Home / QBE / Determination 1005254

Determination 1005254

Settlement of accepted storm claim for building and contents, delays in progressing the claim, and non-financial loss

FirmQBE
Decided2024-03-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed$319,834
SourceAFCA PDF

Summary

The complainant's accepted storm claim stalled after the insurer's engineer failed to scope repairs and he refused further access. AFCA partly upheld the complaint, requiring a cash settlement of building, pool, mould and contents claims, a continued meal allowance and $3,000 non-financial loss.

Evidence was insufficient to quantify the loss precisely and the relationship had deteriorated, so a fair cash settlement and compensation for avoidable delay were ordered.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterpay claimpay non financial loss

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 1005254 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 1005254 Page 1 of 9 Case number: 1005254 21 March 2024 1 Determination overview 1.1 Complaint The complainant holds a building and contents insurance policy with the financial firm (insurer). He lodged a claim after the insured property was affected by a storm in March 2022. The insurer initially denied the claim and the complainant lodged a complaint with AFCA disputing the denial. That complaint was then resolved, when the insurer accepted liability for the damage caused by the weather event. The complainant has now made a new complaint to AFCA as he is unhappy with the insurer’s delays in progressing the accepted claim, and with its settlement offer. The insurer appointed an engineer but they did not provide a scope of works or quote for the repairs, and the complainant has since then not allowed any further access to the property. The complainant believes the insurer has enough information to finalise the claim. 1.2 Issues and key findings How should the claims be settled? The available information is not sufficient to identify precisely the full extent of the claim- related loss and damage or the likely cost of repair/replacement. The complainant has declined any further assessments or inspections. In the particular circumstances, and to bring finality to the matter, the insurer is required to cash settle the building and contents claims as set out in detail in section 2.1 below. Is compensation for non-financial loss warranted? Yes. Compensation of $3,000 for non-financial loss is warranted, given the complainant’s particular vulnerabilities and the insurer’s handling of the claim which caused avoidable delay. Why is the outcome fair? The current cash settlement offers are, on balance, insufficient to address all the claim- related loss and damage (even though the complainant has not established the full extent of the loss he was claiming specifically for contents). Given the deteriorated relationship between the parties, further assessments cannot be conducted. In order to bring finality so that the complainant can move forward, it was necessary and is fair for the cash settlement and compensation amounts to be based on a consideration of the information which has been provided, and in the context of the particular circumstances. 1.3 Determination This determination is partly in favour of the complainant. Within 14 days of receiving notification that the complainant accepts this determination, the insurer is required to cash settle the claims by paying:  $25,850 plus a 20% contingency for the building (painting and roof) repairs  $8,938 plus a 20% contingency for pool repairs Determination | Case number: 1005254 Page 2 of 9  $30,000 for the remaining claim-related building and associated work (including pavers, timber flooring, subfloor, carpets, mould remediation)  $4,763 plus 20% contingency for mould restoration of the dining suite and cabinet  $120,000 for the remaining contents  meal allowance of $125 per person per week for a further 3 months from the date of this determination  $3,000 non-financial loss compensation. The insurer is not required to take any other action. Determination | Case number: 1005254 Page 3 of 9 2 Reasons for determination 2.1 How should the claims be settled? History of the claims to date The complainant lodged a claim on 4 May 2022 for contents damage due to a storm. The complainant advised there was mould on the furniture and other contents. He then also lodged a claim on 2 June 2022 for building damage caused by the same weather events. The insurer assessed the claims between June and September 2022. The insurer notified the complainant on 29 September 2022 that the contents and building claims were denied, however, it agreed to accept liability for damage to the pool. The complainant lodged the previous AFCA complaint in January 2024 disputing the insurer’s decision to deny the claim s. That complaint was resolved in June 2023 on the basis that the insurer agreed to:  cover the damage to the building caused by the storm  cover the damage to the contents items caused by the storm  accept the damaged pavers  provide weekly meal allowance payments (of $125 per person) while the home was unliveable due to the damage and while the complainant continued to reside in his caravan  pay $4,000 to the complainant for non-financial loss compensation  reimburse the complainant for his expert report costs ($1,995)  appoint an assessor to arrange the necessary inspections of the property to determine the settlement (scope and quantum) for the building and contents items. The parties agreed the insurer was to appoint representatives to re-assess the damage caused by the storm event (for the building and contents) in order to progress the claims. However, the engineer appointed by the insurer failed to address the scope and costing of claim-related repairs. The complainant brings this current complaint to AFCA as he is unhappy with the insurer’s delays in progressing the claims, which he says has allowed more damage to occur. Complainant unhappy with insurer ’s proposed actions and offers Since the current complaint was brought to AFCA, the insurer has proposed to:  cash settle the complainant $25,850 the building repairs plus a 20% contingency for the transfer of risk (based on quotes provided by the complainant for painting and roof repairs)  arrange for a technician to re-assess the pool and pool paver damage and cash settle the repairs for the pool and pool pavers  appoint a hygienist to attend to mould remediation and cash settle based on this quote, or a quote provided by the complainant  pay a cash settlement of $100,000 for the contents without requiring any further substantiation of loss  pay $2,500 in non-financial loss compensation. It also says it is willing to consider any quotes the complainant wishes to provide. In response, the complainant rejected the offer for the contents. He is seeking the full sum insured for contents ($319,834). He also remains dissatisfied with his living conditions and meal allowance. As well, h e states the insurer’s representatives have caused further damage to his property during their inspections. Determination | Case number: 1005254 Page 4 of 9 The complainant believes the insurer has enough information to make a decision on the scope and quantum of the claim-related damage (including damage not specified in its current offers), and so he has refused further access or assessments. Insurer’s latest offer does not address all aspects of the accepted claims Proposal for building and pool repairs not complete or fully quantified  The insurer ’s offer of $31,020 ($25,850 plus a 20% contingency) for accepted building repairs is based on quotes obtained by the complainant for painting work ($15,950) and roof repairs ($9,900). Both of those quotes were from June 2023.  The insurer’s offer does not address the accepted damage to timber floor boards and subfloor, or carpet. Neither party has provided quotes for this work, nor for any other likely associated work (such as the cleaning, electrical works, underfloor plumbing which the complainant has indicated would be required).  The insurer points out the complainant ’s repair quotes do not allow for mould remediation. It has sought the complainant’s agreement to it arranging for a hygienist to attend, provide a scope of works and quote for any necessary work, which it says it would then cash settle. Alternatively, the insurer has said it will consider any quote obtained by the complainant. The complainant has not allowed the insurer further access to the property for this purpose, and has not provided a quote of his own.  In addition, the insurer requested that its pool technician reattend the property to ensure all necessary pool repairs are catered for. It said it would then settle the required pool repairs based on a new quotation from that assessment. The complainant had previously provided an October 2022 quote for $8,938 from his preferred pool repairer PW. I understand he is only willing to allow PW to re-attend to re-assess the pool damage. No updated quote has been provided.  The insurer also notes the complainant’s quotes do not include the pool paver repairs. It has offered to have a trade attend to assess, scope and quote for the work, which it would then cash settle. Alternatively, it says it will consider a quote provided by the complainant. Again, the complainant has refused to allow the insurer access and has not provided his own quote. I acknowledge the insurer has made reasonable offers to re-assess and cost the damage, and these have been declined by the complainant. As a result, its settlement proposal to date remains incomplete and inadequate to meet its liability for the building damage. I also acknowledge the complainant’s desire to avoid further investigation and intrusion. However, that means the information currently available is not sufficient to allow a precise updated costing for claim-related repairs (particularly since he has also not provided any further quotes of his own). In the interests of bringing finality to this matter, I consider it fair in the circumstances that the insurer cash settles this component of the claim by paying:  $25,850 plus a 20% contingency for the building (painting and roof) repairs  $8,938 plus a 20% contingency for pool repairs  $30,000 for the remaining claim-related building damage and associated work (including pavers, timber flooring, subfloor, carpets, mould remediation). Determination | Case number: 1005254 Page 5 of 9 Inconclusive information regarding possible f urther damage by the insurer’s representatives I acknowledge the complainant’s submissions that the insurer’s representatives caused additional damage to his property (including to the roof and pool pavers). However, I am not satisfied the evidence confirms that is the case. Even if, for example, nece ssary attendances and investigations by the insurer’s representatives meant already compromised areas of the property were further impacted, that does not automatically mean the insurer should be held liable. That would particularly apply in circumstances where the affected area (if any) would need to have been repaired in any case. The insurer is not liable for further damage claimed to have been caused by its representatives. Full sum insured for contents damage not substantiated The complainant is now claiming the full sum insured ($319,834.00) for his contents. He says further damage has occurred given the delays in dealing with the claim. By way of evidence of the loss, he has however only provided a partial list of contents with estimated replacement costs, photographs and the restorer’s inventory prepared before the contents claim was originally declined. He has not provided evidence of the extent (if any) of any further damage, or established that all items are non-restorable. The insurer acknowledges there has likely been further damage. However, it says the complainant has not provided sufficient evidence of loss to justify payment of the full sum insured for contents. That includes denial of the insurer’s request for acces s to further assess the remaining contents. The insurer has offered $100,000 in an attempt to finalise this part of the claim. That is an increase from the $66,802.80 previously offered. I note that the complainant has indicated some contents would be restorable. For example, a May 2022 estimate has been provided quoting $4,763 for mould restoration of a dining suite and cabinet which I understand is of particular sentimental value to the complainant. I acknowledge the complainant’s concerns about the lik ely extent of damage to contents, and also the challenge of attempting to itemise and quantify the loss he is claiming (particularly given some items have been disposed of). However, it is not unreasonable for the insurer to require more detailed and conclusive evidence, or at least the opportunity to inspect and re- assess the remaining contents. I am not satisfied the complainant has established an entitlement to the full contents sum insured. At the same time, however, it is relevant to take account of the time which has passed since the claim was first made (including avoidable delays), and the issues and apparent confusion at certain points in the process about what needed to be done with the contents in the meantime. So while the currently available evidence regarding damaged contents is (as with the building damage) not sufficient to allow a precise quantification of loss, I consider it fair, in the particular circumstances, that the insurer pays $120,000 for contents. As well, it is required to cash settle for mould remediation of the complainant’s dining suite and cabinet by paying $4,763, plus a further 20% to allow for the age of the quote and for contingencies. Determination | Case number: 1005254 Page 6 of 9 Meal allowance not a policy benefit, but should continue The policy provides that if a building claim is accepted and the house is unliveable, then the insurer will pay for ‘similar’ temporary accommodation while the house is being repaired. That benefit is limited to a period of up to 12 months from the date of damage, or 10% of the building sum insured, whichever is less. The insurer has offered temporary accommodation for the complainant and his wife until such time as the claim-related repairs have been completed and the house is liveable. However, the complainant points out he and his wife have particular requirements including that the accommodation be located within one kilometre of his house and medical services, single storey suitable for mobility impaired, with a gun safe. Since those specifics could apparently not be met, he says he opted to stay in his caravan on the property. In the meantime, the insurer has continued to pay the complainant and his wife a weekly meal allowance of $125 per person as a gesture of goodwill. The insurer points out that is not a policy benefit, but is something it decided to do for policy holders af fected by the early 2022 catastrophic weather events. The building damage claim has been significantly protracted, including for reasons for which the insurer is responsible. The amounts being paid by the insurer (effectively as an alternative to the full temporary accommodation benefit) have been much less than it might reasonably be expected to have had to pay for alternative accommodation. For those reasons, and having regard to the complainant’s personal circumstances, I do not consider the policy limit of 12 months from the date of damage for the payments should apply (and it has already been passed in any case). However, because the complainant is being cash settled for the claim-related work, then the insurer no longer has control over the timing of those repairs, and it would not be fair for the payments to continue indefinitely. The complainant should, of course, take all reasonable steps to finalise the claim-related repairs so that the house is liveable again as soon as possible; but I also appreciate the current uncertainty around the likely duration of repairs, even once the complainant has actually obtained quotes and engaged trades. In the circumstances, I consider it fair and reasonable that the insurer continues to pay the complainant the meal allowance of $125 per person per week for 3 months from the date of this determination. 2.2 Is compensation for non-financial loss warranted? Yes. The insurer must pay $3,000 in non-financial loss compensation for its handling of the matter since the previous AFCA complaint was finalised. AFCA can award non-financial loss compensation Compensation for non-financial loss may be awarded if the insurer caused the complainant to suffer a significant degree of physical inconvenience, time taken to resolve a situation, interference with their peace of mind or loss of enjoyment of an asset. Compensation is not awarded for the normal degree of inconvenience a person might reasonably expect to suffer when lodging this type of claim or having a problem with the insurer. AFCA takes a conservative approach to assessing compensation for non-financial loss. The maximum amount AFCA can award for non-financial loss is $5,400 per claim. Determination | Case number: 1005254 Page 7 of 9 Complainant has raised several issues of concern The complainant has pointed out that he and his wife are elderly and suffer from serious health issues. He says their health has been further adversely impacted by the insurer’s handling of the matter. In particular, the complainant raised concerns about the insurer failing to assess the damage as agreed when the previous complaint was finalised, which then caused more delays and further inconvenience to himself and his wife, who have been living in their caravan on the property in the meantime. He said they relied on the water supply inside the damaged house to be able to access basic amenities like toilets and bathrooms, and had to enter a mould- infested building to do so. The complainant points out these are not suitable living conditions, especially given their health concerns. He also says it has meant he has continued to be unable to welcome his extended family into his home since the damage occurred. In its email of 16 January 2024, the insurer acknowledged that when it arranged for an engineer to re-assess the damage, the reports indicated that the expert mistakenly assessed the property to determine a proximate cause of damage, rather than to assess repairs that were required to be carried out. I appreciate that had that been done correctly in the first instance, then there should have been at least a reduced (if not totally eliminated) need for the further assessments the insurer has since requested. I accept the insurer’s handling of the matter, combined with the complainant’s particular circumstances, has caused both the complainant and his wife a significant degree of upset and protracted inconvenience, which has led to them losing trust in the insurer and its representatives. The complainant also feels he and his wife have been discriminated against by the insurer because of their age and race. However, on that point, I have seen nothing to establish the insurer has acted towards the complainant and his wife in any way which differs from how it would handle a claim by any other person. I acknowledge the complainant’s difficult and upsetting experience to date, and his concerns about multiple errors he said he found in the insurer’s reports, as well as about further damage having been caused by the insurer’s trades/representatives. The complainant’s frustration and reluctance to agree to further attendances on his property is understandable in the circumstances. However, even if that response was arguably justifiable, that too has unfortunately further contributed to the delay in finalising the matter. It has also meant it is not possible to quantify exactly the cost of claim-related repairs and his loss overall. Compensation is warranted in the circumstances Having considered all the available evidence and having regard to the complainant’s particular circumstances, I agree that compensation is warranted. I consider an award of $3,000 compensation for non-financial loss is fair and appropriate. To be clear, that is for the period since the parties reached agreement on how to proceed with complainant’s earlier AFCA finalised complaint. 2.3 Why is the outcome fair? The incomplete available evidence meant it was not possible to exactly quantify the insurer’s liability for building and contents loss and damage. However, the information does show, on balance, the current cash settlement offers are insufficient to address all the claim-related Determination | Case number: 1005254 Page 8 of 9 loss and damage (even though the complainant has not established the full extent of the amounts he was claiming). Given the prolonged period since the claims were first lodged, and the deteriorated relationship between the parties, it is fair that the matter be brought to finality. The cash settlement and compensation to be paid by the insurer is a fair resolution in the particular circumstances. Determination | Case number: 1005254 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.