Home / IAG / Determination 1005894
Determination 1005894
Storm damage to retaining wall excluded; claim denied in part, cash settlement of fence repairs
Summary
The complainant claimed storm damage to a fence and retaining wall after a December 2022 storm. The insurer accepted the fence claim, denied the retaining wall as excluded, and offered a cash settlement. AFCA found the retaining wall excluded, the insurer's cash settlement fair, and ordered $9,120 plus $1,000 non-financial loss.
Storm damage to retaining walls is excluded by the policy, and the proximate cause of the wall damage was pre-existing soil movement and material issues rather than a listed event.
Issues
- Claim denial primary · not upheld
“Damage to the retaining wall is excluded by the policy. The insurer is entitled to deny the claim for damage to the retaining wall.”
- Claim amount dispute secondary · not upheld
“I am satisfied the insurer's cash settlement offer is fair and reasonable.”
- Delay secondary · upheld
“It is not in dispute the insurer should have handled the claim better... I accept this caused some delay.”
- Poor communication secondary · upheld
“The insurer acknowledges there was some confusion around whether the fence was partly or solely owned by the complainant.”
Subjects and remedies
pay claimpay non financial loss
Text of the determination
Determination
Case number 1005894
Financial firm Insurance Australia Limited
Determination | Case number: 1005894 Page 2 of 7
Case number: 1005894 11 April 2024
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy underwritten by the financial firm (insurer).
On 30 December 2022, the complainant lodged a claim for damage to his fence and retaining
wall following a storm on 21 December 2022.
The insurer accepted the claim for damage to the fence. However, the insurer denied the
claim for damage to the retaining wall because storm damage to retaining walls is excluded
by the policy.
The complainant wants the insurer to accept the claim for damage to the retaining wall
because:
damage to the retaining wall was caused by the damaged fence, not the storm
the insurer delayed determining how to repair the fence, and in that time, weather events
caused further damage to the fence and retaining wall, and
the retaining wall must be fixed before the fence can be fixed.
1.2 Issues and key findings
Should the insurer cover the damage to the retaining wall?
No. Damage to the retaining wall is excluded by the policy. The complainant has not
established the insurer’s claims handli ng caused further damage to the retaining wall such
that it should be liable for it. The insurer is entitled to deny the claim for damage to the
retaining wall. However, the insurer has offered to cash settle the claim in line with the
complainant’s repair quote, which includes retaining wall removal costs.
Why is the outcome fair?
The outcome is fair because the insurer has offered to cash settle the claim in line with the
complainant’s repair quote, which includes removal costs the insurer is not liable for. The
insurer’s addition of a 15% uplift on the quote is also fair and reasonable to account for
contingencies.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainant accepts this determination, within 14 days of receiving the complainant’s
acceptance the insurer must, subject to any deductions under the terms and conditions of the
policy (not including the excess the insurer agreed to waive), pay the complainant:
$9120, being the amount quoted for the accepted repairs, plus GST and a 15% uplift to
cover contingencies, and
$1,000, being the amount the insurer offered as non-financial loss compensation.
Determination | Case number: 1005894 Page 3 of 7
2 Reasons for determination
2.1 Should the insurer cover the damage to the retaining wall?
No. Damage to the retaining wall is excluded by the policy. The complainant has not
established the insurer’s claims handling caused further damage to the retaining wall such
that it should be liable for it. The insurer is entitled to deny the claim for damage to the
retaining wall. However, the insurer has offered to cash settle the claim in line with the
complainant’s repair quote, which includes retaining wall removal costs.
Complainant must establish a valid claim
It is established insurance law that the complainant carries the initial onus to show a loss of a
type covered by their policy. The complainant must show this on the balance of probabilities
(i.e. that it is more likely than not).
If a claimable loss is shown, the onus shifts to the insurer to show on the balance of
probabilities the loss is not covered, either by way of one of the policy exclusions or on some
other basis.
Cover under the policy is subject to the conditions, limitations and exclusions specified in the
policy. There is no dispute the complainant was provided with the relevant policy
documentation, including the certificate of insurance (COI) and product disclosure statement
(PDS) at inception of the policy. Therefore, I am satisfied the insurer is entitled to rely on the
policy provisions to assess its liability under the claim.
Insurer says damage to retaining wall is excluded
The policy covers loss or damage which occurs during the period of insurance caused by a
listed event. It is not in dispute ‘ storm ’ is a listed event. The policy does not cover loss or
damage to retaining walls caused by storm.
The insurer accepted the complainant’s claim for damage to the fence and offered to cash
settle the repairs to the fence, as listed in the complainant’s repair quote. The insurer denied
the claim for damage to the retaining wall because, it says:
the retaining wall was not fit for purpose
soil movement over an extended period caused the panels to rotate and lean
the storm exacerbated the damage to the retaining wall
the damage to the retaining wall was not caused by storm, or any other listed event
if the damage to the retaining wall was caused by storm, it is excluded by the policy.
The insurer instructed a builder (MC) to assess the damage. MC completed a report dated 12
January 2023. The MC report says:
I am of the opinion that a Super 6 fence retaining 2 x 500mm high build-up of
reactive soil that is subject to seasonal movement would not be considered to be
structurally adequate. I am also of the opinion that the wall has been subjected to
reactive soil movement causing it to rotate and lean causing the fence to crack. In
addition; I am of the opinion that this has occurred over a period of time and is not
the result of a singular incident. It is not the result of storm activity.
Determination | Case number: 1005894 Page 4 of 7
The insurer instructed MC to provide a second report (second MC report) dated 14 June
2023. The second MC report says:
I am of the opinion the damage to the property is consistent with damages
expected from a storm.
However, the second MC report does not comment specifically on the retaining wall.
The insurer also instructed a builder (KB) to assess the damage. KB completed a report
dated 10 July 2023. The KB report:
comments on the material used to build the retaining wall
advises the complainant is to remove and replace the retaining wall with a suitable system ,
and
lists the cause of damage as ‘storm event/strong winds’.
The insurer also instructed an engineer (EE) to assess the damage. EE completed a report
dated 21 August 2023. The EE report says:
the leaning of the asbestos super six walls on the north and western sides cannot
be attributed to a single event, but also influenced by external factors. The
presence of a nearby small garden and medium-sized trees could contribute to
variations in soil stability and pressure against the wall. Proper consideration of
these factors, alongside weather conditions, is crucial for addressing the leaning
issue and ensuring the long-term stability of the retaining wall.
Nevertheless, the recent storms may have exacerbated the issues and caused
the walls to tilt further. However, aerial imagery from year 2020 and onwards
show distortion to the western and northern boundary walls as the lines are not
straight. This proves that the issue is pre-existing and not caused by a single
event.
Damage to retaining wall not covered by policy
The complainant says the damage to the retaining wall was caused by the broken fence.
Damage can have more than one cause. In deciding whether the policy responds, it is
necessary to identify the proximate cause of damage. The proximate cause is not necessarily
the first or the last or the sole cause of the loss. It is the effective or dominant or operative
cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined
for the qualities of reality, predominance and efficiency as the active, efficient cause that sets
a relevant chain of events in action. If one cause would have caused the harm in any case,
and the other would not have done so in the absence of the first, the first is the proximate
cause.
In this case, the reports the insurer provided identify existing issues with the retaining wall
material and soil stability. The reports also identify the damage to the property is not
consistent with a storm, however this event may have exacerbated the existing issues.
In either case, the damage is excluded by the policy. This is because:
Determination | Case number: 1005894 Page 5 of 7
if I accept the damage to the retaining wall was caused by various factors over time, the
complainant has not established a claimable loss under the policy, as the damage was not
caused by a listed event
if I accept the damage to the retaining wall was caused by the damaged fence, the efficient
cause that set the chain of events in action would still be the storm (which is excluded by
the policy).
In these circumstances, the insurer is entitled to deny the claim for damage to the retaining
wall.
Complainant says further damage caused by insurer’s delay
It is not in dispute the insurer should have handled the claim better. The insurer
acknowledges there was some confusion around whether the fence was partly or solely
owned by the complainant. This is reflected in the reports and initial quote, which assum ed
the fence was jointly owned. I accept this caused some delay as the insurer had to liaise with
KB and obtain an updated quote.
The complainant says the insurer’s delay and failure to repair the damage to the fence
caused further damage to the retaining wall. The photographs included in the MC report are
consistent with the photographs included in the EE report and the KB report which were
completed approximately six to eight months after the MC report. Considering the available
photographs, I am not satisfied the complainant has established the retaining wall has
sustained further damage while the claim and complaint have been on foot.
The KB report identified the complainant needed to remove and replace the asbestos fence
sheets that had been installed as a retaining wall with a suitable retaining system. The EE
report recommended the complainant use the appropriate methods available in the market for
constructing the retaining wall.
Even if I accept the retaining wall sustained further damage during the claims handling
process, the exchanged reports show the retaining wall still needed to be replaced. As
damage to the retaining wall is excluded by the policy, this is the complainant’s obligation.
Any further damage to the retaining wall would not change the complainant’s liability to
replace the retaining wall.
The insurer offered the complainant $1,000 non-financial loss compensation for its claims
handling. I consider this to be fair and reasonable because:
the insurer caused some delay in progressing the claim, and
the complainant has not provided persuasive information to show the retaining wall has
been further damaged while the insurer was considering the claim, such that the insurer
should be liable for any part of the damage.
Finally, I note the complainant says the insurer’s delay meant it breached sections 13, 47, 54
and 57 of the Insurance Contracts Act 1984 (Cth) (Act). The complainant has not explained
specifically how the insurer breached these sections of the Act. As such, the complainant has
not established his claims in that regard.
Insurer offered to cash settle the claim
The PDS outlines how the insurer may settle a claim, including cash settlement where the
insurer decides it is appropriate.
In this case, the insurer decided a cash settlement was appropriate because of the pre-
existing condition of the fence. The MC report recommended a cash settlement because the
Determination | Case number: 1005894 Page 6 of 7
material used to build the fence was discontinued, and no identical alternative product was
available.
The KB report also recommended cash settlement, as the retaining wall was not fit for
purpose, and it would not be able to warrant the fence replacement.
The exchanged information shows the insurer was able to reasonably settle the claim by 11
July 2023. However, since then, the insurer has offered:
to cash settle the claim in line with items listed in the complainant’s repair quote (totalling
$9,120), plus GST and a 15% uplift
to waiver of the excess in the amount of $600
compensation of $1,000.
In these circumstance s, I am satisfied the insurer’s cash settlement offer is fair and
reasonable. The insurer’s offer includes the costs to remove the retaining wall. As this is not
covered by the policy in this case, the complainant would otherwise be liable to pay for the
removal of the retaining wall. The insurer agreed to cover these costs in the quote. I am
satisfied this is fair and reasonable.
The insurer’s addition of a 15% uplift to account for contingencies (such as increased prices)
is also fair and reasonable, as the complainant has expressed concerns about price
increases.
In addition to the $1,000 non-financial loss compensation, the insurer offered to waive the
excess, which would usually be applied. Considering the above, I accept the proposed
settlement is fair. I am not satisfied the insurer is required to increase its cash settlement
offer.
2.2 Why is the outcome fair?
The outcome is fair in the circumstances
The outcome is fair because the insurer has offered to cash settle the claim in line with the
complaina nt’s repair quote, which includes removal costs the insurer is not liable for. The
insurer’s addition of a 15% uplift on the quote is also fair and reasonable to account for
contingencies.
Determination | Case number: 1005894 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.