Home / RACQ / Determination 1010813
Determination 1010813
Partial denial of storm damage claim for retaining wall excluded under policy, and delay in deciding the claim
Summary
The complainant's retaining wall failed after heavy rain and the insurer declined that part of the claim as retaining walls are excluded. AFCA upheld the decline but found the insurer breached the Code on timing and required it to pay the $250 offered for non-financial loss.
The wall met the policy's defined term 'retaining wall' as it was not part of the house, so was excluded and s35 ICA did not apply, while the insurer's delay breached the Code warranting $250.
Issues
- Claim denial primary · not upheld“The wall is a retaining wall within the meaning of the policy and is therefore not covered.”
- Claim amount dispute secondary · not upheld“insurer's 50% fence contribution accords with policy; fresh quotes required for accepted works with 20% contingency”
- Delay secondary · upheld“The insurer failed to comply with its obligations under the Code and took too long to reach its decision to deny the claim.”
- Product terms interpretation secondary · not upheld“not satisfied the wall forms 'part of' the building in which the complainant lives; s35 ICA does not apply”
Subjects and remedies
home or building damagenatural disasterpay non financial lossreassess claim
Related
Text of the determination
Determination
Case number 1010813
Financial firm RACQ Insurance Limited
Determination | Case number: 1010813 Page 1 of 11
Case number: 1010813 14 November 2023
1 Determination overview
1.1 Complaint
The complainant holds a Home and Contents Insurance policy issued by the financial firm
(the insurer) on 22 November 2021.
On 28 February 2022, the complainant lodged a claim for damage to the insured premises
which was identified on 27 February 2022 following heavy rains. At the time, the claim was
described as:
Retaining wall failure due to water from the storm and part of our land has run into
our neighbour‟s yard. Fence and retaining wall leaning and encroaching on
neighbour‟s land.
The insurer arranged for an assessor to inspect the property on 4 April 2022 and on 22 June
2022 advised the complainant the claim was being partially denied due to the policy not
covering retaining walls.
The complainant says the wall should be covered and the decision took too long to arrive at,
in breach of the General Insurance Code of Practice (the Code). He seeks to have the claim
fully paid and compensation for the delays.
1.2 Issues and key findings
Has the insurer appropriately assessed the claim?
Yes. The wall is a retaining wall within the meaning of the policy and is therefore not covered.
The additional aspects of the claim have either been accepted by the insurer, or liability has
been appropriately limited.
Did the insurer cause undue delays in the claims handling process?
Yes. The insurer failed to comply with its obligations under the Code and took too long to
reach its decision to deny the claim.
Why is the outcome fair?
The complainant has not established the claims he has made fall under the policy, or that he
suffered any undue inconvenience or loss from the time taken by the insurer to reach its
decision to decline. It would not therefore not be fair in all the circumstances to award direct
loss compensation, but the insurer‟s offer is appropriate given its breach of the Code.
1.3 Determination
This determination is in substantively in favour of the insurer. Within 7 days of being advised
the complainant accepts this determination, it is required to pay the complainant the $250 it
offered the complainant in non-financial loss compensation.
Determination | Case number: 1010813 Page 2 of 11
Determination | Case number: 1010813 Page 3 of 11
2 Reasons for determination
2.1 Has the insurer appropriately assessed the claim?
Yes. The wall is a retaining wall within the meaning of the policy and is therefore not covered.
The additional aspects of the claim have either been accepted by the insurer, or liability has
been appropriately limited.
The policy terms are set out in the Product Disclosure Statement
The insurance contract agreed to by the parties is set out in the Product Disclosure Statement
(PDS). Relevantly, the PDS contains the clauses extracted in section 3.2 of this
determination.
‘Retaining wall’ is a defined term
Under the „Words with special meanings‟ section in the PDS, „retaining wall‟ is defined as:
A wall that is not part of the building you live in and is designed to hold back and
retain earth or water.
The complainant says the wall is attached to the building
The complainant says the retaining wall, a wooden base supporting the fence bordering the
property, is connected to the house.
He relies on the insurer‟s builder‟s report from Company A, dated 4 April 2022, which
contains a photograph titled „Left -hand side garden section is separating from house slab due
to excessive ground water causing subsidence and failure of retaining wall‟.
He says the retaining wall is part of the building he lives in as the retaining wall is attached to
the house slab.
The complainant has also provided an email opinion from a consulting engineer, Mr AM,
dated 28 January 2023. This opinion was based on Mr AM‟s desktop review of the
complainant‟s house plans and some house structural design documents the complainant
provided.
In the email opinion, Mr AM says:
The timber sleeper retaining wall is over one meter away from the house, and the
retaining height is also around one meter. Generally, it would not be subject to
any surcharge from the footing of the house, and structurally it would not be an
integrated part of the house.
As such, in most cases the builders would apply the timber sleeper retaining
walls, which would not last long but cheaper, as they realise their structural failure
would not compromise the safety of the houses.
There is a short return at the end, which connected to the house. Structurally this
small part is relevant to the house, and its failure could adversely affect the
stability of the footing and slab of the house.
Determination | Case number: 1010813 Page 4 of 11
The insurer says the definition has been met
The insurer accepts the retaining wall touches the slab, but says it is of the view the definition
of „retaining wall‟ has been met as the wall:
is located under the fence on the property
holds back soil and
has been damaged by saturation and loss of soil that it was designed to hold back.
The insurer relies on Company A‟s assessment after its inspection of the property (confirmed
in an email to the insurer on 22 November 2022) that the wall is not part of the building.
AFCA’s role is to make a decision about the policy wording
The complainant has suggested AFCA is not in a position to make any assessment of
whether the wall is part of the house or not as:
the retaining wall needed building approval and QLD law requires professional engineering
services to be used to obtain building approval
only a person registered with the Board of Professional Engineers of Queensland (BPEQ)
can provide such services
as AFCA is not registered with BPEQ it cannot provide professional engineering services
and
the determination of whether the wall is part of the house or not is a professional
engineering service.
I disagree. The Professional Engineers Act (QLD) 2002 defines professional engineering
services as:
professional engineering service means an engineering service that requires, or is
based on, the application of engineering principles and data to a design, or to a
construction, production, operation or maintenance activity, relating to
engineering, and does not include an engineering service that is provided only in
accordance with a prescriptive standard.
As I am not:
providing an engineering service or
engaging in a construction, production, operation or maintenance activity
I am satisfied I (and AFCA more broadly) am not providing professional engineering services
as defined in the legislation. My role is purely to provide a view on the correct interpretation of
the insurance policy wording.
The wall is not part of the insured premises
It is clear from the photographs provided and relied on by the parties, the wall normally
touches and is affixed to the house slab.
As the parties do not agree, I must interpret the wording of the policy having regard to
applicable legal principles. The general approach to doing so is to take the plain and ordinary
meaning of the words used.
Where terminology is used in a particular context but is ambiguous or capable of more than
one meaning, an interpretation should be given in line with the nature of the contract. This is
an objective, not a subjective, test.
Determination | Case number: 1010813 Page 5 of 11
The courts „do not easily accept that people have made linguistic mistakes, particularly in
formal documents‟. However, the worse the drafting of a particular clause, the more readily a
court will depart from its natural meaning.
I am not satisfied the retaining wall definition is capable of more than one meaning or
otherwise ambiguous. The natural and ordinary meaning of the definition would suggest the
retaining wall would need to have been an integral part of the construction of the house,
without which the house would be incomplete. This is supported by:
the footing and slab design plans, dated 13 November 2012, provided by the complainant
which show the retaining wall was to be added to the property after by others not involved
in the construction of the house and
Mr AM‟s analysis that, as a whole, the retaining wall is not an integrated part of the house
and only one small part could potentially affect the slab.
As a result, on balance, I am not satisfied the wall forms „part of‟ the building in which the
complainant lives.
Section 35 of the Insurance Contracts Act 1984 does not apply
In the alternate, the complainant has also said, in relation to the application of the Insurance
Contracts Act 1984 (the ICA), the complainant has also said:
The average person would not recognise the engineering aspects associated with
retaining walls and the impact of whether or not the retaining wall was covered by
the policy or not. The policy wording can therefore be considered ambiguous
contravening section 35(2) of the ICA. The claim should be paid under section
35(1).
Section 35 of the ICA sets out a requirement for insurers to notify an insured where their
cover deviates from that set out in the standard cover. If they do not do so, an insured can
have their claim paid by reference to this standard cover.
Section 35(1) applies if there is a “prescribed event” under a “prescribed contract”. Division 1
of the ICA refers to “prescribed contract” and a “prescribed event” as follows:
A prescribed contract is defined as “. . . a contract of insurance that is included in a class
of contracts of insurance declared by the regulations to be a class of contracts in relation
to which this Division applies”.
A prescrib ed event is defined as “. . . in relation to a prescribed contract, means an event
that is declared by the regulations to be a prescribed event in relation to that contract”.
If these conditions are satisfied, the insurer cannot refuse to pay the minimum amount
prescribed in the regulation unless s 35(2) is satisfied. Section 35(2) says s35(1) does not
apply if the insurer can prove that:
before the contract was entered into, the insurer clearly informed the insured in
writing (whether by providing the insured with a document containing the
provisions, or the relevant provisions, of the proposed contract or otherwise) or
[...]
The complainant‟s submission is simply it requires an engineer to determine if the wall is part
of the house or not, and therefore the insured was not in a position to be clearly informed
Determination | Case number: 1010813 Page 6 of 11
about whether the wall met the definition of a „retaining wall‟ or not prior to entering into the
contract.
However, in the Northern Territory Court of Appeal case of Marsh v CGU Insurance Ltd t/a
Commercial Union Insurance [2004] NTCA 1 , M J said:
Even though s35 is plainly beneficial legislation, a fair reading of s35(2) does not
warrant the conclusion that the result need go further than provide for the relevant
exclusion in the policy wording in clear and unambiguous language and in a
manner which a person of average intelligence and education is likely to have
little difficulty in finding and understanding if that person reads the policy in
question.
As noted above, the PDS is clear the policy does not cover „retaining walls‟ and the definition
is clear and unambiguous. I am not satisfied „part of‟ is sufficiently complex or technical an
assessment to enliven s35(2).
The insurer was permitted to decline this part of the claim
There appears to be no debate the wall is designed to hold back and retain earth. As I have
found it is not part of the building, I am satisfied both parts of the definition of „retaining wall‟ in
the PDS have been established.
On this basis, the insurer is entitled to decline this part of the claim.
As an associated claim, the complainant has also sought payment of a land survey and an
engineer design report.
Setting aside the complainant has only provided the quoted amounts and not demonstrated
these costs have been incurred, the relevant design work relates to the replacement of the
timber retaining wall with a concrete retaining wall along the surveyed boundary.
As this is not an item which is covered under the policy for the reasons set out above, I am
satisfied the costs in respect of these preparatory works should not form part of the claim.
Other matters raised
During the course of this complaint, the complainant has raised a number of other matters
which form part of the claim. These include claims for:
the full cost of the fence itself, on the basis it is not a boundary fence and the complainant
was liable for the full cost of the fence
tree and shrub replacement, delivery and re-planting
damage to doors
damage to the garden path and
a potential leak in the storm water pipe.
I note, during the course of the complaint, the insurer has accepted the claims for:
the trees and shrubs at $250 and further offered to review any quotes the complainant has
for replacement costs in excess of this figure and
the damage to the doors and
the damage to the garden path.
Subject to the analysis below, I am satisfied these issues have been appropriately resolved.
This leaves the fence and storm water pipe claims still in dispute.
Determination | Case number: 1010813 Page 7 of 11
On 22 June 2022, in line with the policy terms for a dividing fence, the insurer agreed to pay
for 50% of the fence as it lay along the boundary of the property. The complainant disputes
this as he says the fence does not lie on the shared boundary and therefore is not a dividing
fence.
There is little information on file to determine this difference. However, the Contour Survey
Plan dated 9 December 2012 which sets out the positions of the (then proposed) building and
retaining wall appears to have the retaining wall lie along the property ‟s boundary.
In the absence of information to the contrary, I am satisfied it is more likely than not (on the
available information), the fence lies along the boundary and the insurer‟s position on this
issue is in accordance with the terms of the policy.
With regard to the possible leak in the storm water pipe, the insurer has invited the
complainant to lodge a separate claim. I am satisfied it is fair in all the circumstances to treat
the claim for a potential leak in the storm water drain as being a separate claim, as this has
not been shown to be connected to the weather event of 27 February 2022.
There should be a revised set of quotes for cash settlement
The complainant says this claim has taken so long to resolve, the quotes relied on by the
insurer are not reflective of the current prices to remediate the damage.
I agree the insurer is currently relying on quotes from June 2022 in respect of the agreed
Scope of Works. In the circumstances, it would be fair for the insurer should obtain up to date
quotes for the accepted works and resubmit for processing in line with this determination –
including any revised amounts evidenced by the complainant for the cost of replacing the
trees and shrubs.
In the event the insurer cash settles the claim, a 20% contingency should be applied on the
revised quotes obtained to cover any additional unforeseen costs and the loss of the insurer‟s
guarantee of the works performed.
2.2 Did the insurer cause undue delays in the claims handling
process?
Yes. The insurer failed to comply with its obligations under the Code and took too long to
reach its decision to deny the claim.
The complainant says the insurer breached the Code
The complainant says the insurer did not meet the 10-business day deadline set out in
paragraph 76 of the Code for accepting or denying his claim. He says it took until 16 June
2022 for the insurer to provide the decline decision.
The February 2022 weather events were declared an Insurance Catastrophe
On 26 February 2022, the Insurance Council of Australia declared the Southeast Queensland
severe weather events in February 2022 to be an „Insurance Catastrophe‟.
Under the Code, paragraph 78 relevantly says:
In circumstances where:
Determination | Case number: 1010813 Page 8 of 11
a. your claim arises from an Extraordinary Catastrophe;
[…]
then within 12 months of receiving your claim we will tell you our decision in
writing. If we cannot make a decision within 12 months, we will tell you in writing
about our Complaints process.
The Code defines „Catastrophe‟ as:
Catastrophe means an event declared by the Insurance Council of Australia to be
a Catastrophe - for example fire, flood, earthquake, cyclone, severe storm, or hail,
resulting in a large number of insurance claims and involving multiple insurers.
And an „Extraordinary Catastrophe‟ as:
Extraordinary Catastrophe means a Catastrophe that is so significant in size or
magnitude or one that coincides with multiple other Catastrophes that the Board
of the Insurance Council of Australia declares it to be extraordinary.
The insurer did not meet its modified obligations under the Code
On the basis of the above declaration, I am satisfied the event giving rise to the complainant‟s
claim was declared a Catastrophe by the Insurance Council.
However, it was not declared an Extraordinary Catastrophe and therefore the insurer did not
have an extended period of 12 months to respond to the claim lodged with it on 28 February
2022.
The insurer has offered $250 in non-financial loss
The insurer acknowledged the complainant may have suffered stress and inconvenience due
to the delays in having this claim resolved. It offered $250 compensation for this non-financial
loss.
The complainant seeks $2,000 non-financial loss
The complainant has said the appropriate amount of non-financial loss is $2,000 and has
referred to AFCA Determination 867502 in support of his position.
However, the complainant in Complaint 867502 was awarded $2,000 in circumstances where
she suffered significant stress and inconvenience as a result of:
the insurer‟s handling of the claim, the delays and the lack of adequate coordination
between it and its trades
impacted health condition s, which also affected her partner‟s health conditions
an inability to have family and friends over and resulting isolation and
an inability to use the garage for their vehicle after it was repaired at a relatively high cost.
Accordingly, I am not satisfied Complaint 867502 is analogous as none of those factors are
present here and I am not satisfied the complainant has needed to bear more than the normal
degree of inconvenience experienced when a problem occurs.
Determination | Case number: 1010813 Page 9 of 11
However, in the circumstances, the insurer‟s offer of $250 is fair and reasonable.
2.3 Why is the outcome fair?
The complainant has not established the claims he has made fall under the policy, or that he
suffered any undue inconvenience or loss from the time taken by the insurer to reach its
decision to decline. It would not therefore not be fair in all the circumstances to award direct
loss compensation , but the insurer‟s offer is appropriate given its breach of t he Code.
Determination | Case number: 1010813 Page 10 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
What we cover as your home
We cover your home at the insured address shown on your Certificate of
Insurance. Your home includes everything in the following list but does not include
the things under the section „What we don‟t cover as your h ome‟.
You are covered for:
Buildings and structures
• The building you live in.
Determination | Case number: 1010813 Page 11 of 11
[…]
Outdoor items […]
• Sealed driveways, garden borders, bridges, paths, paving and playing surfaces,
up to 500m long in total.
• Fences, walls, and gates.
[…]
What we don’t c over as your home
We don‟t cover these things under your Home Insurance policy.
You are not covered for:
Building types
[…]
• Retaining walls.
• Fences, sheds, stables or other structures you use for agricultural or other
business purposes.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.