Home / Suncorp Group / Determination 1008046
Determination 1008046
Complainant sought total loss settlement for repeated flood damage; insurer offered cash settlement for repairs
Summary
The complainant's home was flooded twice and she sought a total loss settlement as the property is a continuing flood risk. AFCA found the home repairable and the insurer's offers fair, deciding in favour of the insurer.
The policy pays the sum insured only where repair cost exceeds it, the damage was repairable at about one third of the sum insured, so the insurer's cash settlement offers were fair.
Issues
- Claim amount dispute primary · not upheld
“The panel is satisfied the insurer's offers are fair; property is repairable so total loss settlement refused.”
- Product terms interpretation secondary · not upheld
“Complainant said the March 2023 flood was not a single event; sum insured is only paid where repair cost exceeds it.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 1008046
Financial firm AAI Limited
Determination | Case number: 1008046 Page 1 of 5
Case number: 1008046 23 November 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer)
and lodged claim 31 October 2022 for flood damage. The insurer accepted liability and cash
settled the claim with the building damage settled for $78,205.20.
On 13 March 2023 the complainant’ s home was further flood damaged. Repair works from
the previous claim had not commenced and there was no further damage caused by the flood
other than cleaning and treatment. The insurer offered to cash settle the second claim for
$13,918.26. The complainant wants the claim to be settled as a total loss. She says her home
is a continuous flood risk and this has made the home unliveable.
The insurer acknowledges the home is a flood risk but says there is insufficient information to
determine the home is a total loss. It has offered to settle the first claim for $105,074.75, the
second claim for $16,005.90, and pay temporary accommodation until 14 March 2024.
1.2 Issues and key findings
Is the complainant entitled to have the claim settled as a total loss?
No. The property may be a flood risk, but the available information confirms the damage is
repairable with the insurers repairer prepared to warrant repairs.
Is the insurers offer to settle the claims fair in the circumstances?
Yes. The panel is satisfied the insurers offers as follow are fair in all the circumstances:
$105,074.75 for the first claim inclusive of 15% contingency fee
$16,005.90 for the second claim inclusive of 15% contingency fee,
temporary accommodation until 14 March 2024,
Why is the outcome fair?
While the panel empathises with the complainant’s position, the insurer is not obligated to go
beyond the policy terms. The complainant does not dispute that the repairs can be completed
based on the scope of works provided. It is fair in the circumstances for the insurer to settle
the claims in accordance with the terms of the policy.
1.3 Determination
This determination is in favour of the insurer. Within 14 days of receiving notice of the
complainant’s acceptance of this determination the insurer is to:
$26,869.55 being the balance of the settlement of the first claim
$16,005.90 for the second claim inclusive of 15% contingency fee
pay temporary accommodation until 14 March 2024.
The insurer is otherwise entitled to rely on the terms of the policy to limit the extent of its
liability.
Determination | Case number: 1008046 Page 2 of 5
2 Reasons for determination
The complainant is being represented. For sake of brevity, any reference to the complainant
is reference to the representative.
2.1 Is the complainant entitled to have the claim settled as a
total loss?
No. The property may be a flood risk, but the available information confirms the damage is
repairable with the insurers repairer prepared to warrant repairs.
Policy covers damage caused by insured events
The insurer ’s policy documents are made up of the Certificate of Insurance (COI) and the
Product Disclosure Statement (PDS). The complainant has not disputed that the policy
documents were issued to her. The COI lists the sum insured as $344,300 and the PDS
covers a list of insured events. Page 42 of the PDS states:
Loss or damage to the home or contents
We cover
When you have home cover, we cover loss or damage to your home at the
insured address caused by an insured event during the period of insurance.
On page 118, event is defined as:
[..] a single event, accident or occurrence which you did not intend or expect to
happen that is covered by your policy. A series of incidents attributable to one
source of originating cause is deemed to be the one incident.
Circumstances of claim
The complainant’s property was flooded in September 2022 with flood waters entering the
property above floor height.
The insurer accepted the claim and elected to cash settle both home and contents damage.
The complainant does not dispute the contents settlement or that she was paid $78,270 to
settle the damage to the building. In addition, the complainant is being paid for temporary
accommodation.
The complainant did not commence any repairs and was in temporary accommodation when
the property was again flooded in March 2023.
The level of flooding was similar to that of the first flood with the insurers assessor recording
no additional damage. The assessor considered all that was required was a clean and
microbial treatment. The insurer agreed to pay a further $13,918.26 for the clean and
treatment. The insurer continued to pay the temporary accommodation under the first claim.
The complainant says the home should be declared a total loss as it is uninhabitable due to
the constant flood risk. The insurer says the home is repairable and its trades would be
Determination | Case number: 1008046 Page 3 of 5
prepared to warrant the work if requested. The insurer does not dispute the flood risk but says
this is an issue between the complainant and local council/government.
Complainant says home should be settled as a total loss
The complainant says after the September 2022 flooding, the local council commissioned a
flood study of the town (Plan). The Plan was an independent study developed by WMA, which
is a company specialising in hydrological and hydraulic studies of waterways and floodplains.
The study includes long-term strategies for the council.
The Plan states the insured property has an annual exceedance prediction (AEP) rating of
20%. This means future flooding above floor level is expected at least every five years.
The complainant acknowledges the March 2023 flood event did not exceed the insured value
of the house. The complainant says the home is uninhabitable due to the frequency of future
flooding. The complainant says it poses a risk to her life, health and safety, including any
emergency responders who may have to evacuate her.
The complainant also says the March 2023 flood event is not a single event because the Plan
indicates the floods would be frequent and ongoing. She considers a total loss should be
calculated to consider not only the events which have occurred, but the future floods which
are inevitable.
The complainant also says she has tried to work with the council since 2016. Her
submissions included petitions to the council to have this issue investigated. She advised that
the council has no plans to remediate the creek nearby her home (which is subject to
flooding).
Property is not a total loss
The panel acknowledges the complainant has now obtained the Plan from her local council,
which sets out the likely future risk of flood. The panel acknowledges it is very likely that the
complainant ’s propert y will be flooded should another flood event occur. These circumstances
may make it difficult for the complainant to obtain flood insurance.
The policy provides cover for an event defined as a single event, accident or occurrence
which you did not intend to happen. The policy provides cover in the circumstances where
such an event has caused loss or damage. The policy does not provide indemnity for loss or
damage that has not been suffered.
The PDS set out how the insurer will settle a claim. Once the insurer has had a scope of
works prepared, it will assess the quote and determine whether the repair, replace or cash
settle a claim for the cost to repair/ replace. The sum insured is only paid where the amount
assessed to repair the damage exceeds the sum insured.
It is agreed that the damage to the building does not exceed the sum insured. If fact it is
assessed at about one third of the sum insured.
While the panel accepts the stress and anxiety the complainant faces living in such a flood
prone area, the available information confirms the property is repairable. The insurer ’ s builder
has confirmed it would warrant the repairs, but the complainant requested a cash settlement.
It is fair in the circumstances for the insurer to rely on the terms of the policy to refuse the
complainant’s claim for a total loss settlement.
Determination | Case number: 1008046 Page 4 of 5
2.2 Is the insurers offer to settle the claims fair in the
circumstances?
Yes. The panel is satisfied the insurers offer to pay;
$105,074.75 for the first claim inclusive of 15% contingency fee
$16,005.90 for the second claim inclusive of 15% contingency fee,
temporary accommodation until 14 March 2024,
is fair in all the circumstances.
Insurer’s settlement offer is fair in the circumstances
The insurer had settled the first claim (…266) after obtaining a scope of works and quote from
RCC, one of the insurers panel builders. The complainant does not dispute the scope of
works. The insurer cash settled the repairs to the building for $78.205.20 and has continued
to pay the complainant’s temporary accommodation.
The insurer has acknowledged that there was additional damage not included in the
settlement for …266. As a result, the insurer has offered to increase the settlement to
$105,074.75 which includes additional damage of $13,099.35 plus a 15% contingency.
Based on the scope of works provided the panel accepts this is fair and reasonable. As the
insurer has already paid $78,205.20 in settlement of the claim it must now pay $26,869.55
being the balance of the settlement for claim …266 .
According to the insurer ’ s assessor the flood level in the March 2023 flood was the same as
the earlier flood and as damage from that flood had not been repaired, no further damage
was caused. The only repairs involved cleaning and treatment. KBA provided a quote of
$13,918.26 to complete the works. The complainant has not dispute this quote.
The insurer has offered $16,005.90 to cash settle the second claim based on KBA’s quote
plus a 15% contingency fee. In the absence of any evidence to dispute the quote the panel
considers the offer fair and reasonable to settle the second claim.
Temporary accommodation to continue
The insurer notes the complainant will have exhausted the temporary accommodation from
the first claim on 31 October 2023. It has offered to pay temporary accommodation until 14
March 2024.
The panel accepts this is fair and reasonable given the nature of the repairs identified in the
scope of work and likely duration of the repair process should the complainant choose to
complete the repairs.
2.3 Why is the outcome fair?
While the panel empathises with the complainant’s position, the insurer is not obligated to go
beyond the policy terms. The complainant does not dispute that the repairs can be completed
based on the scope of works provided. It is fair in the circumstances for the insurer to settle
the claims in accordance with the terms of the policy.
Determination | Case number: 1008046 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.