Home / Auto & General / Determination 1000902

Determination 1000902

Cash settlement offer for fire-destroyed property based on a low scope of works was inadequate; non-financial loss for claim handling

FirmAuto & General
Decided2024-05-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$481,700
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

After a fire the insurer accepted a total loss claim but offered a cash settlement of $293,595.94 based on a low builder's scope of works. AFCA required settlement at the $418,000 sum insured plus 15% contingency, interest, $2,500 non-financial loss and $500 for a surveyor report.

The insurer did not substantiate why the higher scope of works was unreasonable or that the lower scope was adequate, so a cash settlement must reflect the reasonable rebuild cost, here the sum insured plus contingency.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial lossprovide documents

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 1000902 Financial firm Auto & General Services Pty Ltd Determination | Case number: 1000902 Page 2 of 10 Case number: 1000902 22 March 2024 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim on 4 September 2022 for damage to his investment property following a fire event. The insurer accepted the claim and obtained a scope of works (SOW) from PB, builder. The property was assessed as a total loss. It offered a cash settlement based upon PB ‟s SOW. The complainant agrees to cash settle the claim. However, he says the insurer‟s offer is manifestly inadequate. He also seeks compensation for stress, inconvenience and claim delays caused by the insurer‟s management of the claim. 1.2 Issues and key findings Is the insurer’s building claim cash settlement offer reasonable? No. The insurer has not established that PB ‟s SOW is adequate and sufficient to rebuild the property. It must increase the settlement offer as noted in section 2 of this determination. Is non-financial loss compensation payable? Yes. The insurer‟s handling of the claim has caused the complainant stress and interfered with his expectation of enjoyment and peace of mind. The insurer should pay the complainant the sum of $2,500 in non-financial loss compensation. Why is the outcome fair? The outcome is fair in all the circumstances because the insurer has not established that PB ‟s SOW accurately reflects the reasonable cost to rebuild the property. It is fair that the insurer increases its settlement offer to better reflect the true extent of the damage. 1.3 Determination This determination is in favour of the complainant. The complaint should be resolved in accordance with section 2, below. Determination | Case number: 1000902 Page 3 of 10 2 Reasons for determination Due to the nature of the complaint AFCA considered it appropriate to expedite it in accordance with the Operational Guidelines to the AFCA Rules. Therefore, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. There has been a full exchange of all material information relied upon for this determination and each party has had the opportunity to address any issues raised by the other. All material provided by the parties has been reviewed and considered. The determination follows review of all relevant material. It is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice (including codes of practice) and prior determinations where applicable. Whilst the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only. 2.1 Is the insurer’s building claim cash settlement offer reasonable? No. the insurer has not establish that PB ‟s SOW is adequate and sufficient to rebuild the property. It must increase the settlement offer as noted below. Complainant lodged a claim after fire destroyed his property The complainant owns an investment property. On 4 September 2022 he lodged a claim with the insurer after a fire destroyed the property the previous day. The insurer investigated the circumstances of the loss and accepted the claim. It also arranged for its panel builder, LB, to provide a SOW. LB ‟s initial SOW is in the sum of $487,246.47. The insurer then requested a revised SOW to exclude the cost of debris removal, as this expense had already been paid in November 2022. LB provided a revised SOW dated 15 March 2023 to rebuild the property for $458,496.60. However, the insurer concluded LB ‟s SOW was not fair and reasonable. It then sought a second assessment from another builder, PB, who provided its SOW for $255,300.82 on 21 April 2023. The insurer then offered a cash settlement based upon PB‟s SOW. The complainant agrees to accept a cash settlement of the claim. However, he says the insurer‟s offer based upon PB‟s SOW is manifestly inadequate. The complainant provided detailed submissions regarding what he says is a fair and reasonable settlement sum. Cash settlement should reflect reasonable cost of repairs The terms and conditions of the policy are set out in the policy documents, including the Certificate of insurance and the Product Disclosure Statement (PDS). Under the terms of the policy, the insurer may settle a claim for damage to the complain ant‟s property by:  repairing the damage or rebuilding the property, or  paying the complainant the reasonable cost of doing so. Determination | Case number: 1000902 Page 4 of 10 Where a claim is to be settled by way of a cash settlement, the insurer is required to pay the complainant the reasonable cost of repairing the damage to the property. This means the cash settlement amount should be sufficient to ensure the complainant is able to engage their own contractors to complete the necessary repairs or rebuild. Insurer assessed the claim as a total loss In its submissions dated 31 October 2023, the insurer confirmed the property is a total loss from the claimed fire event. The policy does not define a total loss but states: If we’ve agreed to pay your claim as a total loss If your home or contents or personal effects suffer loss or damage and we have agreed to pay your claim as a total loss, then: • we will pay you an amount equal to the replacement value of the property lost, stolen or destroyed, or the sum insured in your policy documents, whichever amount is lowest (see page 22 of the PDS). Further, the page 19 of the PDS states: How we settle your claim If we agree to pay a claim for loss, theft, or damage to your home, contents, or personal effects, we will pay up to the limits stated in your policy documents. Following discussion with you, we will choose to do one of three things: • repair the damaged property to the same standard, specification, or quality as it was when it was new • replace the damaged property where available, or with the nearest equivalent property available in Australia • pay you the reasonable amount it would cost to repair or replace the property. The policy schedule and the COI shows the property was insured for an agreed value of $418,000. Insurer obtained SOWs As indicated, the insurer arranged for its panel builder, LB, to provide a SOW. LB ‟s revised SOW (excluding the cost of debris removal), is in the sum of $458,496.60. However, the insurer says a second SOW it obtained from another builder, PB, is fair and reasonable. PB‟s SOW dated 21 April 2023 is in the sum of $255,300.82. Determination | Case number: 1000902 Page 5 of 10 Insurer’s cash settlement offer The insurer then made an offer to cash settle the building claim. The insurer offered to pay the complainant $293,595.94, calculated as follows:  $255,300.82 pursuant to the PB SOW of April 2023; and  $38,295.12, being a 15% contingencies uplift. This compensates the complainant for the loss of the lifetime guarantee and the transfer of risk to conduct the work. The complainant did not accept the offer. Complainant says insurer’s cash settlement offer is inadequate The complainant says that the insurer‟s cash settlement offer is inadequate, as it did not represent a reasonable assessment of the cost of rebuilding the property. The complainant says P B‟s costings are too low. He points out that LB ‟s costings were almost double the amount set out in P B‟s SOW. The complainant says the difference between LB ‟s and PB‟s costings is significant. He says: PB inaccurately quoted the property size as 100m2 which effected the quote value. Further, there are significant cost differences between PB and LB as follows …  $24,925 cost difference for a concrete slab  $31,570 cost difference for carpentry costs including construction and supply of timber materials  $23,255 cost difference for kitchen and meals areas, to manufacture, supply and install overhead Melamine to walls, Laminex doors, panels and Laminex benchtops  $12,175 cost difference for brick supply and bricklaying  $8,408.75 cost difference for the supply and installation of concrete roof tiles  $8,988.04 cost difference for plumbing for the veranda, porch, gutters, and downpipes, including supply and installation  $18,720 cost difference for plastering, including supply and install of walls in the kitchen, meals, living area, bedrooms, hallway, WC, and laundry. The above cost differences total $128,041.79. The complainant says LB ‟s costings for the works set out above are in line with the average costs of building in Victoria. Determination | Case number: 1000902 Page 6 of 10 Further, the complainant provided submissions regarding the use of the Insurance Council of Australia link for „Building Ca lculator ‟ (Calculators – Insurance Council of Australia). The complainant says: Whilst this calculator is an estimate only, it does provide an up-to-date estimate of the building costs based on my property, and the calculator is used by insurers to determine the home sum insured. The table below shows the estimated cost to rebuild the property as [outlined] in the Report. An additional column is added to reflect what a build would cost as estimated by CoreLogic if the garage was added in the build dated 5 June 2023. Cost @119.5m2 @146.7m2 (inc. garage) Rebuild Cost $344,348 $387,205 Professional Fees $12,364 $15,178 Demolition $32,699 $40,142 Subtotal $389,411 $442,525 GST $38,942 $44,253 Total $428,353 $486,778 Even if one does not include demolition costs (as they have already been paid), the column totals are:  $356,712 Subtotal + $35,671.2 GST, for a total of $392,383.2 (Column 1)  $402,383 Subtotal + $40,238.3 GST, for a total of $442,621.3 (Column 2). The table below shows the estimated cost to rebuild the property as outline by LB. Rebuild Cost $404,181.51 Professional Fees $12,500 Subtotal $416,681.51 GST $41,681.51 Total $458,496.60 Determination | Case number: 1000902 Page 7 of 10 To provide more context, the complainant says: I refer you to (the insurer‟s) website which provides home and contents replacement costs for further evidence that LB ‟s quote is reasonable … (The insurer) also provides a home insurance calculator, like that of CoreLogic, that is [FR]. [FR] states the estimated cost to rebuild my property is between $313,00 to $450,000. It further clarifies that the estimated cost to rebuild is $361,000 … for the property size of 119.5m2. Further, when including the garage in the property size (146.7m2), [FR] states the estimated cost for a rebuild is between $328,000 to $471,000 and the estimated cost to rebuild is $378,000 … [sic] The complainant says the insurer should therefore cash settle the claim based on the sum insured, as it is lower than LB ‟s quote for $458,496.60. Insurer’s cash settlement offer is not fair or reasonable Having reviewed and considered all information provided by the parties, I am satisfied the insurer‟s offer is not fair or reasonable. This is because of the following considerations. First, the insurer has failed to adequately explain or provide sufficient information regarding why it considers LB ‟s SOW is not fair and reasonable. The insurer merely says it found that LB ‟s SOW was not considered fair and reasonable. This is not enough. The onus is on the insurer to demonstrate and substantiate why LB ‟s SOW was not fair and not reasonable. It has not done so. Second, the complainant provided sufficient information to show that P B‟s costings are insufficient to carry out the rebuild of his property. Further, he says:  PB‟s quote is based on a total size of 100m2 which is lower than the actual size of the damaged property  the actual size of the property is 119.05m2, which includes the porch and veranda  the detached garage, measuring 27.26m2, is not included in PGB‟s quote . Moreover, I note there is no information to demonstrate the insurer has adequately addressed these issues raised by the complainant. Third, as previously indicated, when a claim is to be resolved by way of a cash settlement, the insurer is required to pay the complainant the reasonable costs of repairing the damage to the property or rebuild. This means the cash settlement amount should be sufficient to ensure the complainant is able to engage his own contractors to complete the necessary repairs. The insurer submits PB has confirmed it is able to warrant and complete the rebuild for the quoted amount. On 10 October 2023, AFCA requested the insurer provide written confirmation from PB that its SOW is actionable and that PB is willing to complete the rebuild for the complainant privately. On 31 October 2023, the insurer provided an internal email dated 10 August 2023 indicating PB advised it that, „ the rebuild could be completed and warranted ‟. This information was not directly provided by PB and I consider it of little value. Determination | Case number: 1000902 Page 8 of 10 Insurer required to settle the claim based on sum insured $418,000 Given the matters set out above, I am satisfied the insurer is required to cash settle the complainant in the sum of $418,000, being the sum insured, together with a 15% contingencies uplift to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required. In addition, the insurer must pay interest on the settlement sum of $418,000 in accordance with section 57 of the Insurance Contacts Act 1984 (Cth) from 15 March 2023 (being the date of LB ‟s revi sed SOW) until the date of payment. This is because there has been a likely increase since the SOW was initially provided and the settlement should reflect this. In addition, the insurer is to provide to the complainant an explanation, and breakdown, of how the interest is calculated. 2.2 Is non-financial loss compensation payable? Yes . The insurer‟s handling of the claim has contributed to the complainant‟s stress and his expectation of enjoyment of peace of mind. Accordingly, I am satisfied the insurer should pay the complainant the sum of $2,500 in non-financial loss compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial loss (capped at $5,400) where the insurer‟s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant‟s expectation of enjoyment or peace of mind. However, AFCA adopts a conservative approach to the award of compensation for non- financial loss. AFCA expects complainants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. The onus is on the complainant to establish he has suffered a loss because the insurer mishandled the claim. Compensation for non-financial loss is warranted In this matter, compensation for non-financial loss is warranted because the insurer mishandled the claim overall which, in turn, caused undue stress and inconvenience to the complainant and interfered with his expectation of enjoyment and peace of mind. It also unnecessarily delayed the resolution of the claim. The exchanged material confirms the insurer has apologised to the complainant for his claim‟s experience, including delays and instances wherein information provided to the complainant was not always accurate or complete. In addition, the insurer offered the complainant $1,000 for non-financial loss in recognition of the, “stress and inconvenience caused as result of the claims handling and timeliness”. I agree the payment of non-financial loss compensation is warranted. However, I consider the amount should be increased to $2,500. This more accurately reflects the level of stress, delay and inconvenience suffered by the complainant. Determination | Case number: 1000902 Page 9 of 10 Finally, I note the insurer has agreed to reimburse to the complainant the additional sum of $500 for a surveyor report. I endorse this decision. Insurer to increase settlement of the claim Within 14 days notice that the complainant accepts this determination, the insurer must pay to the complainant the following sums:  $418,000, being the sum insured, together with a 15% contingency on top of this  interest on the sum insured (being $418,000) in accordance with section 57 of the Insurance Contacts Act 1984 (Cth) from 15 March 2023 until the date of payment  $2,500 for non-financial loss compensation  $500 for the surveyor‟s report. In addition, the insurer must provide the complainant with an explanation, and breakdown, of how the interest has been calculated. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because:  the insurer has not established its cash settlement offer is sufficient to undertake the project  the complainant has provided compelling evidence regarding the likely true, realistic cost of the project  an award of non-financial loss compensation is appropriate, fair and reasonable. Determination | Case number: 1000902 Page 10 of 10 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.