Claim for cracking damage to insured building declined as caused by long-term differential foundation movement rather than an insured event

FirmSuncorp Group
Decided2024-02-22
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The landlord policyholder claimed for storm and escape of liquid damage to a building; the insurer declined, attributing cracking to long-term foundation movement. AFCA found for the insurer.

Expert reports and pre-storm inspection reports showed the damage pre-existed and was caused by gradual ground movement, which is excluded, so the complainant did not establish an insured event caused it.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 1011287 Financial firm AAI Limited Determination | Case number: 1011287 Page 2 of 7 Case number: 1011287 22 February 2024 1 Determination overview 1.1 Complaint The complainant holds a landlord insurance policy (policy) with the financial firm (insurer) and lodged a claim for storm damage to the insured building said to have occurred on 11 May 2022. The insurer has declined the claim and says the damage is due to long term differential foundation movement and not due to the said storm or any of the listed insured events. Alternatively, if it were accepted the damage is due to an insured event, the insurer says it falls under the policy exclusions specified in the product disclosure statement (PDS). 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available information supports the insurer’s decision to decline the claim. The damage to the insured building is not due to one or more of the listed insured events, but rather is consistent with long term movement within the foundation soils, which is not covered under the policy. Why is the outcome fair? The outcome is fair as it is based on the information provided by the parties and relevant policy provisions. The damage has been shown to have been occurring from before the claimed storm event and is consistent with long term ongoing damage. It would be unfa ir to require the insurer to cover this damage given it is not covered under the policy. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim and is not required to take any further action under the policy. Determination | Case number: 1011287 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The available information supports the insurer’s decision to decline the claim in line with the policy. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Storm ’ and ‘ Escape of fluid ’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The complainant needs to show the damage triggers cover under the policy The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. I note although the claim was lodged for storm damage, the complainant also says the cracking damage to the insured building is due to an escape of liquid, this being an insured event. The complainant says investigations found a crack in a sewer pipe which he believes is caused by roots. The complainant says the damage has occurred within 72 hours of the damage to the pipe. The complainant acknowledges the insured building presented with cracking (movement) damage prior to the claimed storm event. However, he says this was only minor damage and that the damage has only recently significantly increased and is covered under the policy. The insurer does not dispute that an escape of liquid event occurred at the insured address during the period of insurance. However, the insurer says the damage to the insured building has not been shown to, on balance, be due to that event or any other event or incident to which the policy responds. Consultants investigations do not support the complainant’s position The insurer appointed building consultants ‘R’ to investigate the cause and extent of the building damage. In its report dated 31 March 2023, R confirmed movement cracks to walls and ceilings of the building and the slab appeared to be dropping. R recommended the appointment of an engineer to investigate. The insurer appointed engineering consultant ‘J’ who has provided a report dated 20 April 2023. J confirms cracking damage throughout the whole house and that the tenants advise this was present when they moved in some years prior and they have noticed it has been getting worse since. J says the amount of rainfall that the insured property experienced during the claimed storm was less than a 1 in 1.58-year equivalent event and is not the cause of the damage. It notes the region was drought declared and therefore subject to a prolonged drying period causing the high clay content to shrink leading to long term ground movement. Determination | Case number: 1011287 Page 4 of 7 J says the clay soil is slow to absorb moisture and to be affected by it, usually requiring weeks or months of prolonged rain or flooding. This is because as the top layer of clay swells and expands as it absorbs moisture, it compresses the soil and forms a plug that makes it difficult for the moisture to penetrate to lower depths. This means that the duration of the reported rain event was not sufficiently long to affect the founding soil in any significant way. Any effect would have been very minor and would not have occurred within 72 hours of the rain event. J concludes the damage is indicative of long- term differential foundation settlement and not due to a single event. J recommended a plumber to investigate and eliminate broken pipes as a possible contributing factor. R has provided a plumbing report which includes CCTV investigations. The attending consultant noted the wet system (stormwater tank) had gone dry showing it failed but there were no evident cracks or breaks. R did locate a crack to a sewer pipe with roots starting to penetrate. R says with the present evidence there may be water draining slowly from the stormwater system underground but not presenting to the surface. The insurer provided R’s plumbing report to the engineers for review. In its report dated 22 June 2023, J says after reviewing R’s CCTV report, the damage and movement cannot be attributed to pipe leak related issues. The cracking and movement noted throughout the dwelling is attributed to long-term foundation settlement which has been exacerbated by the prolonged dry period. The complainant has not provided any expert reports, however, he has provided two property routine inspection reports dated 25 January 2022 and 14 June 2022. The first being before the claimed storm and the other after the storm. I am satisfied these reports, and in particular the 25 January 2022 report, show the insured building presented with movement cracking damage in several locations i.e. before the storm event giving rise to the claim. Insurer is entitled to decline the claim I am not satisfied the complainant has been successful in establishing, on balance, it is most likely the cracking damage to the insured building is covered under the policy. Rather, it is more likely than not, the damage is consistent with occurring and gradually increasing over several years through differential foundation movement. The various consultants’ reports are consistent in showing the damage has been present from before the claimed storm event and has not occurred within 72 hours of the possible minor escape of liquid. It is possible the damage has been exacerbated by recent storm events, but this is not the proximate or dominate cause for the damage. Given the location of the stormwater tank (system), the results of the floor level survey and clay-based foundation soils. I accept the engineer’s opinion that the damage is not consistent with a single insured event (storm or escape of liquid) and/or that it is possible for the damage to have occurred within 72 hours of such an event. I acknowledge the complainant’s opinion that the damage that pre -existed the storm event and that which is now evident are due to two separate events and the insurer is seeking to mix these events. I am not satisfied this is a reasonable position or that there exists any persuasive information to support this position. Rather, it is fair to accept the damage has been occurring over an extended period due to ongoing differential foundation soil movement, and which is excluded under the policy. Accordingly, the insurer is entitled to decline the claim in line with the policy. Determination | Case number: 1011287 Page 5 of 7 2.2 Why is the outcome fair? The outcome is fair as it is based on the information provided by the parties and relevant policy provisions. The damage has been shown to have been occurring from before the claimed storm event and is consistent with long term ongoing damage. It would be unfair to require the insurer to cover this damage given it is clearly not covered under the policy. Determination | Case number: 1011287 Page 6 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach i s based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions Things we don’t cover Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  […] ‘Escape of liquid’ page 50; Determination | Case number: 1011287 Page 7 of 7 Escape of liquid […] We do not cover  […] loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, escape of liquid and not because of erosion, structural fault or design fault;