Summary

The complainant's home insurance water damage claim was only partly accepted because the damage came from a leaking shower recess. AFCA found in favour of the insurer.

The plumber's report showed the shower membrane failed, and the policy excluded liquid escaping from a shower recess, so the insurer's partial acceptance was fair.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 1010793 Financial firm Allianz Australia Insurance Limited Determination | Case number: 1010793 Page 2 of 4 Case number: 1010793 10 May 2024 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). She lodged a claim for water damage from her upstairs bathroom around February 2018. The insurer accepted resultant damage. It has now said this was done in error but is not seeking to withdraw from this position. The insurer denied liability for other damage being claimed for this event, including the bathroom itself. The complainant disputes this. She says the claim was accepted and should include all damage. 1.2 Issues and key findings Can the insurer partially deny this claim? Yes. This is because the exchanged information shows the damage was caused by a leaking shower. Damage caused by that is excluded in the policy. Given this, the insurer’s position to partially accept the claim is fair in all the circumstances. 1.3 Determination This determination is in favour of the insurer. The insurer’s position on this claim is fair. Determination | Case number: 1010793 Page 3 of 4 2 Reasons for determination 2.1 Can the insurer partially deny this claim? Damage caused by a leaking shower The insurer relies on a report by plumber IP. IP attended the property on 23 February 2018. IP conducted various tests. This included pressure tests of the cold and water lines, toilet drainage and other areas. All passed except the flood test of the shower recess. IP concluded the waterproof membrane has failed. This allowed water to penetrate and cause the damage. The complainant disputes this. She notes IP conducted other tests for other claims that were incorrect. She says when stripping the bathroom, there was nothing showing the waterproofing membrane failing. She says there is likely a leak elsewhere. Having considered all the exchanged information, I am persuaded by IP’s report. Tests were conducted. The only one that failed was the flood test of the shower recess. Photos were provided to show its failure. The complainant’s photos of the stripped bathroom do not contradict this. Having viewed them, I cannot see the waterproof membrane being intact or there being damage inconsistent with IP’s conclusion. No other expert opinion was provided. No information supports a leak elsewhere. IP’s opinion is logical and supported by the available photos. Therefore, I accept the damage being claimed for the upstairs bathroom was caused by a leaking shower. Insurer’s position is fair The complainant’s policy covered her for damage caused by insured events. Escape of liquid is the only applicable insured event for this claim. However, it contains this exclusion: Excludes loss or damage resulting from liquid escaping from a shower recess I accept this applies given the damage was from water escaping from a shower recess. Therefore, the insurer could have denied this claim based on this exclusion. The insurer instead partially accepted the claim and is standing by that. However, it is not prepared to accept any further damage. Given the exchanged information shows the claim was not payable in the first place, then the insurer’s position is fair in all the circumstances. I acknowledge the complainant’s concerns about the insurer’s position on the other claims, the delay in assessing this claim and the increased costs of repairs. The other claims are not relevant as they each should be assessed on their merits. Even if I accept there was an increase in the cost of repairs due to the delays, the insurer has agreed to partially pay a claim in circumstances when it was not liable to do so. In such a case, I do not consider it fair that it should pay more. Determination | Case number: 1010793 Page 4 of 4 3 Supporting information 3.1 The AFCA process AFCA’s approach is ba sed on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.