leaking out of corner of robe
adjacent to shower
a water leak was detected from the right hand side of shower screen during spray testing
missing grout was located during inspection of shower base
there is a cracked wall tile alongside the shower niche with possible water entry
there is water damage to the skirting in the spare bedroom adjacent to the ensuite.
The insurer engaged restorer FRA who removed the carpet which was so affected by mould it
was not salvageable.
The insurer’s engineer ES also reported on the cause of damage to the shower. ES says:
The water ingress damage to rooms adjacent to both the bathroom and master
bedroom ensuite has been caused by cracked floor tiles in the shower and water
ingress that has breached the waterproofing.
ES also identified the following resultant damage from the leaking shower to the room
adjacent to the ensuite:
water damage and discolouration to the wall lining and skirting boards on the external
corner of the shower
delamination and swelling of the timber kickboard of the vanity
partial carpet removal in the walk-in robe
hairline crack in the slab where the carpet was removed
discolouration to the wall lining and skirting board.
I am satisfied the leak detection testing from BR conclusively shows the shower was leaking.
It is not in dispute that this is a type of loss covered by the policy, and the insurer has
accepted the claim. The policy covers the resultant damage only, not the claim for the
damage to the shower. Therefore, the insurer is required to repair the resultant damage only,
not the shower itself.
The insurer obtained a quote from builder BR for $925.05 for the following works to repair the
resultant damage:
replace profile MDF skirting to rear RH corner of robe
supply new skirting (MDF)
paint rear RH wall around robe units – 4m2 and paint new skirting board.
The insurer also obtained a quote for replacement of the damaged carpet for $859.52.
The insurer offered to settle the complainants based on the two quotes plus a 15% uplift for
contingencies due to the significant amount of maintenance required at the property.
Accordingly, the cash settlement offered for the agreed repairs is $1,555.25.
The complainants have not accepted the offer. They have provided four quotes for a greater
range of works than those included in the insurer’s scope of works that form the basis of its
offer. The quotes are as follows:
MS quote to re tile the shower for $6,685
Determination | Case number: 1012041 Page 9 of 13
SC quote to demolish and rebuild the bathroom and replace the collapsed ceiling dated 7
December 2023 for $41,525
WC to demolish and rebuild the bathroom and replace the ceiling for $33,854.26
WC to dated 15 December 2023 for $2,354.
Some of the repairs detailed in the MS, SC and larger WC quotes are not covered by the
policy.
The complainant says the WC quote of 15 December 2023, which does cover the resultant
damage from the ensuite leak, does not include repair to the water damaged walls or
replacement of the damaged carpet. I also note the WC quote is not itemised.
The complainants also say that due to the water damage that the house received following
the events, that there is mould present in the house.
Restorer FR did mould remediation work at the property on 6 February 2023. The
complainants say there is still mould present, however they have not provided information to
support this. I am not satisfied the complainants have shown, on balance, there is resultant
mould damage at the property.
Insurer’s settlement offer does not include all resultant damage
As stated, the ES report says the water damage to rooms adjacent to the master bedroom
ensuite has been caused by cracked floor tiles in the shower and water ingress that has
breached the waterproofing.
The BR quote from the insurer does not cover all the resultant water damage from the shower
leak identified by engineer ES. The insurer has not provided any explanation for why it is
entitled to exclude some of the resultant damage identified by ES.
Therefore, I do not consider the insurer’s settlement offer to be fair and reasonable.
The insurer is required to settle claim two by payment to the complainants of the cost to repair
the following damage:
water damage and discolouration to the wall lining and skirting boards on the external
corner of the shower
delamination and swelling of the timber kickboard of the vanity in bathroom
hairline crack in the slab where the carpet was removed in master bedroom
discolouration to the wall lining and skirting board in master bedroom
swollen timber skirting board in bedroom 2
hairline cracks between timber skirting and wall lining in bedroom 2.
The insurer has provided a separate quote for $859.82 to replace the damaged carpet.
The policy allows the insurer to decide how the claim is settled. The insurer says there is a
significant amount of maintenance required at the property before the repairs for accepted
damage can be completed. The information shows there is extensive damage to the shower
area not covered by the policy, and in these circumstances the insurer is entitled to cash
settle the claim.
I consider the insurer’s offer to cash settle the claim for the carpet in the wardrobe (plus 15%
uplift) to be fair and reasonable.
Should the complainants accept this determination, they are to provide the insurer with a
reasonable quote for repair of the damage listed above.
Determination | Case number: 1012041 Page 10 of 13
Within 14 days of receipt of the quote the insurer is to cash settle the complainants for that
amount, plus $859.82 for the carpet, plus 15% uplift to compensate them for the transfer of
the risk of repairs and the loss of the warranty on the works.
Circumstances of the loss and claim – claim three
The complainants lodged the third claim for damage caused by earthquake for all the damage
listed in the previous claims and the damage identified in the ES report.
They say they were advised to do so by the insurer. They say they don’t claim an earthquak e
was the cause of the damage at their property, but that it might have been caused by an
earthquake, a storm, subsidence or something else. They say the insurer has misrepresented
that they claimed the damage was caused by an earthquake.
The transcript of the claim lodgement has been exchanged for this complaint. The transcript
also shows that one of the complainants says several times that he is not sure what has
caused the damage but suggests the possibility of an earthquake or subsidence of the land.
During the claim lodgement conversation, the complainant advised that the main bathroom
was leaking, and this was not considered under the first two claims.
In response to claim three the insurer appointed assessor SW who attended the property on 5
June 2023. The report states that the claim loss type is for earthquake and ‘ other. ’
SW says the complainant pointed out the resultant damage for the main shower. He says:
The insured then noticed that the main bathroom shower recess was leaking into
the daughter’s bedroom as the carpet was damp. He informed that he was
advised not to submit a claim for this particular event that someone would
undertake an inspection.
The insurer sent a letter to the complainant on 23 July 2023 advising that claim three had
been refused. The insurer says it relied on the report from engineer ES of 10 March 2023 to
decline the claim.
The insurer ’s letter said:
After reviewing the information supplied in the engineer’s report, the damage was
not found to be a result of an earthquake (or any insured event).
Information shows, on balance, main bathroom shower base leak
The ES report shows there is water damage to the complainant’s home in the main bathroom
and the rooms adjacent to the shower in the main bathroom. The ES report notes the
following resultant water damage to the bathroom, bedroom 4 and passageway that backs
onto the main bathroom:
Bedroom 4
partial carpet was removed against the shared bathroom
discolouration of skirting and plasterboard
Bathroom
water damage and discolouration to plaster and skirting boards outside the shower
Passageway
Determination | Case number: 1012041 Page 11 of 13
swollen timber floor and skirting boards against the wall of the main bathroom.
I am satisfied the complainants have shown, on balance, there is a leak from the shower base
in the main bathroom. The information shows water damage to the surrounds of the main
bathroom, which supports that the shower is leaking.
The insurer has not established that any policy exclusions apply to the damage, and it
accepted the claim for very similar resultant damage in the same circumstances to the
ensuite bathroom in claim two. Therefore, the insurer is not entitled to deny the claim for the
resultant damage from the leaking shower in the main bathroom.
As stated, the policy does not cover the damage to the shower base itself, only the damage
resulting from the leak.
For reasons outlined above I consider the insurer is entitled to cash settle the claim for this
damage.
Should the complainants accept this determination, they are to provide the insurer with a
reasonable quote for repair of the damage listed above.
Within 14 days of receipt of the quote the insurer is to cash settle the complainants for that
amount plus 15% uplift to compensate them for the transfer of the risk of repairs and the loss
of the warranty on the works.
2.2 Did the insurer mishandle the claims?
Yes. The insurer’s claims handling and communication with the complainants was very po or
leaving them confused about the claims process and causing delays in the process.
I consider payment of $2,000 compensation for non-financial loss is warranted in the
circumstances.
AFCA can award up to $5,400 compensation for non-financial loss
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complain ant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a
normal degree of inconvenience during a claim.
Insurer mishandled claim for resultant damage from leak in main bathroom
The insurer’s engineer ES identified the damage to the main bathroom in his report of 10
March 2023. This damage was not accepted by the insurer on the second claim despite being
almost identical to the damage it accepted resulting from the ensuite shower leak. It appears
the insurer did not consider whether the damage to the main bathroom was covered by the
policy.
The complainants were advised to lodge a third claim.
The insurer failed to address the damage from the main bathroom leak in the third claim, and
the complainants were left with the impression they needed to lodge a fourth claim for this
damage to be assessed.
Determination | Case number: 1012041 Page 12 of 13
I consider the lack of clarity around the process and the insurer’s failure to turn its mind to
whether the damage identified by ES from the leak in the main bathroom shower was covered
by the policy during the earlier claims added to the time taken to resolve the complaint and
the stress experienced by the complainants.
During this delay the complainants have been left with no usable shower in their home, which
no doubt has caused a great deal of inconvenience to the complainants and their family.
I consider payment of $2,000 compensation for non-financial loss is warranted in the
circumstances.
2.3 Why is the outcome fair?
Where the complainant has not shown the loss or damage is covered by the policy it would
not be fair to require the insurer to accept the claim.
Likewise, where the damage has been caused by an insured event and the insurer has not
shown any exclusions apply it is fair to require the insurer to accept the claim. The insurer
must accept the claim for all damage caused by the insured event.
Where the insurer’s conduct has caused delay and inconvenience to the complainants it is
fair that it pays them compensation for non-financial loss.
Determination | Case number: 1012041 Page 13 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.